260721_Clearwater_SR60_Trailhead_Park-LA_BID_SET_signed_sealed.pdf

PDF 8 MB Posted

Attached to
State Road (SR) 60 Trailhead Park
Solicitation number
26-0052-PR
Issued by
Pinellas County, Clewiston City, Florida

About this file

This is a bid set of construction documents for the State Road (SR) 60 Trailhead Park project prepared for the City of Clearwater, Florida Parks and Recreation Department. The project scope includes creating a new trailhead to support the Courtney Campbell Causeway pedestrian overpass and adjoining trail system, with site improvements comprising landscaping, irrigation systems, concrete pads and sidewalks, site furnishings (benches, picnic tables, Adirondak chairs, waste receptacles, drinking fountain, bike racks, and bike repair station), and regulatory/informational signage. The contract period is three months or 90 consecutive calendar days from the Notice to Proceed. The construction documents include detailed planting plans, irrigation system specifications, and planting specifications prepared by Design Group International, Inc. and Terra Tectonics, with landscape architect Birgit Kibelka (FL LA2035) as the responsible professional. The bid plans are dated 100% Construction Documents as of February 18, 2026, with permit set dated March 17, 2026, under contract number 25000613.

The irrigation system design utilizes reclaimed water as the primary source and incorporates Hunter and Rainbird equipment with solar sync controllers, bubbler systems for trees, rotors for turf areas, and spray heads for shrub and groundcover beds. All landscaping must comply with Florida Department of Agriculture Consumer Services Division of Plant Industry standards and Florida Nurserymen's and Grower's Associations approved practices, with all plant materials graded as Nursery Grade No. 1 or better. The landscape contractor is responsible for providing a written guarantee of plant survivability for twelve months from final acceptance by the City Project Manager. All irrigation shop drawings require approval by the City Project Manager prior to commencement of work, with the system subject to inspection and acceptance before backfilling or mulch installation. The contractor must provide one fixed project sign as described in the contract documents and coordinate all material installations with the City Project Manager at (727) 444-8584.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

design group international, inc.

TERRA

TECTONICS

727-441-4504 ph.

Fl. Reg. Lic. # 254

Clearwater, Fl 33765

1188 Kapp Drive

URBAN DESIGNERS

LAND PLANNERS

LANDSCAPE ARCHITECTS

STATE ROAD 60 & BAYSHORE BLVD

NO. ISSUE / REVISION BY DATE

T H

IS

D

O C

U M

E N

T C

O N

T A

IN

S

C O

P Y

R

IG

H T

E D

M A

T E

R

IA

L A

N D

T R

A D

E S

E C

R E

T I

N F

O R

M A

T

IO

N B

E L

O N

G

IN

G E

X C

L U

S

IV

E L

Y T

O W

IL

L

IA

M

S O

N D

A C

A R

A S

S O

C

IA

T E

S

IN

C

A N

Y U

N A

U T

H O

R

IZ

E D

U S

E

D

IS

C L

O S

U R

E

D

IS

S E

M

IN

A T

IO

N

O R

D U

P L

IC

A

T

IO

N O

F A

N Y

O F

T H

E I

N F

O R

M A

T

IO

N C

O N

T A

IN

E

D H

E R

E

IN

M A

Y R

E S

U L

T I

N L

IA

B

IL

IT

Y U

N D

E R

A P

P L

IC

A

B L

E L

A W

S

CLEARWATER SR60 TRAILHEAD PARK

BK

BK

RECORD DRAWINGS

SURVEYED BY:

REVIEWED BY:

APPROVED BY:

DRAWN BY:

PROJECT ENGINEER DATE

DATE

CITY OF CLEARWATER, FLORIDA

PARKS AND RECREATION

100 S. MYRTLE AVE.

CLEARWATER, FL 33756

INVESTIGATE BEFORE YOU EXCAVATE

CALL 811

ONE CALL

OF FLORIDA

www.callsunshine.com

(800) 432-4770

MIN. 48 HOURS

BEFORE YOU EXCAVATE

SUNSHINE STATE

DWG NAME: FIELD BOOK: SURVEYED BY: SCALE:

CONTRACT NO.: DATE DRAWN: DRAWN BY:

JOB NO.: DESIGNED BY: CHECKED BY:

APPROVED BY

DATE

100% BID PLANS

SHEET NO.:

2509-01

25000613

DESIGN DEVELOPMENT 10/31/2025

2/18/2026CONSTRUCTION DOCUMENTS

SEAL

LI

CENSE

FLORIDA

STATE OF

No. 2035

FL REG.

R E G

LANDSCAPE A

RCH

IT

E C T

BIRGIT KIBELKA FL LA2035

PERMIT SET 3/17/2026

25-1039

1" = 20'

L1

Planting Plan

DETAIL TREE BARRICADE NTS

EX LAWN

MC

SR 60 / GULF TO BAY BOULEVARD

SOD

SOD

SOD

SOD

SOD

SOD

SOD

SOD

WB

Triangle

Sight Visibility

Triangle

Sight Visibility

CE

MULCH

B A Y S

H O

R E B

O U L E

V A R

D

MULCH

MULCH

SOD

SOD

EX. LAWN

EX. LAWN

EX. LAWN

EX. LAWN

EX. LAWN

MF

CES

JI

LI

A

R T

N

AI

R T

S E

D E

P E

R O

H S

Y A

B

TO COURTNEY CAMPBELL PEDESTRIAN OVERPASS

HP

AG

130 SF

AG

705 SF

EXISTING LIVE OAK

AG

96 SF

MF

AG

125 SF

CM

WB

ZP

AG

260 SF

CM

AG

55 SF

CM

PN

10 HP

JI

CES

HP

JI

HP

WB

CM

ZP

ZP

CES

ZP

MC

CES

SAND LIVE OAKS

EXISTING GROVE OF

AG

85 SF

CM

EXISTING SIGN

REMOVED

TREE TO BE

SIGN

MF

AG

29 SF

21"

QL

23"

QL

27"

QG

16"

PE

37"

QV

30"

QG

36"

QG

33"

QG

20"

QG

20"

QG

34"

QG

30"

QG

SR 60 / GULF TO BAY BOULEVARD

B A Y S

H O

R E B

O U L E

V A R

D

LI

A

R T

N

AI

R T

S E

D E

P E

R O

H S

Y A

B

TO COURTNEY CAMPBELL PEDESTRIAN OVERPASS

TREE BARRICADE

TREE BARRICADE

TREE BARRICADE

TREE BARRICADES

NORTH

20 400

PLANTING PLAN

40 800 per the detail.

any construction and on the plan prior to in the locations shown

Install tree barricades

G V design group international, inc.

TERRA

TECTONICS

727-441-4504 ph.

Fl. Reg. Lic. # 254

LANDSCAPE ARCHITECTS

STATE ROAD 60 & BAYSHORE BLVD

NO. ISSUE / REVISION BY DATE

T H

IS

D

O C

U M

E N

T C

O N

T A

IN

S

C O

P Y

R

IG

H T

E D

M A

T E

R

IA

L A

N D

T R

A D

E S

E C

R E

T I

N F

O R

M A

T

IO

N B

E L

O N

G

IN

G E

X C

L U

S

IV

E L

Y T

O W

IL

L

IA

M

S O

N D

A C

A R

A S

S O

C

IA

T E

S

IN

C

A N

Y U

N A

U T

H O

R

IZ

E D

U S

E

D

IS

C L

O S

U R

E

D

IS

S E

M

IN

A T

IO

N

O R

D U

P L

IC

A

T

IO

N O

F A

N Y

O F

T H

E I

N F

O R

M A

T

IO

N C

O N

T A

IN

E

D H

E R

E

IN

M A

Y R

E S

U L

T I

N L

IA

B

IL

IT

Y U

N D

P L

IC

A

B L

E L

A W

S

CLEARWATER SR60 TRAILHEAD PARK

BK

BK

RECORD DRAWINGS

SURVEYED BY:

REVIEWED BY:

APPROVED BY:

DRAWN BY:

PROJECT ENGINEER DATE

DATE

CITY OF CLEARWATER, FLORIDA

PARKS AND RECREATION

100 S. MYRTLE AVE.

CLEARWATER, FL 33756

INVESTIGATE BEFORE YOU EXCAVATE

CALL 811

ONE CALL

OF FLORIDA

www.callsunshine.com

(800) 432-4770

MIN. 48 HOURS

BEFORE YOU EXCAVATE

SUNSHINE STATE

DWG NAME: FIELD BOOK: SURVEYED BY: SCALE:

CONTRACT NO.: DATE DRAWN: DRAWN BY:

JOB NO.: DESIGNED BY: CHECKED BY:

APPROVED BY

DATE

100% BID PLANS

SHEET NO.:

2509-01

25000613

DESIGN DEVELOPMENT 10/31/2025

2/18/2026CONSTRUCTION DOCUMENTS

SEAL

LI

CENSE

FLORIDA

STATE OF

No. 2035

FL REG.

R E G

LANDSCAPE A

RCH

IT

E C T

BIRGIT KIBELKA FL LA2035

PERMIT SET 3/17/2026

25-1039

1" = 20'

L2

Irrigation Plan

MODEL 1404 (1 GPM)

RAINBIRD 1400 SERIES BUBBLER

1/2" FLEX PIPE

LATERAL TEE

FINISH GRADE

LATERAL PIPE

RAINBIRD 1400 SERIES BUBBLER

NTS

FINISH GRADE

4"

SPRAY HEAD ON POLY PIPE DETAIL

NTS

PVC TEE

POLY ELL

(LENGTH AS REQUIRED)

POLY PIPE

POLY ELL

1/2" STREET ELL

6" POP-UP SPRAY HEAD

PVC LATERAL LINE

PAVEMENT

SOLAR SYNC SYSTEM - WEATHER SENSOR

NTS

UP TO 200' AWAY

OR AS SPECIFIED

CONTROLLER

HUNTER PRO-C

PATTERN

AND OUT OF SPRINKLER SPRAY

SUNLIGHT, OPEN TO RAINFALL

THAT MAXIMIZES DIRECT

MOUNT. MOUNT IN LOCATION

SUITABLE POST, POLE, GUTTER

MODEL: SOLAR SYNC SENSOR

TO A POINT 12" BELOW GRADE

SENSOR TO CONTROLLER OR

CONDUIT FROM SOLAR SYNC

WITH THE PCC CONTROLLER.

INTERNALLY WHEN PAIRED

MODULE CAN BE MOUNTED

FROM CONTROLLER.

MOUNT LESS THAN 6' AWAY

MODEL SOLAR SYNC MODULE

COMMUNICATION WIRE

SOLAR SYNC

CONTROL WIRE AND

CONDUIT FOR VALVE

POWER SOURCE

CONTROLLER

DISTANCE, 200 FEET

SENSOR. MAXIMUM TOTAL WIRE

REQUIREMENTS), FROM MODULE TO

TO MEET INSTALLATION CODE

COMMUNICATION WIRE, 18-2(WIRE TYPE

TYPICAL IRRIGATION METER CONNECTION DETAIL

NTS

TYPICAL IRRIGATION SLEEVE UNDER STREET

6 STATION WIRE

TO GROUNDING DEVICE

COPPER GROUND WIRE FROM DECODER 5

4 RED AND BLUE WIRES

PER PLANINCOMING HUNTER JACKET 3

2 DECRSTAKE-10 DRIVEN INTO VALVE BOX

1 ICD-200 DECODER PER PLAN

LEGEND:

1. EARTH GROUND TO BE A MINIMUM OF 8' AWAY FROM DECODER AND AT A RIGHT ANGLE TO THE TWO WIRE PATH

MANUFACTURER NOTES:

2. DO NOT SCALE DRAWING.

1. INSTALLATION TO BE COMPLETED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS.

NOTES:

13 VALVE BOX

OUTGOING JACKETED IDWIRE12

11 WIRE CONNECTION

10 STATION WIRE

9 VALVE SOLENOID WIRE

VALVE SOLENOID WIRE SPLICE 8

7 IDWIRE PATH SPLICE

IN-LINE PRESSURE REDUCING VALVE W/ UNIVERSAL DECODER STAKE KIT

NTS

COORDINATE LOCATION WITH OWNER.

AMP OUTLET.

STAINLESS STEEL. PROVIDE 120V 1PH 20

WEATHERTIGHT, LOCKABLE ENCLOSURE,

INSTALL ON OUTSIDE WALL. PROVIDE

CONTROLLER LOCATION. CONTRACTOR TO

R1

GPM

15.5 1.5"

S4

GPM

18.6 1.5"

DRIPLINE OF TREES.

EXCAVATION ONLY WITHIN THE

AND MINIMIZE PIPE RUNS. HAND

TREES WHEREVER POSSIBLE

OUTSIDE OF DRIPLINE OF

ROUTE IRRIGATION PIPING

SR 60 / GULF TO BAY BOULEVARD

B A Y S

H O

R E B

LV

D

TO COURTNEY CAMPBELL PEDESTRIAN OVERPASS

B4

GPM

1.0"

PAVEMENT AS SHOWN, TYP.

SLEEVE UNDER

PAVEMENT AS SHOWN, TYP.

SLEEVE UNDER

SHOWN, TYP.

PAVEMENT AS

SLEEVE UNDER

PAVEMENT AS SHOWN, TYP.

SLEEVE UNDER

PAVEMENT AS SHOWN, TYP.

SLEEVE UNDER

PAVEMENT AS SHOWN, TYP.

SLEEVE UNDER

PAVEMENT AS SHOWN, TYP.

SLEEVE UNDER

PAVEMENT AS SHOWN, TYP.

SLEEVE UNDER

EXISTING TREES

EX. TREE

EX. TREE

EX. TREE

CANOPY (DRIPLINE)

EXISTING TREE

EX. TREE

LOOP MAIN

SCH 40

2-1/2" PVC

LOOP MAIN

SCH 40

2-1/2" PVC

LOOP MAIN

SCH 40

2-1/2" PVC

LOOP MAIN

2-1/2" PVC SCH 40

LOCATION, COORDINATE WITH OWNER.

IDENTIFY RECLAIMED WATER SOURCE

SHUTOFF VALVE

1-1/2" SYSTEM

FOR GRAPHIC CLARITY

PIPE SHOWN OUTSIDE PLANTBED

GRAPHIC CLARITY

NOT SHOWN FOR

ZONES

PIPES FOR BUBBLER

CC

CC

CC

CC

CC

CC

CC

CC

CC

CC

CC

CC

CC CC

CC

CC

CC

BB

BBBBBBBB

BB

BB BB

BB

BB

BB

BB

BB

BB

BB

SHRUBS

SHRUBS

S5

GPM

16.1 1.5"

B2

GPM

1.5"

SHRUBS

S6

GPM

7.2 1.0"

S8

GPM

1.0"

TURF

TURF

S7

GPM

6.8 1.0"

B1

GPM

15.5 1.5"

TURF

ROTOR

R3

GPM

18.5 1.5"

S2

GPM

21.2 1.5"

SHRUBS

B5

GPM

1.5"

R2

GPM

15.5 1.5"

S1

GPM

1.5"

R4

GPM

21.7 1.5"

R5

GPM

18.6 1.5"

S3

GPM

1.0"

SHRUBS

B3

GPM

1.0"

NORTH

20 400

IRRIGATION PLAN

SHOWING RECLAIMED WATER.

MAINLINE SHALL HAVE INDICATOR TAPE IN TRENCH

BE PURPLE AND TAGGED.

VALVES, VALVE BOXES AND APPURTENANCES SHALL

RECLAIMED WATER IS THE SOURCE TO ALL PIPING.

NOTE:

"RAIN SWITCH & BYPASS SWITCH" FOR AUTOMATIC RAIN SHUTOFF,

INSTALL PER MANUFACTURER'S RECOMMENDATIONS. GENERAL

CONTRACTOR TO PROVIDE 117 V. AC POWER SUPPLY DISCONNECT TO

CONTROLLER LOCATION. COORDINATE LOCATION WITH OWNER'S

TO BE MOUNTED ON WALL OUTSIDE.

NOZZLE SELECTION CHART AS A GUIDE FOR PROPER NOZZLE PATTERN

PER FIELD REQUIREMENTS. NOZZLE SELECTIONS SHOWN ON PLANS ARE

TO BE USED AS A GUIDE ONLY. INSTALL BODY TYPES AS FOLLOWS:

6" POP-UP FOR TURF AREAS. (6P)

12" POP-UP FOR SHRUB & GROUND COVER BEDS ADJACENT TO WALKS.

RISERS WITH NOZZLES FOR SHRUB & GROUNDCOVER BEDS ADJACENT TO

BUILDINGS.

AND ADJACENT TO CURBS AND SIDEWALKS (12P)

IRRIGATION LEGEND

PROVIDE A HUNTER SOLAR SYNCH CONTROLLER AND A HUNTER WIRELESS

STAINLESS STEEL WALL MOUNT CABINET.

CONTROLLER: ACC2 DECODER CONTROLLER, 75 STATIONS BASE MODEL,

ROTORS: HUNTER PGP ULTRA SERIES. REFER TO

INSTALL WITH FLEX PIPE -SEE DETAILS

TURF ROTORS - HUNTER PGP

INDICATES PVC SCH 40 SLEEVE SIZED TWO PIPE SIZES LARGER

(INSIDE DIAMETER) THAN LATERAL LINE "WET PIPE" INDICATED ON

PLAN.

SCH 40 PVC MAINLINE-2" (LOCATE IN PLANTING AREAS NOT UNDER

PAVEMENT EXCEPT IN SLEEVES, AS SHOWN ON PLAN)

INDICATES PVC LATERAL LINE:

NOTE: ALL MAINLINE AND LATERAL LINES SHALL BE INSTALLED IN

PLANTING AREAS AND SLEEVED UNDER PAVING AREAS AND ARE ONLY

DIAGRAMATICALLY LOCATED ON THIS PLAN.

NOTE:

WHEN DIGGING NEAR EXISTING TREES, FIELD ADJUST HEADS, LINES AND

TRENCHES TO AVOID CUTTING ROOTS 2" AND GREATER IN DIAMETER.

FEET-PER-SECOND OF FLOW RATE. PSI AND GPM AT ALL HEADS SHALL

MATCH MANUFACTURERS DESIGN SPECIFICATIONS AS CALLED FOR ON PLANS

DETERMINED BY HEAD TYPE ON CHART.

NOTE: IRRIGATION CONTRACTOR SHALL SIZE PIPE SIZES NOT TO EXCEED 5 FPS

VALVE SIZE

GPM

ALL PIPING SHALL BE PVC SCH 40 - INSTALLED WITH PURPLE PRIMER

FOR CLARITY

INSTALL AT PERIMETER OF ROOTBALL. PIPING NOT SHOWN ON PLAN

; 0.5 GPMRAINBIRD RWS-B-C-1402TREE BUBBLERS:

ZONE #

ARE ADEQUATE FOR SYSTEM. CONTACT LANDSCAPE ARCHITECT IF

ORDINANCE. IRRIGATION CONTRACTOR TO VERIFY THAT PSI AND GPM OF METER

THERE IS A DISCREPANCY BETWEEN THE PLAN AND SYSTEM AS INSTALLED

IRRIGATION CONTRACTOR TO PROVIDE

P.O.C.: LANDSCAPE CONTRACTOR TO PROVIDE 1" RECLAIMED WATER METER

W/ 1-1/2" BALL VALVE AS REQUIRED BY LOCAL

ENTIRE SYSTEM DOWNSTREAM OF METER, INCLUDING A BALL VALVE SHUT-OFF.

TURF ROT

AA

BB

CC

DD

EE

FF

GG

HH

II

JJ

KK

NOZZLE SELECTION CHART FOR SPRINKLERS

SHRUB SPRAYS & BUBBLER HEADS

SYM BOL PSI GPM RADIUS PATTERN

30 4 15' FULL

30 3 15' THREE QUARTER

30 2.6 15' TW O THIRD

30 2 15' HALF

30 1.4 15' ONE THIRD

30 1 15' QUARTER

30 0.6 4' x 15' END STRIP

30 1.2 4' x 30' CENTER STRIP

30 1.2 9' x 18' SIDE STRIP

30 1.45 4' x 30' SIDE STRIP

30 2.1 12' FULL

30 1.5 12' THREE QUARTER

30 1.3 12' TW O THIRD

30 1.1 12' HALF

30 0.9 12' ONE THIRD

30 0.8 12' QUARTER

30 ' FULL STREAM BUBBLER

30 0.5 HALF STREAM BUBBLER

30 0.25 QTR. STREAM BUBBLER

TURF ROTORS

PGP-06-CV-R 40 3.1 32' ADJ. FULL

40 3.9 34' ADJ. FULL

40 5 37' ADJ. FULL

I-25-ADS-4 40 3.8 40' ADJ. FULL

1-25-ADS-7 40 6.6 45' ADJ. FULL

1-25-ADS-8 40 7.7 47' ADJ. FULL

I-40-ADS-40 50 8 46' ADJ. FULL

I-40-ADS-41 50 10.2 52' ADJ. FULL

1-40-ADS-43 50 14.2 58' ADJ. FULL LL

15F

15A

15A

15H

15A

15Q

SPEC#/NOZZLE

15EST

15CST

15SST

9SST

12F

12A

12H

12A

12Q

12A

MSBN25Q

MSBN50H

MSBN10F 1 1

'1

'1

PGP-06-CV-R

PGP-06-CV-R

SPRINKLERS: RAINBIRD RD 1800 PRS SERIES

B R S

= Tree Bubblers

= Rotors

= Spray

PGP-06-CV-R 40 0.9 17' ADJ. FULL

40 1.3 24' ADJ. FULL

40 1.5 30' ADJ. FULL

PGP-06-CV-R

PGP-06-CV-R

IRRIGATION NOTES

prior to final inspection and acceptance.

modifications and/or substitutions, must be submitted to the City Project Manager

Irrigation As-Built drawings, which accurately and clearly identify any and all 9.

prior to backfilling trenches or installation of mulch.

The irrigation system must be inspected and accepted by the City Project Manager 8.

Project Manager prior to commencement of work.

Irrigation Shop Drawings must be prepared and submitted for approval by the City 7.

City Project Manager.

Recreation Department's Irrigation System Design guidelines, available from the

The proposed irrigation system must be designed in compliance with the Parks & 6.

City Project Manager.

Recreation Department's most current approved products list, available from the

The proposed irrigation system must use irrigation components from the Parks & 5.

control timer with the City Project Manager.

Contractor must coordinate the placement and power supply for the irrigation 4.

Project Manager.

Contractor must coordinate location and size of irrigation water meter with the City 3.

requirements (ie., Back Flow Prevention, Automatic Rain Shutoff Device, etc...)

The proposed irrigation system must meet or exceed all applicable City code 2.

installed by contractor.

An irrigation system, that provides 100% coverage of all plantings and sod, will be 1.

GRAPHIC CLARITY

BUBBLER PIPING NOT INDICATED IN ALL INSTANCES FOR

SEPARATE ZONES.

ZONES. SYSTEM IS DESIGNED FOR BUBBLERS ON

DO NOT INCLUDE BUBBLERS ON ROTOR OR SPRAY

TREE BUBBLER WILL BE INSTALLED ON SEPARATE ZONES.

1.

CONTAINER SIZE BUBBLERS

BUBBLERS. BUBBLER SIZES INDICATED ON PLANS

FOLLOWING CHART TO DETERMINE THE NUMBER OF

LARGER TREES REQUIRE MULTIPLE BUBBLERS USE THE

TREE BUBBLER NOTES:

PALM 2

B&B 4

60 GAL 4

45 GAL 3

25 GAL 2

15 GAL 1

2.

3.

STREET WITH CURB STREET WITHOUT CURB

PVC sleeves.

above existing grade at each end of

2" PVC marking columns to be set 12"

NOTE:

column "capped"

Min. 2" PVC marking

(Typical Each End)

Capped or Tapped

End of Sleeve to be column "capped"

Min. 2" PVC marking

DUE TO RECLAIMED WATER.

BE MOUNTED FLUSH WITH FINAL GRADE. USE PURPLE VALVES

SIDEWALK EDGES OR BUILDING EDGES. VALVE BOXES SHALL

VALVE FOR DRAINAGE. LOCATE VALVES MIN 2' FROM ALL

AND INSTALL ONE CUBIC FOOT OF PEA GRAVEL AT BASE OF

BOXES WITH MATCHING COVERS. PLACE VALVE BOX ON BRICKS

ALL VALVES SHALL BE INSTALLED IN AMETEK VP-10 VALVE

MINIMIZE MISTING. INCLUDE ICD DECODER ON STAKE.

WITH ACU-SYNCH PRESSURE REGULATOR ADJUSTED TO 1/2"

REMOTE CONTROL VALVES: IRRITROL 200B SERIES 3/4", 1" OR 1-

design group international, inc.

TERRA

TECTONICS

727-441-4504 ph.

Fl. Reg. Lic. # 254

LANDSCAPE ARCHITECTS

STATE ROAD 60 & BAYSHORE BLVD

NO. ISSUE / REVISION BY DATE

T H

IS

D

O C

U M

E N

T C

O N

T A

IN

S

C O

P Y

R

IG

H T

E D

M A

T E

R

IA

L A

N D

T R

A D

E S

E C

R E

T I

N F

O R

M A

T

IO

N B

E L

O N

G

IN

G E

X C

L U

S

IV

E L

Y T

O W

IL

L

IA

M

S O

N D

A C

A R

A S

S O

C

IA

T E

S

IN

C

A N

Y U

N A

U T

H O

R

IZ

E D

U S

E

D

IS

C L

O S

U R

E

D

IS

S E

M

IN

A T

IO

N

O R

D U

P L

IC

A

T

IO

N O

F A

N Y

O F

T H

E I

N F

O R

M A

T

IO

N C

O N

T A

IN

E

D H

E R

E

IN

M A

Y R

E S

U L

T I

N L

IA

B

IL

IT

Y U

N D

P L

IC

A

B L

E L

A W

S

CLEARWATER SR60 TRAILHEAD PARK

BK

BK

RECORD DRAWINGS

SURVEYED BY:

REVIEWED BY:

APPROVED BY:

DRAWN BY:

PROJECT ENGINEER DATE

DATE

CITY OF CLEARWATER, FLORIDA

PARKS AND RECREATION

100 S. MYRTLE AVE.

CLEARWATER, FL 33756

INVESTIGATE BEFORE YOU EXCAVATE

CALL 811

ONE CALL

OF FLORIDA

www.callsunshine.com

(800) 432-4770

MIN. 48 HOURS

BEFORE YOU EXCAVATE

SUNSHINE STATE

DWG NAME: FIELD BOOK: SURVEYED BY: SCALE:

CONTRACT NO.: DATE DRAWN: DRAWN BY:

JOB NO.: DESIGNED BY: CHECKED BY:

APPROVED BY

DATE

100% BID PLANS

SHEET NO.:

2509-01

25000613

DESIGN DEVELOPMENT 10/31/2025

2/18/2026CONSTRUCTION DOCUMENTS

SEAL

LI

CENSE

FLORIDA

STATE OF

No. 2035

FL REG.

R E G

LANDSCAPE A

RCH

IT

E C T

BIRGIT KIBELKA FL LA2035

PERMIT SET 3/17/2026

Planting Specifications (1/2)

REFER TO SHEET

L3

PLANTING SPECIFICATIONS (1/2)

GENERAL LANDSCAPE NOTES

this project.

The Landscape Contractor will be responsible for the collection, removal, and proper disposal of any and all debris generated during the installation of 22.

Any existing sod areas that are unnecessarily disturbed during the landscape installation shall be resodded to match existing.21.

Existing sod shall be removed as necessary to accommodate new plantings.20.

No contractor identification signs shall be permitted on the project, except for the project information signs.19.

All permits necessary are to be provided by the installing contractor unless otherwise specifically stated in the specifications.18.

Manager with proper installation carried out by Landscape Contractor at no additional cost.

All materials must be as specified on the landscape plan. If materials or labor do not adhere to specifications, they will be rejected by the City Project 17.

the City Project Manager.

All dimensions to be field-checked by the Landscape Contractor prior to landscape material installation. Discrepancies shall be reported immediately to 16.

Manager.

The Landscape Contractor shall guarantee, in writing, plant survivability for a period of twelve (12) months from final acceptance by the City Project 15.

There shall be no additions, deletions or substitutions without the written approval of the City Project Manager.14.

Any and all questions concerning the plan set and/or specifications shall be directed to the City Project Manager at (727) 444-8584.13.

intended changes.

Plant material shall be bid as specified unless unavailable, at which time the City Project Manager will be notified by telephone and in writing of 12.

and the specifications.

The Landscape Contractor shall be responsible for securing all necessary applicable permits and licenses to perform the work set forth in this plan set 11.

completion for failure to report such condition, or for errors on the part of the Landscape Contractor at the time of bidding.

site conditions shall be reported to the City Project Manager in writing at the time of bidding or discovery. No account shall be made after contract

The Landscape Contractor shall be responsible for examining fully both the site and the bid documents. Discrepancies in the documents or the actual 10.

All tree and shrub locations are subject to change. All locations shall be approved by the City Project Manager prior to planting. 9.

expense.

Plants shall meet size, container, and spacing specifications. Any material not meeting specifications shall be removed and replaced at the contractor's 8.

plant key, the plan shall prevail.

The plant material schedule is presented for the convenience of the Landscape Contractor. In the event of a discrepancy between the plan and the 7.

All planting areas shall receive a 3" layer of Mini pine bark nuggets or Hardwood mulch (Coco brown), which is to be watered-in after installation.6.

capacity. It shall also be free of all extraneous debris, such as roots, stones, weeds, etc.

sawdust, leaf mold and top soil. It shall provide a good pliable and thoroughly mixed medium with adequate aeration, drainage and water-holding

The planting soil shall be the approximate proportions as follows: 50% sand and 50% organic material consisting of native peat, well-decomposed 5.

All plants shall be fertilized with Agriform 20-10-5 tablets as per the manufacturers specifications in conjunction with note # 5. 4.

All planting shall be done in accordance with the Florida Nurserymen's and Grower's Associations approved practices.3.

Consumer Services, Division of Plant Industry "Grades and Standards for Nursery Plants", 7th Edition, 1998 as revised from time to time.

All recommended trees and plant materials will be graded as Nursery Grade No. 1 or better as outlined by the Florida Department of Agriculture and 2.

The Landscape Contractor shall grade planting beds, as required, to provide positive drainage and promote optimum plant growth.1.

FERTILIZATION NOTES

between the middle and bottom of the root mass.

Tablets shall be placed uniformly around the root mass at a depth that is tablets at time of installation and prior to completion of pit backfilling.

All trees and shrubs shall be fertilized with "Agriform" 20-15-5 planting

SHRUBS AND TREES

APPLICATION RATE:

Palms: 7 - 21 Gram Tablets

Trees: 3 - 21 Gram Tablets Each 1/2" of Caliper

7 Gallon Can: 4 - 21 Gram Tablets

5 Gallon Can: 3 - 21 Gram Tablets

3 Gallon Can: 2 - 21 Gram Tablets

1 Gallon Can: 1 - 21 Gram Tablets

GROUNDCOVER AREAS

release fertilizer as per manufacturer's specifications.

All groundcover areas shall receive fertilization with "Ozmocote" time design group international, inc.

TERRA

TECTONICS

727-441-4504 ph.

Fl. Reg. Lic. # 254

LANDSCAPE ARCHITECTS

STATE ROAD 60 & BAYSHORE BLVD

NO. ISSUE / REVISION BY DATE

T H

IS

D

O C

U M

E N

T C

O N

T A

IN

S

C O

P Y

R

IG

H T

E D

M A

T E

R

IA

L A

N D

T R

A D

E S

E C

R E

T I

N F

O R

M A

T

IO

N B

E L

O N

G

IN

G E

X C

L U

S

IV

E L

Y T

O W

IL

L

IA

M

S O

N D

A C

A R

A S

S O

C

IA

T E

S

IN

C

A N

Y U

N A

U T

H O

R

IZ

E D

U S

E

D

IS

C L

O S

U R

E

D

IS

S E

M

IN

A T

IO

N

O R

D U

P L

IC

A

T

IO

N O

F A

N Y

O F

T H

E I

N F

O R

M A

T

IO

N C

O N

T A

IN

E

D H

E R

E

IN

M A

Y R

E S

U L

T I

N L

IA

B

IL

IT

Y U

N D

P L

IC

A

B L

E L

A W

S

CLEARWATER SR60 TRAILHEAD PARK

BK

BK

RECORD DRAWINGS

SURVEYED BY:

REVIEWED BY:

APPROVED BY:

DRAWN BY:

PROJECT ENGINEER DATE

DATE

CITY OF CLEARWATER, FLORIDA

PARKS AND RECREATION

100 S. MYRTLE AVE.

CLEARWATER, FL 33756

INVESTIGATE BEFORE YOU EXCAVATE

CALL 811

ONE CALL

OF FLORIDA

www.callsunshine.com

(800) 432-4770

MIN. 48 HOURS

BEFORE YOU EXCAVATE

SUNSHINE STATE

DWG NAME: FIELD BOOK: SURVEYED BY: SCALE:

CONTRACT NO.: DATE DRAWN: DRAWN BY:

JOB NO.: DESIGNED BY: CHECKED BY:

APPROVED BY

DATE

100% BID PLANS

SHEET NO.:

2509-01

25000613

DESIGN DEVELOPMENT 10/31/2025

2/18/2026CONSTRUCTION DOCUMENTS

SEAL

LI

CENSE

FLORIDA

STATE OF

No. 2035

FL REG.

R E G

LANDSCAPE A

RCH

IT

E C T

BIRGIT KIBELKA FL LA2035

PERMIT SET 3/17/2026

ROOT CORRECTION DETAIL - B&B

NOT TO SCALE

ball. Remove excess soil and roots

Tree planted too deeply in root in black) extending from root ball.

Remove structural roots (4 shown growing over structural roots.

black. Remove root (white)

Four structural roots shown in

(white) root wrapping root collar.

in black. Remove structural

Five structural (large) roots shown before they make an abrupt turn.

Remove structural roots (white) growing

Six structural roots shown in black.

Cut here.

and roots over the root collar.

2- First step 1, then step 2. Adjust hole depth to allow for the removal of excess soil

Notes:

Remove excess soil and roots to

Tree planted too deeply in root ball.

just before they make an abrupt turn.

Remove structural roots (white) growing

Seven structural roots shown in black.

Step 1 - Remove soil and roots over the root collar.

Step 2 - Remove defects.

less) at the periphery of the root ball are not or " 4

Remove structural roots (4 shown in black)

Cut here.

Cut here.

Cut here.Cut here.

Cut here.

ball surface.

New root excess roots.

Remove excess soil.

Remove Root collar.

Root collar.

ROOT CORRECTION DETAIL - CONTAINER

NOT TO SCALE

Cut here.

Remove excess substrate and roots

Tree planted too deeply in root ball.

made tangent (parallel) to the trunk.

abrupt turn. Pruning cut should be

Cut structural root just before it makes

(parallel) to the trunk (two cuts shown).

Cut structural roots just before they structural roots.

Remove root (white) growing over

Four structural roots shown in black.

(white) wrapping root collar.

in black. Remove structural root

Five structural (large) roots shown before they make an abrupt turn.

Remove roots (white) growing over

Six structural roots shown in black.

4- Small roots (1/4" or less) on the periphery of the root ball are common with container

Notes:

Remove excess substrate and roots to

Tree planted too deeply in root ball.

just before they make an abrupt turn.

Remove structural roots (white) growing

Seven structural roots shown in black.

Step 1 - Remove substrate over root collar.

Step 2 - Remove defects.

Cut here.

Cut here.

Cut here.

Cut here.

Cut here.

Cut here.

roots.

Remove excess substrate/soil.

Remove excess

Root collar.

ball surface.

New root

Root collar.

Cut here.

periphery.

Root ball

A B

Planting Specifications (2/2)

L4

JT JT

PLANTING SPECIFICATIONS (2/2)

AND NOTES, THE CITY DETAILS AND NOTES SHALL BE FOLLOWED.

WHERE DETAILS AND NOTES DIFFER FROM CITY OF CLEARWATER LANDSCAPE DETAILS

Clearwater SR60 Trailhead Park_CDs
Clearwater SR60 Trailhead Park_CDs
Clearwater SR60 Trailhead Park_CDs
Clearwater SR60 Trailhead Park_CDs
2026-07-21T12:19:06-0400
Birgit Kibelka

File details come from the government source that posted it. Updated .