This is a bid set of construction documents for the State Road (SR) 60 Trailhead Park project prepared for the City of Clearwater, Florida Parks and Recreation Department. The project scope includes creating a new trailhead to support the Courtney Campbell Causeway pedestrian overpass and adjoining trail system, with site improvements comprising landscaping, irrigation systems, concrete pads and sidewalks, site furnishings (benches, picnic tables, Adirondak chairs, waste receptacles, drinking fountain, bike racks, and bike repair station), and regulatory/informational signage. The contract period is three months or 90 consecutive calendar days from the Notice to Proceed. The construction documents include detailed planting plans, irrigation system specifications, and planting specifications prepared by Design Group International, Inc. and Terra Tectonics, with landscape architect Birgit Kibelka (FL LA2035) as the responsible professional. The bid plans are dated 100% Construction Documents as of February 18, 2026, with permit set dated March 17, 2026, under contract number 25000613.
The irrigation system design utilizes reclaimed water as the primary source and incorporates Hunter and Rainbird equipment with solar sync controllers, bubbler systems for trees, rotors for turf areas, and spray heads for shrub and groundcover beds. All landscaping must comply with Florida Department of Agriculture Consumer Services Division of Plant Industry standards and Florida Nurserymen's and Grower's Associations approved practices, with all plant materials graded as Nursery Grade No. 1 or better. The landscape contractor is responsible for providing a written guarantee of plant survivability for twelve months from final acceptance by the City Project Manager. All irrigation shop drawings require approval by the City Project Manager prior to commencement of work, with the system subject to inspection and acceptance before backfilling or mulch installation. The contractor must provide one fixed project sign as described in the contract documents and coordinate all material installations with the City Project Manager at (727) 444-8584.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
design group international, inc.
TERRA
TECTONICS
727-441-4504 ph.
Fl. Reg. Lic. # 254
Clearwater, Fl 33765
1188 Kapp Drive
URBAN DESIGNERS
LAND PLANNERS
LANDSCAPE ARCHITECTS
STATE ROAD 60 & BAYSHORE BLVD
NO. ISSUE / REVISION BY DATE
T H
IS
D
O C
U M
E N
T C
O N
T A
IN
S
C O
P Y
R
IG
H T
E D
M A
T E
R
IA
L A
N D
T R
A D
E S
E C
R E
T I
N F
O R
M A
T
IO
N B
E L
O N
G
IN
G E
X C
L U
S
IV
E L
Y T
O W
IL
L
IA
M
S O
N D
A C
A R
A S
S O
C
IA
T E
S
IN
C
A N
Y U
N A
U T
H O
R
IZ
E D
U S
E
D
IS
C L
O S
U R
E
D
IS
S E
M
IN
A T
IO
N
O R
D U
P L
IC
A
T
IO
N O
F A
N Y
O F
T H
E I
N F
O R
M A
T
IO
N C
O N
T A
IN
E
D H
E R
E
IN
M A
Y R
E S
U L
T I
N L
IA
B
IL
IT
Y U
N D
E R
A P
P L
IC
A
B L
E L
A W
S
CLEARWATER SR60 TRAILHEAD PARK
BK
BK
RECORD DRAWINGS
SURVEYED BY:
REVIEWED BY:
APPROVED BY:
DRAWN BY:
PROJECT ENGINEER DATE
DATE
CITY OF CLEARWATER, FLORIDA
PARKS AND RECREATION
100 S. MYRTLE AVE.
CLEARWATER, FL 33756
INVESTIGATE BEFORE YOU EXCAVATE
CALL 811
ONE CALL
OF FLORIDA
www.callsunshine.com
(800) 432-4770
MIN. 48 HOURS
BEFORE YOU EXCAVATE
SUNSHINE STATE
DWG NAME: FIELD BOOK: SURVEYED BY: SCALE:
CONTRACT NO.: DATE DRAWN: DRAWN BY:
JOB NO.: DESIGNED BY: CHECKED BY:
APPROVED BY
DATE
100% BID PLANS
SHEET NO.:
2509-01
25000613
DESIGN DEVELOPMENT 10/31/2025
2/18/2026CONSTRUCTION DOCUMENTS
SEAL
LI
CENSE
FLORIDA
STATE OF
No. 2035
FL REG.
R E G
LANDSCAPE A
RCH
IT
E C T
BIRGIT KIBELKA FL LA2035
PERMIT SET 3/17/2026
25-1039
1" = 20'
L1
Planting Plan
DETAIL TREE BARRICADE NTS
EX LAWN
MC
SR 60 / GULF TO BAY BOULEVARD
SOD
SOD
SOD
SOD
SOD
SOD
SOD
SOD
WB
Triangle
Sight Visibility
Triangle
Sight Visibility
CE
MULCH
B A Y S
H O
R E B
O U L E
V A R
D
MULCH
MULCH
SOD
SOD
EX. LAWN
EX. LAWN
EX. LAWN
EX. LAWN
EX. LAWN
MF
CES
JI
LI
A
R T
N
AI
R T
S E
D E
P E
R O
H S
Y A
B
TO COURTNEY CAMPBELL PEDESTRIAN OVERPASS
HP
AG
130 SF
AG
705 SF
EXISTING LIVE OAK
AG
96 SF
MF
AG
125 SF
CM
WB
ZP
AG
260 SF
CM
AG
55 SF
CM
PN
10 HP
JI
CES
HP
JI
HP
WB
CM
ZP
ZP
CES
ZP
MC
CES
SAND LIVE OAKS
EXISTING GROVE OF
AG
85 SF
CM
EXISTING SIGN
REMOVED
TREE TO BE
SIGN
MF
AG
29 SF
21"
QL
23"
QL
27"
QG
16"
PE
37"
QV
30"
QG
36"
QG
33"
QG
20"
QG
20"
QG
34"
QG
30"
QG
SR 60 / GULF TO BAY BOULEVARD
B A Y S
H O
R E B
O U L E
V A R
D
LI
A
R T
N
AI
R T
S E
D E
P E
R O
H S
Y A
B
TO COURTNEY CAMPBELL PEDESTRIAN OVERPASS
TREE BARRICADE
TREE BARRICADE
TREE BARRICADE
TREE BARRICADES
NORTH
20 400
PLANTING PLAN
40 800 per the detail.
any construction and on the plan prior to in the locations shown
Install tree barricades
G V design group international, inc.
TERRA
TECTONICS
727-441-4504 ph.
Fl. Reg. Lic. # 254
LANDSCAPE ARCHITECTS
STATE ROAD 60 & BAYSHORE BLVD
NO. ISSUE / REVISION BY DATE
T H
IS
D
O C
U M
E N
T C
O N
T A
IN
S
C O
P Y
R
IG
H T
E D
M A
T E
R
IA
L A
N D
T R
A D
E S
E C
R E
T I
N F
O R
M A
T
IO
N B
E L
O N
G
IN
G E
X C
L U
S
IV
E L
Y T
O W
IL
L
IA
M
S O
N D
A C
A R
A S
S O
C
IA
T E
S
IN
C
A N
Y U
N A
U T
H O
R
IZ
E D
U S
E
D
IS
C L
O S
U R
E
D
IS
S E
M
IN
A T
IO
N
O R
D U
P L
IC
A
T
IO
N O
F A
N Y
O F
T H
E I
N F
O R
M A
T
IO
N C
O N
T A
IN
E
D H
E R
E
IN
M A
Y R
E S
U L
T I
N L
IA
B
IL
IT
Y U
N D
P L
IC
A
B L
E L
A W
S
CLEARWATER SR60 TRAILHEAD PARK
BK
BK
RECORD DRAWINGS
SURVEYED BY:
REVIEWED BY:
APPROVED BY:
DRAWN BY:
PROJECT ENGINEER DATE
DATE
CITY OF CLEARWATER, FLORIDA
PARKS AND RECREATION
100 S. MYRTLE AVE.
CLEARWATER, FL 33756
INVESTIGATE BEFORE YOU EXCAVATE
CALL 811
ONE CALL
OF FLORIDA
www.callsunshine.com
(800) 432-4770
MIN. 48 HOURS
BEFORE YOU EXCAVATE
SUNSHINE STATE
DWG NAME: FIELD BOOK: SURVEYED BY: SCALE:
CONTRACT NO.: DATE DRAWN: DRAWN BY:
JOB NO.: DESIGNED BY: CHECKED BY:
APPROVED BY
DATE
100% BID PLANS
SHEET NO.:
2509-01
25000613
DESIGN DEVELOPMENT 10/31/2025
2/18/2026CONSTRUCTION DOCUMENTS
SEAL
LI
CENSE
FLORIDA
STATE OF
No. 2035
FL REG.
R E G
LANDSCAPE A
RCH
IT
E C T
BIRGIT KIBELKA FL LA2035
PERMIT SET 3/17/2026
25-1039
1" = 20'
L2
Irrigation Plan
MODEL 1404 (1 GPM)
RAINBIRD 1400 SERIES BUBBLER
1/2" FLEX PIPE
LATERAL TEE
FINISH GRADE
LATERAL PIPE
RAINBIRD 1400 SERIES BUBBLER
NTS
FINISH GRADE
4"
SPRAY HEAD ON POLY PIPE DETAIL
NTS
PVC TEE
POLY ELL
(LENGTH AS REQUIRED)
POLY PIPE
POLY ELL
1/2" STREET ELL
6" POP-UP SPRAY HEAD
PVC LATERAL LINE
PAVEMENT
SOLAR SYNC SYSTEM - WEATHER SENSOR
NTS
UP TO 200' AWAY
OR AS SPECIFIED
CONTROLLER
HUNTER PRO-C
PATTERN
AND OUT OF SPRINKLER SPRAY
SUNLIGHT, OPEN TO RAINFALL
THAT MAXIMIZES DIRECT
MOUNT. MOUNT IN LOCATION
SUITABLE POST, POLE, GUTTER
MODEL: SOLAR SYNC SENSOR
TO A POINT 12" BELOW GRADE
SENSOR TO CONTROLLER OR
CONDUIT FROM SOLAR SYNC
WITH THE PCC CONTROLLER.
INTERNALLY WHEN PAIRED
MODULE CAN BE MOUNTED
FROM CONTROLLER.
MOUNT LESS THAN 6' AWAY
MODEL SOLAR SYNC MODULE
COMMUNICATION WIRE
SOLAR SYNC
CONTROL WIRE AND
CONDUIT FOR VALVE
POWER SOURCE
CONTROLLER
DISTANCE, 200 FEET
SENSOR. MAXIMUM TOTAL WIRE
REQUIREMENTS), FROM MODULE TO
TO MEET INSTALLATION CODE
COMMUNICATION WIRE, 18-2(WIRE TYPE
TYPICAL IRRIGATION METER CONNECTION DETAIL
NTS
TYPICAL IRRIGATION SLEEVE UNDER STREET
6 STATION WIRE
TO GROUNDING DEVICE
COPPER GROUND WIRE FROM DECODER 5
4 RED AND BLUE WIRES
PER PLANINCOMING HUNTER JACKET 3
2 DECRSTAKE-10 DRIVEN INTO VALVE BOX
1 ICD-200 DECODER PER PLAN
LEGEND:
1. EARTH GROUND TO BE A MINIMUM OF 8' AWAY FROM DECODER AND AT A RIGHT ANGLE TO THE TWO WIRE PATH
MANUFACTURER NOTES:
2. DO NOT SCALE DRAWING.
1. INSTALLATION TO BE COMPLETED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS.
NOTES:
13 VALVE BOX
OUTGOING JACKETED IDWIRE12
11 WIRE CONNECTION
10 STATION WIRE
9 VALVE SOLENOID WIRE
VALVE SOLENOID WIRE SPLICE 8
7 IDWIRE PATH SPLICE
IN-LINE PRESSURE REDUCING VALVE W/ UNIVERSAL DECODER STAKE KIT
NTS
COORDINATE LOCATION WITH OWNER.
AMP OUTLET.
STAINLESS STEEL. PROVIDE 120V 1PH 20
WEATHERTIGHT, LOCKABLE ENCLOSURE,
INSTALL ON OUTSIDE WALL. PROVIDE
CONTROLLER LOCATION. CONTRACTOR TO
R1
GPM
15.5 1.5"
S4
GPM
18.6 1.5"
DRIPLINE OF TREES.
EXCAVATION ONLY WITHIN THE
AND MINIMIZE PIPE RUNS. HAND
TREES WHEREVER POSSIBLE
OUTSIDE OF DRIPLINE OF
ROUTE IRRIGATION PIPING
SR 60 / GULF TO BAY BOULEVARD
B A Y S
H O
R E B
LV
D
TO COURTNEY CAMPBELL PEDESTRIAN OVERPASS
B4
GPM
1.0"
PAVEMENT AS SHOWN, TYP.
SLEEVE UNDER
PAVEMENT AS SHOWN, TYP.
SLEEVE UNDER
SHOWN, TYP.
PAVEMENT AS
SLEEVE UNDER
PAVEMENT AS SHOWN, TYP.
SLEEVE UNDER
PAVEMENT AS SHOWN, TYP.
SLEEVE UNDER
PAVEMENT AS SHOWN, TYP.
SLEEVE UNDER
PAVEMENT AS SHOWN, TYP.
SLEEVE UNDER
PAVEMENT AS SHOWN, TYP.
SLEEVE UNDER
EXISTING TREES
EX. TREE
EX. TREE
EX. TREE
CANOPY (DRIPLINE)
EXISTING TREE
EX. TREE
LOOP MAIN
SCH 40
2-1/2" PVC
LOOP MAIN
SCH 40
2-1/2" PVC
LOOP MAIN
SCH 40
2-1/2" PVC
LOOP MAIN
2-1/2" PVC SCH 40
LOCATION, COORDINATE WITH OWNER.
IDENTIFY RECLAIMED WATER SOURCE
SHUTOFF VALVE
1-1/2" SYSTEM
FOR GRAPHIC CLARITY
PIPE SHOWN OUTSIDE PLANTBED
GRAPHIC CLARITY
NOT SHOWN FOR
ZONES
PIPES FOR BUBBLER
CC
CC
CC
CC
CC
CC
CC
CC
CC
CC
CC
CC
CC CC
CC
CC
CC
BB
BBBBBBBB
BB
BB BB
BB
BB
BB
BB
BB
BB
BB
SHRUBS
SHRUBS
S5
GPM
16.1 1.5"
B2
GPM
1.5"
SHRUBS
S6
GPM
7.2 1.0"
S8
GPM
1.0"
TURF
TURF
S7
GPM
6.8 1.0"
B1
GPM
15.5 1.5"
TURF
ROTOR
R3
GPM
18.5 1.5"
S2
GPM
21.2 1.5"
SHRUBS
B5
GPM
1.5"
R2
GPM
15.5 1.5"
S1
GPM
1.5"
R4
GPM
21.7 1.5"
R5
GPM
18.6 1.5"
S3
GPM
1.0"
SHRUBS
B3
GPM
1.0"
NORTH
20 400
IRRIGATION PLAN
SHOWING RECLAIMED WATER.
MAINLINE SHALL HAVE INDICATOR TAPE IN TRENCH
BE PURPLE AND TAGGED.
VALVES, VALVE BOXES AND APPURTENANCES SHALL
RECLAIMED WATER IS THE SOURCE TO ALL PIPING.
NOTE:
"RAIN SWITCH & BYPASS SWITCH" FOR AUTOMATIC RAIN SHUTOFF,
INSTALL PER MANUFACTURER'S RECOMMENDATIONS. GENERAL
CONTRACTOR TO PROVIDE 117 V. AC POWER SUPPLY DISCONNECT TO
CONTROLLER LOCATION. COORDINATE LOCATION WITH OWNER'S
TO BE MOUNTED ON WALL OUTSIDE.
NOZZLE SELECTION CHART AS A GUIDE FOR PROPER NOZZLE PATTERN
PER FIELD REQUIREMENTS. NOZZLE SELECTIONS SHOWN ON PLANS ARE
TO BE USED AS A GUIDE ONLY. INSTALL BODY TYPES AS FOLLOWS:
6" POP-UP FOR TURF AREAS. (6P)
12" POP-UP FOR SHRUB & GROUND COVER BEDS ADJACENT TO WALKS.
RISERS WITH NOZZLES FOR SHRUB & GROUNDCOVER BEDS ADJACENT TO
BUILDINGS.
AND ADJACENT TO CURBS AND SIDEWALKS (12P)
IRRIGATION LEGEND
PROVIDE A HUNTER SOLAR SYNCH CONTROLLER AND A HUNTER WIRELESS
STAINLESS STEEL WALL MOUNT CABINET.
CONTROLLER: ACC2 DECODER CONTROLLER, 75 STATIONS BASE MODEL,
ROTORS: HUNTER PGP ULTRA SERIES. REFER TO
INSTALL WITH FLEX PIPE -SEE DETAILS
TURF ROTORS - HUNTER PGP
INDICATES PVC SCH 40 SLEEVE SIZED TWO PIPE SIZES LARGER
(INSIDE DIAMETER) THAN LATERAL LINE "WET PIPE" INDICATED ON
PLAN.
SCH 40 PVC MAINLINE-2" (LOCATE IN PLANTING AREAS NOT UNDER
PAVEMENT EXCEPT IN SLEEVES, AS SHOWN ON PLAN)
INDICATES PVC LATERAL LINE:
NOTE: ALL MAINLINE AND LATERAL LINES SHALL BE INSTALLED IN
PLANTING AREAS AND SLEEVED UNDER PAVING AREAS AND ARE ONLY
DIAGRAMATICALLY LOCATED ON THIS PLAN.
NOTE:
WHEN DIGGING NEAR EXISTING TREES, FIELD ADJUST HEADS, LINES AND
TRENCHES TO AVOID CUTTING ROOTS 2" AND GREATER IN DIAMETER.
FEET-PER-SECOND OF FLOW RATE. PSI AND GPM AT ALL HEADS SHALL
MATCH MANUFACTURERS DESIGN SPECIFICATIONS AS CALLED FOR ON PLANS
DETERMINED BY HEAD TYPE ON CHART.
NOTE: IRRIGATION CONTRACTOR SHALL SIZE PIPE SIZES NOT TO EXCEED 5 FPS
VALVE SIZE
GPM
ALL PIPING SHALL BE PVC SCH 40 - INSTALLED WITH PURPLE PRIMER
FOR CLARITY
INSTALL AT PERIMETER OF ROOTBALL. PIPING NOT SHOWN ON PLAN
; 0.5 GPMRAINBIRD RWS-B-C-1402TREE BUBBLERS:
ZONE #
ARE ADEQUATE FOR SYSTEM. CONTACT LANDSCAPE ARCHITECT IF
ORDINANCE. IRRIGATION CONTRACTOR TO VERIFY THAT PSI AND GPM OF METER
THERE IS A DISCREPANCY BETWEEN THE PLAN AND SYSTEM AS INSTALLED
IRRIGATION CONTRACTOR TO PROVIDE
P.O.C.: LANDSCAPE CONTRACTOR TO PROVIDE 1" RECLAIMED WATER METER
W/ 1-1/2" BALL VALVE AS REQUIRED BY LOCAL
ENTIRE SYSTEM DOWNSTREAM OF METER, INCLUDING A BALL VALVE SHUT-OFF.
TURF ROT
AA
BB
CC
DD
EE
FF
GG
HH
II
JJ
KK
NOZZLE SELECTION CHART FOR SPRINKLERS
SHRUB SPRAYS & BUBBLER HEADS
SYM BOL PSI GPM RADIUS PATTERN
30 4 15' FULL
30 3 15' THREE QUARTER
30 2.6 15' TW O THIRD
30 2 15' HALF
30 1.4 15' ONE THIRD
30 1 15' QUARTER
30 0.6 4' x 15' END STRIP
30 1.2 4' x 30' CENTER STRIP
30 1.2 9' x 18' SIDE STRIP
30 1.45 4' x 30' SIDE STRIP
30 2.1 12' FULL
30 1.5 12' THREE QUARTER
30 1.3 12' TW O THIRD
30 1.1 12' HALF
30 0.9 12' ONE THIRD
30 0.8 12' QUARTER
30 ' FULL STREAM BUBBLER
30 0.5 HALF STREAM BUBBLER
30 0.25 QTR. STREAM BUBBLER
TURF ROTORS
PGP-06-CV-R 40 3.1 32' ADJ. FULL
40 3.9 34' ADJ. FULL
40 5 37' ADJ. FULL
I-25-ADS-4 40 3.8 40' ADJ. FULL
1-25-ADS-7 40 6.6 45' ADJ. FULL
1-25-ADS-8 40 7.7 47' ADJ. FULL
I-40-ADS-40 50 8 46' ADJ. FULL
I-40-ADS-41 50 10.2 52' ADJ. FULL
1-40-ADS-43 50 14.2 58' ADJ. FULL LL
15F
15A
15A
15H
15A
15Q
SPEC#/NOZZLE
15EST
15CST
15SST
9SST
12F
12A
12H
12A
12Q
12A
MSBN25Q
MSBN50H
MSBN10F 1 1
'1
'1
PGP-06-CV-R
PGP-06-CV-R
SPRINKLERS: RAINBIRD RD 1800 PRS SERIES
B R S
= Tree Bubblers
= Rotors
= Spray
PGP-06-CV-R 40 0.9 17' ADJ. FULL
40 1.3 24' ADJ. FULL
40 1.5 30' ADJ. FULL
PGP-06-CV-R
PGP-06-CV-R
IRRIGATION NOTES
prior to final inspection and acceptance.
modifications and/or substitutions, must be submitted to the City Project Manager
Irrigation As-Built drawings, which accurately and clearly identify any and all 9.
prior to backfilling trenches or installation of mulch.
The irrigation system must be inspected and accepted by the City Project Manager 8.
Project Manager prior to commencement of work.
Irrigation Shop Drawings must be prepared and submitted for approval by the City 7.
City Project Manager.
Recreation Department's Irrigation System Design guidelines, available from the
The proposed irrigation system must be designed in compliance with the Parks & 6.
City Project Manager.
Recreation Department's most current approved products list, available from the
The proposed irrigation system must use irrigation components from the Parks & 5.
control timer with the City Project Manager.
Contractor must coordinate the placement and power supply for the irrigation 4.
Project Manager.
Contractor must coordinate location and size of irrigation water meter with the City 3.
requirements (ie., Back Flow Prevention, Automatic Rain Shutoff Device, etc...)
The proposed irrigation system must meet or exceed all applicable City code 2.
installed by contractor.
An irrigation system, that provides 100% coverage of all plantings and sod, will be 1.
GRAPHIC CLARITY
BUBBLER PIPING NOT INDICATED IN ALL INSTANCES FOR
SEPARATE ZONES.
ZONES. SYSTEM IS DESIGNED FOR BUBBLERS ON
DO NOT INCLUDE BUBBLERS ON ROTOR OR SPRAY
TREE BUBBLER WILL BE INSTALLED ON SEPARATE ZONES.
1.
CONTAINER SIZE BUBBLERS
BUBBLERS. BUBBLER SIZES INDICATED ON PLANS
FOLLOWING CHART TO DETERMINE THE NUMBER OF
LARGER TREES REQUIRE MULTIPLE BUBBLERS USE THE
TREE BUBBLER NOTES:
PALM 2
B&B 4
60 GAL 4
45 GAL 3
25 GAL 2
15 GAL 1
2.
3.
STREET WITH CURB STREET WITHOUT CURB
PVC sleeves.
above existing grade at each end of
2" PVC marking columns to be set 12"
NOTE:
column "capped"
Min. 2" PVC marking
(Typical Each End)
Capped or Tapped
End of Sleeve to be column "capped"
Min. 2" PVC marking
DUE TO RECLAIMED WATER.
BE MOUNTED FLUSH WITH FINAL GRADE. USE PURPLE VALVES
SIDEWALK EDGES OR BUILDING EDGES. VALVE BOXES SHALL
VALVE FOR DRAINAGE. LOCATE VALVES MIN 2' FROM ALL
AND INSTALL ONE CUBIC FOOT OF PEA GRAVEL AT BASE OF
BOXES WITH MATCHING COVERS. PLACE VALVE BOX ON BRICKS
ALL VALVES SHALL BE INSTALLED IN AMETEK VP-10 VALVE
MINIMIZE MISTING. INCLUDE ICD DECODER ON STAKE.
WITH ACU-SYNCH PRESSURE REGULATOR ADJUSTED TO 1/2"
REMOTE CONTROL VALVES: IRRITROL 200B SERIES 3/4", 1" OR 1-
design group international, inc.
TERRA
TECTONICS
727-441-4504 ph.
Fl. Reg. Lic. # 254
LANDSCAPE ARCHITECTS
STATE ROAD 60 & BAYSHORE BLVD
NO. ISSUE / REVISION BY DATE
T H
IS
D
O C
U M
E N
T C
O N
T A
IN
S
C O
P Y
R
IG
H T
E D
M A
T E
R
IA
L A
N D
T R
A D
E S
E C
R E
T I
N F
O R
M A
T
IO
N B
E L
O N
G
IN
G E
X C
L U
S
IV
E L
Y T
O W
IL
L
IA
M
S O
N D
A C
A R
A S
S O
C
IA
T E
S
IN
C
A N
Y U
N A
U T
H O
R
IZ
E D
U S
E
D
IS
C L
O S
U R
E
D
IS
S E
M
IN
A T
IO
N
O R
D U
P L
IC
A
T
IO
N O
F A
N Y
O F
T H
E I
N F
O R
M A
T
IO
N C
O N
T A
IN
E
D H
E R
E
IN
M A
Y R
E S
U L
T I
N L
IA
B
IL
IT
Y U
N D
P L
IC
A
B L
E L
A W
S
CLEARWATER SR60 TRAILHEAD PARK
BK
BK
RECORD DRAWINGS
SURVEYED BY:
REVIEWED BY:
APPROVED BY:
DRAWN BY:
PROJECT ENGINEER DATE
DATE
CITY OF CLEARWATER, FLORIDA
PARKS AND RECREATION
100 S. MYRTLE AVE.
CLEARWATER, FL 33756
INVESTIGATE BEFORE YOU EXCAVATE
CALL 811
ONE CALL
OF FLORIDA
www.callsunshine.com
(800) 432-4770
MIN. 48 HOURS
BEFORE YOU EXCAVATE
SUNSHINE STATE
DWG NAME: FIELD BOOK: SURVEYED BY: SCALE:
CONTRACT NO.: DATE DRAWN: DRAWN BY:
JOB NO.: DESIGNED BY: CHECKED BY:
APPROVED BY
DATE
100% BID PLANS
SHEET NO.:
2509-01
25000613
DESIGN DEVELOPMENT 10/31/2025
2/18/2026CONSTRUCTION DOCUMENTS
SEAL
LI
CENSE
FLORIDA
STATE OF
No. 2035
FL REG.
R E G
LANDSCAPE A
RCH
IT
E C T
BIRGIT KIBELKA FL LA2035
PERMIT SET 3/17/2026
Planting Specifications (1/2)
REFER TO SHEET
L3
PLANTING SPECIFICATIONS (1/2)
GENERAL LANDSCAPE NOTES
this project.
The Landscape Contractor will be responsible for the collection, removal, and proper disposal of any and all debris generated during the installation of 22.
Any existing sod areas that are unnecessarily disturbed during the landscape installation shall be resodded to match existing.21.
Existing sod shall be removed as necessary to accommodate new plantings.20.
No contractor identification signs shall be permitted on the project, except for the project information signs.19.
All permits necessary are to be provided by the installing contractor unless otherwise specifically stated in the specifications.18.
Manager with proper installation carried out by Landscape Contractor at no additional cost.
All materials must be as specified on the landscape plan. If materials or labor do not adhere to specifications, they will be rejected by the City Project 17.
the City Project Manager.
All dimensions to be field-checked by the Landscape Contractor prior to landscape material installation. Discrepancies shall be reported immediately to 16.
Manager.
The Landscape Contractor shall guarantee, in writing, plant survivability for a period of twelve (12) months from final acceptance by the City Project 15.
There shall be no additions, deletions or substitutions without the written approval of the City Project Manager.14.
Any and all questions concerning the plan set and/or specifications shall be directed to the City Project Manager at (727) 444-8584.13.
intended changes.
Plant material shall be bid as specified unless unavailable, at which time the City Project Manager will be notified by telephone and in writing of 12.
and the specifications.
The Landscape Contractor shall be responsible for securing all necessary applicable permits and licenses to perform the work set forth in this plan set 11.
completion for failure to report such condition, or for errors on the part of the Landscape Contractor at the time of bidding.
site conditions shall be reported to the City Project Manager in writing at the time of bidding or discovery. No account shall be made after contract
The Landscape Contractor shall be responsible for examining fully both the site and the bid documents. Discrepancies in the documents or the actual 10.
All tree and shrub locations are subject to change. All locations shall be approved by the City Project Manager prior to planting. 9.
expense.
Plants shall meet size, container, and spacing specifications. Any material not meeting specifications shall be removed and replaced at the contractor's 8.
plant key, the plan shall prevail.
The plant material schedule is presented for the convenience of the Landscape Contractor. In the event of a discrepancy between the plan and the 7.
All planting areas shall receive a 3" layer of Mini pine bark nuggets or Hardwood mulch (Coco brown), which is to be watered-in after installation.6.
capacity. It shall also be free of all extraneous debris, such as roots, stones, weeds, etc.
sawdust, leaf mold and top soil. It shall provide a good pliable and thoroughly mixed medium with adequate aeration, drainage and water-holding
The planting soil shall be the approximate proportions as follows: 50% sand and 50% organic material consisting of native peat, well-decomposed 5.
All plants shall be fertilized with Agriform 20-10-5 tablets as per the manufacturers specifications in conjunction with note # 5. 4.
All planting shall be done in accordance with the Florida Nurserymen's and Grower's Associations approved practices.3.
Consumer Services, Division of Plant Industry "Grades and Standards for Nursery Plants", 7th Edition, 1998 as revised from time to time.
All recommended trees and plant materials will be graded as Nursery Grade No. 1 or better as outlined by the Florida Department of Agriculture and 2.
The Landscape Contractor shall grade planting beds, as required, to provide positive drainage and promote optimum plant growth.1.
FERTILIZATION NOTES
between the middle and bottom of the root mass.
Tablets shall be placed uniformly around the root mass at a depth that is tablets at time of installation and prior to completion of pit backfilling.
All trees and shrubs shall be fertilized with "Agriform" 20-15-5 planting
SHRUBS AND TREES
APPLICATION RATE:
Palms: 7 - 21 Gram Tablets
Trees: 3 - 21 Gram Tablets Each 1/2" of Caliper
7 Gallon Can: 4 - 21 Gram Tablets
5 Gallon Can: 3 - 21 Gram Tablets
3 Gallon Can: 2 - 21 Gram Tablets
1 Gallon Can: 1 - 21 Gram Tablets
GROUNDCOVER AREAS
release fertilizer as per manufacturer's specifications.
All groundcover areas shall receive fertilization with "Ozmocote" time design group international, inc.
TERRA
TECTONICS
727-441-4504 ph.
Fl. Reg. Lic. # 254
LANDSCAPE ARCHITECTS
STATE ROAD 60 & BAYSHORE BLVD
NO. ISSUE / REVISION BY DATE
T H
IS
D
O C
U M
E N
T C
O N
T A
IN
S
C O
P Y
R
IG
H T
E D
M A
T E
R
IA
L A
N D
T R
A D
E S
E C
R E
T I
N F
O R
M A
T
IO
N B
E L
O N
G
IN
G E
X C
L U
S
IV
E L
Y T
O W
IL
L
IA
M
S O
N D
A C
A R
A S
S O
C
IA
T E
S
IN
C
A N
Y U
N A
U T
H O
R
IZ
E D
U S
E
D
IS
C L
O S
U R
E
D
IS
S E
M
IN
A T
IO
N
O R
D U
P L
IC
A
T
IO
N O
F A
N Y
O F
T H
E I
N F
O R
M A
T
IO
N C
O N
T A
IN
E
D H
E R
E
IN
M A
Y R
E S
U L
T I
N L
IA
B
IL
IT
Y U
N D
P L
IC
A
B L
E L
A W
S
CLEARWATER SR60 TRAILHEAD PARK
BK
BK
RECORD DRAWINGS
SURVEYED BY:
REVIEWED BY:
APPROVED BY:
DRAWN BY:
PROJECT ENGINEER DATE
DATE
CITY OF CLEARWATER, FLORIDA
PARKS AND RECREATION
100 S. MYRTLE AVE.
CLEARWATER, FL 33756
INVESTIGATE BEFORE YOU EXCAVATE
CALL 811
ONE CALL
OF FLORIDA
www.callsunshine.com
(800) 432-4770
MIN. 48 HOURS
BEFORE YOU EXCAVATE
SUNSHINE STATE
DWG NAME: FIELD BOOK: SURVEYED BY: SCALE:
CONTRACT NO.: DATE DRAWN: DRAWN BY:
JOB NO.: DESIGNED BY: CHECKED BY:
APPROVED BY
DATE
100% BID PLANS
SHEET NO.:
2509-01
25000613
DESIGN DEVELOPMENT 10/31/2025
2/18/2026CONSTRUCTION DOCUMENTS
SEAL
LI
CENSE
FLORIDA
STATE OF
No. 2035
FL REG.
R E G
LANDSCAPE A
RCH
IT
E C T
BIRGIT KIBELKA FL LA2035
PERMIT SET 3/17/2026
ROOT CORRECTION DETAIL - B&B
NOT TO SCALE
ball. Remove excess soil and roots
Tree planted too deeply in root in black) extending from root ball.
Remove structural roots (4 shown growing over structural roots.
black. Remove root (white)
Four structural roots shown in
(white) root wrapping root collar.
in black. Remove structural
Five structural (large) roots shown before they make an abrupt turn.
Remove structural roots (white) growing
Six structural roots shown in black.
Cut here.
and roots over the root collar.
2- First step 1, then step 2. Adjust hole depth to allow for the removal of excess soil
Notes:
Remove excess soil and roots to
Tree planted too deeply in root ball.
just before they make an abrupt turn.
Remove structural roots (white) growing
Seven structural roots shown in black.
Step 1 - Remove soil and roots over the root collar.
Step 2 - Remove defects.
less) at the periphery of the root ball are not or " 4
Remove structural roots (4 shown in black)
Cut here.
Cut here.
Cut here.Cut here.
Cut here.
ball surface.
New root excess roots.
Remove excess soil.
Remove Root collar.
Root collar.
ROOT CORRECTION DETAIL - CONTAINER
NOT TO SCALE
Cut here.
Remove excess substrate and roots
Tree planted too deeply in root ball.
made tangent (parallel) to the trunk.
abrupt turn. Pruning cut should be
Cut structural root just before it makes
(parallel) to the trunk (two cuts shown).
Cut structural roots just before they structural roots.
Remove root (white) growing over
Four structural roots shown in black.
(white) wrapping root collar.
in black. Remove structural root
Five structural (large) roots shown before they make an abrupt turn.
Remove roots (white) growing over
Six structural roots shown in black.
4- Small roots (1/4" or less) on the periphery of the root ball are common with container
Notes:
Remove excess substrate and roots to
Tree planted too deeply in root ball.
just before they make an abrupt turn.
Remove structural roots (white) growing
Seven structural roots shown in black.
Step 1 - Remove substrate over root collar.
Step 2 - Remove defects.
Cut here.
Cut here.
Cut here.
Cut here.
Cut here.
Cut here.
roots.
Remove excess substrate/soil.
Remove excess
Root collar.
ball surface.
New root
Root collar.
Cut here.
periphery.
Root ball
A B
Planting Specifications (2/2)
L4
JT JT
PLANTING SPECIFICATIONS (2/2)
AND NOTES, THE CITY DETAILS AND NOTES SHALL BE FOLLOWED.
WHERE DETAILS AND NOTES DIFFER FROM CITY OF CLEARWATER LANDSCAPE DETAILS
| Clearwater SR60 Trailhead Park_CDs |
| Clearwater SR60 Trailhead Park_CDs |
| Clearwater SR60 Trailhead Park_CDs |
| Clearwater SR60 Trailhead Park_CDs |
| 2026-07-21T12:19:06-0400 | |
| Birgit Kibelka |
File details come from the government source that posted it. Updated .