The Illinois Department of Transportation is soliciting bids to resurface 8.425 miles of FAP 697 (Illinois Route 9) from ILL 1 at Hoopeston to the Indiana state line, including a bridge deck overlay on S.N. 092-0048 at North Fork Vermilion River. Electronic bids are due to the iCX system by 12:00 p.m. on November 6, 2026. The project is Federal-aid under the STP program (STP-4YFN(613)), so it carries Federal requirements for Davis-Bacon wages, EEO compliance, and subletting restrictions, and the contract includes DBE (Disadvantaged Business Enterprise) participation provisions.

Scope includes traffic control, Class D patching, removal of the existing safety shoulder and HMA surface, construction of HMA shoulders, the bridge deck overlay, 1-inch HMA binder and surface courses, longitudinal joint sealant, Type B aggregate wedge shoulders, incidental HMA surface areas, and pavement markings, along with all other items necessary to complete the project. Concrete mixture quality control and comprehensive traffic control standards apply.

Schedule and risk terms are significant. The S.N. 092-0048 bridge deck overlay has an interim completion date of August 31, 2027, and all other construction must finish within 110 working days. Liquidated damages accrue per calendar day, calculated on the full awarded contract value, if the bridge improvements are not substantially complete by August 31, 2027. Several utilities must be relocated before construction, including electric poles, gas distribution lines, and fiber optic lines managed by Ameren IL, City of Hoopeston, Comcast, and Frontier Communications. Monitoring is required at eleven ISGS contaminated sites along the corridor, under Article 669 protocols for regulated substances removal and worker protection.

Place of performance is Vermilion County, Illinois. The contract will be awarded to the lowest responsive and responsible bidder.

Opportunity text

DESCRIPTION OF WORK 1. Establish Traffic Control on FAP 697 2. Class D Patching 3. Pavement removal of existing safety shoulder 4. Construct HMA shoulders 5. HMA surface removal on existing HMA pavement 6. Bridge deck overlay on S.N. 092-0048 7. Resurfacing with 1 HMA Binder Course 8. Longitudinal Joint Sealant 9. Resurface with 1 HMA Surface Course 10. Placing Aggregate Wedge Shoulders, Type B 11. Resurfacing Incidental HMA Surface Areas 12. Place Pavement Markings 13. All other items necessary to complete the project. Location: The intent of the project is to resurface FAP 697 between ILL 1 at Hoopeston to the Indiana state line and a bridge deck overlay on S.N. 092-0048 at N Fork Vermilion River 0.3 miles west of 1700 RD east of Hoopeston.

Files

File Type Posted
ildot 70E42-074.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors