ildot 70E42-074.pdf
PDF 11 MB Posted
- Solicitation number
- 70E42
- Issued by
- Vermilion County, Illinois
About this file
This is a Notice to Bidders and Special Provisions document from the Illinois Department of Transportation (IDOT) for a highway construction project in Vermilion County. The project involves resurfacing 8.425 miles of FAP 697 (Illinois Route 9) from ILL 1 at Hoopeston to the Indiana State Line, including a bridge deck overlay at North Fork Vermilion River (S.N. 092-0048). Work includes establishing traffic control, Class D patching, HMA surface removal, construction of HMA shoulders, placement of 1-inch HMA binder and surface courses, longitudinal joint sealant installation, aggregate wedge shoulders, and pavement markings. Electronic bids must be submitted to the iCX system by 12:00 p.m. on November 6, 2026. An interim completion date of August 31, 2027 is required for the bridge deck overlay improvements on S.N. 092-0048, with all other construction to be completed within 110 working days. The contract award will be made to the lowest responsive and responsible bidder, and the project is part of the STP-4YFN(613) funding program with Federal-aid support.
The project involves multiple supplemental specifications and recurring special provisions, including quality control requirements for concrete mixtures, DBE (Disadvantaged Business Enterprise) participation provisions, and comprehensive traffic control standards. Liquidated damages apply if the S.N. 092-0048 improvements are not substantially complete by August 31, 2027, calculated per calendar day based on the full awarded contract value. Multiple utility relocations are required before construction, including electric poles, gas distribution lines, and fiber optic lines managed by various providers such as Ameren IL, City of Hoopeston, Comcast, and Frontier Communications. Environmental considerations are significant, with monitoring required for eleven ISGS contaminated sites along the project corridor related to historical commercial and industrial uses, requiring adherence to Article 669 protocols for regulated substances removal and worker protection. Funding sources include Federal-Aid funds through the STP program, obligating compliance with Federal requirements and certifications regarding Davis-Bacon wages, EEO compliance, and subletting restrictions for Federal-aid contracts.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Letting November 6, 2026
Notice to Bidders, Specifications and Proposal
Contract No. 70E42 VERMILION County Section 46RS-9 & 1RS-3 & (46)BR-1 Route FAP 697 Project STP-4YFN(613) District 5 Construction Funds
Prepared by F
Checked by
(Printed by authority of the State of Illinois)
NOTICE TO BIDDERS
1. TIME AND PLACE OF OPENING BIDS. Electronic bids are to be submitted to the electronic bidding system (iCX-Integrated Contractors Exchange). All bids must be submitted to the iCX system prior to 12:00 p.m.
November 6, 2026 at which time the bids will be publicly opened from the iCX SecureVault.
2. DESCRIPTION OF WORK. The proposed improvement is identified and advertised for bids in the
Invitation for Bids as:
Contract No. 70E42 VERMILION County Section 46RS-9 & 1RS-3 & (46)BR-1 Project STP-4YFN(613) Route FAP 697 District 5 Construction Funds
8.425 miles of 3P policy - standard overlay from ILL 1 at Hoopeston to the Indiana State Line; also, non-interstate bridge preservation - bridge deck overlay at North Fork Vermilion River 0.3 miles west of 1700 Rd east of Hoopeston.
3. INSTRUCTIONS TO BIDDERS. (a) This Notice, the invitation for bids, proposal and letter of award shall, together with all other documents in accordance with Article 101.09 of the Standard Specifications for Road and Bridge Construction, become part of the contract. Bidders are cautioned to read and examine carefully all documents, to make all required inspections, and to inquire or seek explanation of the same prior to submission of a bid.
(b) State law, and, if the work is to be paid wholly or in part with Federal-aid funds, Federal law requires the bidder to make various certifications as a part of the proposal and contract. By execution and submission of the proposal, the bidder makes the certification contained therein. A false or fraudulent certification shall, in addition to all other remedies provided by law, be a breach of contract and may result in termination of the contract.
4. AWARD CRITERIA AND REJECTION OF BIDS. This contract will be awarded to the lowest responsive and responsible bidder considering conformity with the terms and conditions established by the Department in the rules, Invitation for Bids and contract documents. The issuance of plans and proposal forms for bidding based upon a prequalification rating shall not be the sole determinant of responsibility. The Department reserves the right to determine responsibility at the time of award, to reject any or all proposals, to re-advertise the proposed improvement, and to waive technicalities.
By Order of the Illinois Department of Transportation
Gia Biagi, Secretary
FAP Route 697 (IL 9)
Section 46RS-9 & 1RS-3 & (46)BR-1 Vermilion County
INDEX
FOR
SUPPLEMENTAL SPECIFICATIONS
AND RECURRING SPECIAL PROVISIONS
Adopted January 1, 2026
This index contains a listing of SUPPLEMENTAL SPECIFICATIONS, frequently used RECURRING SPECIAL PROVISIONS, and LOCAL ROADS AND STREETS RECURRING SPECIAL PROVISIONS.
ERRATA Standard Specifications for Road and Bridge Construction (Adopted 1-1-22) (Revised 1-1-26)
SUPPLEMENTAL SPECIFICATIONS
Std. Spec. Sec. Page No.
109 Measurement and Payment 202 Earth and Rock Excavation 204 Borrow and Furnished Excavation 207 Porous Granular Embankment 211 Topsoil and Compost 214 Grading and Shaping Ditches 406 Hot-Mix Asphalt Binder and Surface Course 407 Hot-Mix Asphalt Pavement (Full-Depth) 420 Portland Cement Concrete Pavement 502 Excavation for Structures 504 Precast Concrete Structures 509 Metal Railings 522 Retaining Walls 540 Box Culverts 542 Pipe Culverts 550 Storm Sewers 586 Granular Backfill for Structures 601 Pipe Drains, Pipe Underdrains, and French Drains 630 Steel Plate Beam Guardrail 632 Guardrail and Cable Road Guard Removal 644 High Tension Cable Median Barrier 665 Woven Wire Fence 701 Work Zone Traffic Control and Protection 781 Raised Reflective Pavement Markers 782 Reflectors 801 Electrical Requirements 821 Roadway Luminaires
1003 Fine Aggregates 1004 Coarse Aggregates 1010 Finely Divided Minerals 1020 Portland Cement Concrete ……… 1030 Hot-Mix Asphalt 1040 Drain Pipe, Tile, and Wall Drain 1042 Precast Concrete Products 1061 Waterproofing Membrane System 1067 Luminaire ……… 1097 Reflectors 1102 Hot-Mix Asphalt Equipment
Section 46RS-9 & 1RS-3 & (46)BR-1
RECURRING SPECIAL PROVISIONS
The following RECURRING SPECIAL PROVISIONS indicated by an “X” are applicable to this contract and are included by reference:
CHECK SHEET # PAGE NO.
1 X Additional State Requirements for Federal-Aid Construction Contracts 2 X Subletting of Contracts (Federal-Aid Contracts)
3 X EEO
4 Specific EEO Responsibilities Nonfederal-Aid Contracts 5 Required Provisions - State Contracts 6 Asbestos Bearing Pad Removal 7 Asbestos Waterproofing Membrane and Asbestos Hot-Mix Asphalt Surface Removal 8 Temporary Stream Crossings and In-Stream Work Pads 9 X Construction Layout Stakes
10 Use of Geotextile Fabric for Railroad Crossing 11 Subsealing of Concrete Pavements 12 Hot-Mix Asphalt Surface Correction 13 X Pavement and Shoulder Resurfacing 14 Patching with Hot-Mix Asphalt Overlay Removal 15 Polymer Concrete 16 Reserved 17 Bicycle Racks 18 X Temporary Portable Bridge Traffic Signals 19 Nighttime Inspection of Roadway Lighting 20 English Substitution of Metric Bolts 21 Calcium Chloride Accelerator for Portland Cement Concrete 22 Quality Control of Concrete Mixtures at the Plant 23 X Quality Control/Quality Assurance of Concrete Mixtures 24 Reserved 25 Reserved 26 Temporary Raised Pavement Markers 27 Restoring Bridge Approach Pavements Using High-Density Foam 28 Portland Cement Concrete Inlay or Overlay 29 Portland Cement Concrete Partial Depth Hot-Mix Asphalt Patching 30 Longitudinal Joint and Crack Patching 31 Concrete Mix Design – Department Provided 32 X Station Numbers in Pavements or Overlays
Section 46RS-9 & 1RS-3 & (46)BR-1 i
TABLE OF CONTENTS
INTENT OF PROJECT
DESCRIPTION OF WORK
INTERIM COMPLETE DATE - S.N. 092-0048
TRAFFIC CONTROL PLAN
CONTRACTOR ACCESS
GUARDRAIL REMOVAL AND INSTALLATION
PUBLIC NOTIFICATION
NOTIFICATION PRIOR TO LANE CLOSURES
STAGE CONSTRUCTED ACROSS ROAD STRUCTURES
TRAFFIC CONTROL AND PROTECTION, STANDARD 701316 AND 701321
WIDTH RESTRICTIONS
APPROACH SLAB REMOVAL
COLD MILLING (SPECIAL)
COOPERATION BETWEEN CONTRACTORS
CONCRETE MEDIAN SURFACE REMOVAL
EXISTING STATE-OWNED UTILITIES
FOG SEAL
GROOVING FOR RECESSED PAVEMENT MARKINGS
HOT-MIX ASPHALT SURFACE REMOVAL
HOT-MIX ASPHALT SURFACE REMOVAL , 2¾”
HOT-MIX ASPHALT SURFACE REMOVAL, SPECIAL
MAINTENANCE OF ROADWAY DRAINAGE
PAVEMENT PATCHING – CLASS D AND PARTIAL DEPTH
RAILROAD PROTECTIVE LIABILITY INSURANCE (BDE)
RAISED REFLECTIVE PAVEMENT MARKER REMOVAL
RECTANGULAR RAPID FLASHING BEACON ASSEMBLY (COMPLETE)
REMOVAL AND DISPOSAL OF REGULATED SUBSTANCES
REMOVE RIGHT-OF-WAY MARKERS
RESETTING OF SECTION CORNERS
SEEDING
STEEL PLATE BEAM GUARDRAIL (SHORT RADIUS)
STRINGLINE
Section 46RS-9 & 1RS-3 & (46)BR-1 ii
STRUCTURAL STEEL REMOVAL
STRUCTURAL STEEL REPAIR
STATUS OF UTILITIES
CLEANING AND PAINTING CONTACT SURFACE AREAS OF EXISTING STEEL
STRUCTURES
DIAMOND GRINDING AND SURFACE TESTING BRIDGE SECTIONS
BRIDGE DECK GROOVING (LONGITUDINAL)
HOT DIP GALVANIZING FOR STRUCTURAL STEEL
BAR SPLICERS, HEADED REINFORCEMENT
AUTOMATED FLAGGER ASSISTANCE DEVICES (BDE)
BITUMINOUS MATERIALS COST ADJUSTMENTS (BDE)
BRIDGE DECK CONCRETE OVERLAYS
CEMENT, FINELY DIVIDED MINERALS, ADMIXTURES, CONCRETE, AND MORTAR (BDE)
COMPENSABLE DELAY COSTS (BDE)
CONCRETE BARRIER (BDE)
DECK SLAB REPAIR
DISADVANTAGED BUSINESS ENTERPRISE PARTICIPATION (BDE)
ENGINEER’S FIELD OFFICE (BDE)
EROSION CONTROL BLANKET (BDE)
FUEL COST ADJUSTMENT (BDE)
GUARDRAIL (BDE)
HOT-MIX ASPHALT (BDE)
HOT-MIX ASPHALT – LONGITUDINAL JOINT SEALANT (BDE)
PAVEMENT MARKING (BDE)
PAVEMENT PATCHING (BDE)
PERFORMANCE GRADED ASPHALT BINDER (BDE)
RAISED REFLECTIVE PAVEMENT MARKERS (BDE)
REMOVAL AND DISPOSAL OF REGULATED SUBSTANCES (BDE)
SEEDING (BDE)
SHORT TERM AND TEMPORARY PAVEMENT MARKINGS (BDE)
SIGN PANELS AND APPURTENANCES (BDE)
SINUSOIDAL RUMBLE STRIPS (BDE)
SOURCE OF SUPPLY AND QUALITY REQUIREMENTS (BDE)
Section 46RS-9 & 1RS-3 & (46)BR-1 iii
STEEL COST ADJUSTMENT (BDE)
SUBCONTRACTOR AND DBE PAYMENT REPORTING (BDE)
SUBCONTRACTOR MOBILIZATION PAYMENTS (BDE)
SUBMISSION OF BIDDERS LIST INFORMATION (BDE)
SUBMISSION OF PAYROLL RECORDS – FEDERAL AID CONTRACT (BDE)
SURFACE TESTING OF PAVEMENTS – IRI (BDE)
SURVEYING SERVICES (BDE)
TEMPORARY CONCRETE BARRIER (BDE)
TEMPORARY RUMBLE STRIPS (BDE)
TRAINING SPECIAL PROVISIONS (BDE)
IDOT TRAINING PROGRAM GRADUATE ON-THE-JOB TRAINING SPECIAL PROVISION 121
VEHICLE AND EQUIPMENT WARNING LIGHTS (BDE)
WEEKLY DBE TRUCKING REPORTS (BDE)
WORK ZONE TRAFFIC CONTROL DEVICES (BDE)
WORK ZONE WIDTH RESTRICTION (BDE)
WORKING DAYS (BDE)
PROJECT LABOR AGREEMENT
SWPPP
Section 46RS-9 & 1RS-3 & (46)BR-1
STATE OF ILLINOIS
SPECIAL PROVISIONS
The following Special Provisions supplement the “Standard Specifications for Road and Bridge Construction, Adopted January 1, 2022”, the latest edition of the “Manual on Uniform Traffic Control Devices for Streets and Highways”, and the “Manual of Test Procedures for Materials” in effect on the date of invitation for bids, and the “Supplemental Specifications and Recurring Special Provisions” indicated on the Check Sheet included herein, which apply to and govern the construction of FAP Route 697 (IL 9), Project STP-4YFN(613), Section 46RS-9 & 1RS-3 & (46)BR-1, Vermilion County, Contract No. 70E42 and in case of conflict with any part, or parts, of said Specifications, the said Special Provisions shall take precedence and shall govern.
INTENT OF PROJECT
The intent of the project is to resurface FAP 697 between ILL 1 at Hoopeston to the Indiana state line and a bridge deck overlay on S.N. 092-0048 at N Fork Vermilion River 0.3 miles west of 1700 RD east of Hoopeston.
This work shall be completed utilizing lane closures in accordance with the applicable Highway Standards. Appropriate measures shall be taken by the Contractor to preserve and protect the surrounding environment.
DESCRIPTION OF WORK
1. Establish Traffic Control on FAP 697
2. Class D Patching
3. Pavement removal of existing safety shoulder
4. Construct HMA shoulders
5. HMA surface removal on existing HMA pavement
6. Bridge deck overlay on S.N. 092-0048
7. Resurfacing with 1 ¼” HMA Binder Course
8. Longitudinal Joint Sealant
9. Resurface with 1 ½” HMA Surface Course
10. Placing Aggregate Wedge Shoulders, Type B
11. Resurfacing Incidental HMA Surface Areas
12. Place Pavement Markings
13. All other items necessary to complete the project
Section 46RS-9 & 1RS-3 & (46)BR-1
INTERIM COMPLETE DATE - S.N. 092-0048
It is the Department’s intent that an Interim Completion Date of August 31, 2027 be required on this project. The items of work that need to be completed by August 31, 2027 include the proposed improvements to S.N. 092-0048.
It is the Department’s intent that all other construction operations not required to be completed by the August 31, 2027 Interim Completion Date be completed using 110 working days provided in the contract. Multiple crews and/or extended work hours may be needed to ensure that this work is completed by the deadlines stated. Under extenuating circumstances, the Engineer may direct that certain items of work, not affecting the safe opening of the roadway to traffic, may be completed within the working days allowed for clean-up work and punch list items.
If the S.N. 092-0048 improvements are not complete, except for clean-up work and punch list items, by August 31, 2027 the Contractor shall be liable and shall pay to the Department the amount per calendar day shown in the table in Article 108.09, and based on the full awarded value of the contract, not as penalty but as liquidated damages, for each day of overrun in the contract time or such extended time as may have been allowed.
TRAFFIC CONTROL PLAN
Eff. 09-11-1990 Rev. 01-01-2024
Traffic control shall be in accordance with the applicable sections of the Standard Specifications for Road and Bridge Construction, the applicable guidelines contained in the Illinois Manual on Uniform Traffic Control Devices for Streets and Highways, these Special Provisions and any special details and highway standards contained herein and in the plans.
Special attention is called to Articles 107.09 and 107.14 of the Standard Specifications, the following Highway Standards relating to Traffic Control, and the listed Supplemental Specifications and Recurring Special Provisions.
Highway Standards: 701001 701006 701011 701201 701301
701306 701311 701321 701336 701501
701502 701801 701901
Special Provisions: Contractor Access Guardrail Removal and Installation Notification Prior to Lane Closures Stage Constructed Across Road Structures Traffic Control & Protection, Standard 701201 Traffic Control & Protection, Standard 701316 and 701321 Traffic Control Removal Width Restrictions
Plan Details: FAP 697 (ILL 9) STAGING TYPICAL SECTIONS DETAILS
STRUCTURE REPLACEMENT STAGING DETAILS
WIDTH RESTRUCTION MAP DETAILS
Section 46RS-9 & 1RS-3 & (46)BR-1
Traffic: It is the intention of the Department that FAP 697 be kept open to traffic at all times during the construction of this section. One-way traffic will be permitted in the immediate work areas during construction. At all other times, two-way traffic shall be maintained throughout the project.
During the bridge deck overlay of S.N. 092-0048, staged construction will be utilized.
At any particular location, the Contractor shall work on only one side of the pavement at a time and shall keep all equipment, materials and vehicles off the pavement, the shoulder, and right-of-way on the side of the pavement open to traffic.
The Contractor shall provide and maintain access to commercial and private properties and sideroads abutting the roadway being improved in accordance with Article 107.09 of the Standard Specifications.
During periods when material or equipment is being hauled to or from the project site all haul trucks shall have at least one (1) flashing amber light or one (1) set of dual emergency flashers, operating when within the lane closure. In addition “WORK TRUCK DO NOT FOLLOW” shall be displayed on the rear of all haul trucks. Displays shall be 36 inch x 18 inch (0.91 m x 0.46 m) made of Fluorescent Orange reflective material as specified in Article 1106.01. This work shall be considered as included in the contract unit prices for the construction items involved and no additional compensation will be allowed.
Parking of personal vehicles within the right-of-way will be strictly prohibited. Off-site parking and transportation arrangements shall be the responsibility of the Contractor.
Limits of Construction: The Contractor shall coordinate the items of work in order to keep hazards and traffic inconveniences to a minimum, as specified below.
1. The Contractor shall provide, erect and maintain all the necessary barricades, cones, drums, flags and lights for the warning and protection of traffic, as required by Sections 107 and 701 through 703 of the Standard Specifications.
2. In addition to the flaggers required by the various standards, additional flaggers shall be provided, if required by the Engineer, and they will be paid for in accordance with Article
109.04 of the Standard Specifications.
3. The Contractor shall have responsibility for all Traffic Control Devices throughout the entire project. Any additional work or material shall be included in the price of the various traffic control items.
4. At any particular location, the Contractor shall work on only one side of the pavement at a time and shall keep all equipment, materials and vehicles off the pavement, the shoulder, and right-of-way on the side of the pavement open to traffic.
5. Any inconveniences or delays caused to the Contractor in complying with this Special
Provision will be considered as included in the price of the various traffic control items.
The following traffic control standards shall be utilized during, but not limited to, the listed construction operations:
Section 46RS-9 & 1RS-3 & (46)BR-1
TRAFFIC CONTROL AND PROTECTION, STANDARD 701001
This standard shall be utilized for off-road operations that will take place more than 15’ the edge of pavement. Applications may include, but not limited to side slope changes, landscaping operations, and minor cleanup operations.
Traffic Control and Protection, Standard 701001 will not be measured for payment in accordance with Article 701.19(a) of the Standard Specifications.
TRAFFIC CONTROL AND PROTECTION, STANDARD 701006
This standard shall be utilized for off-road operations that will take place 15’ to 24” from the edge of pavement. Applications may include, but not limited to side slope changes, landscaping operations, culvert headwall modifications, and minor cleanup operations.
Traffic Control and Protection, Standard 701006 will not be measured for payment in accordance with Article 701.19(a) of the Standard Specifications.
TRAFFIC CONTROL AND PROTECTION, STANDARD 701011
Traffic Control and Protection, Standard 701011 shall be utilized during any off-road moving operation located within 15 ft from the pavement edge. Traffic Control and Protection, Standard 701011 will not be measured for payment.
TRAFFIC CONTROL AND PROTECTION, STANDARD 701201
This standard shall be utilized for operations that require a lane closure. Applications may include, but not limited to pavement patching, milling, resurfacing, and shoulder construction.
Traffic Control and Protection, Standard 701201 will be measured and paid for at the contract unit price per LUMP SUM for TRAFFIC CONTROL AND PROTECTION STANDARD 701201.
TRAFFIC CONTROL AND PROTECTION, STANDARD 701301
This standard shall be utilized when any vehicles, equipment, workers or their activities require lane closure for no longer than 60 minutes in duration. A typical application may include minor cleanup operations.
Traffic Control and Protection, Standard 701301 will not be measured for payment in accordance with Article 701.19(a) of the Standard Specifications.
TRAFFIC CONTROL AND PROTECTION, STANDARD 701306
This standard is intended to be used during the rumble strip operation. This standard is appropriate where at any time, any vehicle, equipment, workers or their activities require an intermittent or continuous moving operation on the pavement where the average speed of movement is greater than 1 mph and less than 4 mph. Applications may include, but not limited to milling and resurfacing.
Traffic Control and Protection, Standard 701306 will be measured and paid for at the contract unit price per LUMP SUM for TRAFFIC CONTROL AND PROTECTION STANDARD 701306.
TRAFFIC CONTROL AND PROTECTION, STANDARD 701311
This standard is appropriate where all construction operations will require a continuous moving operation where the average speed is greater than 3 mph. Typical applications may include pavement marking.
Section 46RS-9 & 1RS-3 & (46)BR-1
Traffic Control and Protection, Standard 701311 will not be measured for payment in accordance with Article 701.19(a) of the Standard Specifications.
TRAFFIC CONTROL AND PROTECTION, STANDARD 701321
This standard shall be used for the bridge deck overlay on S.N. 092-0048.
TRAFFIC CONTROL AND PROTECTION, STANDARD 701321 will be measured and paid for at the contract unit price per EACH for Traffic Control and Protection, Standard 701321.
TRAFFIC CONTROL AND PROTECTION, STANDARD 701336
This standard is appropriate where construction operations will require intermittent lane closures for speeds of 45 MPH or more. Applications may include, but not limited to pavement patching.
Traffic Control and Protection, Standard 701336 will be measured and paid for at the contract unit price per LUMP SUM for TRAFFIC CONTROL AND PROTECTION STANDARD 701336.
TRAFFIC CONTROL AND PROTECTION, STANDARD 701501
This standard is appropriate where construction operations will require an urban lane closure.
Applications may include, but not limited to pavement patching, milling, resurfacing, and shoulder construction.
Traffic Control and Protection, Standard 701501 will be measured and paid for at the contract unit price per LUMP SUM for TRAFFIC CONTROL AND PROTECTION STANDARD 701501.
TRAFFIC CONTROL AND PROTECTION, STANDARD 701502
This standard is appropriate where construction operations will require an urban lane closure with bidirectional left turn lane. Applications may include, but not limited to pavement patching, milling, resurfacing, and pavement marking.
Traffic Control and Protection, Standard 701502 will be measured and paid for at the contract unit price per LUMP SUM for TRAFFIC CONTROL AND PROTECTION STANDARD 701502.
TRAFFIC CONTROL AND PROTECTION, STANDARD 701801
This standard is appropriate where construction operations will require a sidewalk corner or crosswalk closure. Applications may include, but not limited to ADA improvements.
Traffic Control and Protection, Standard 701801 will be measured and paid for at the contract unit price per LUMP SUM for TRAFFIC CONTROL AND PROTECTION STANDARD 701801.
CONTRACTOR ACCESS
Eff. 09-11-1990 Rev. 01-01-2014
At road closure locations, where Type III barricades are installed in a manner that will not allow contractor access to the project without relocation of one or more of the barricades, the arrangement of the barricades at the beginning of each work day may be relocated, when approved by the Engineer, in the manner shown on Highway Standard 701901 for Road Closed to Through Traffic. ' Road Closed ' signs (Rll-2), supplemented by ' Except Authorized Vehicles ' signs (R3-Il0l), shall be mounted on both the near-right and the far-left barricade(s). At the end
Section 46RS-9 & 1RS-3 & (46)BR-1 of each work day the barricades shall be returned to their in-line positions. This work will be considered to be included in the cost of the various traffic control items and no extra compensation will be allowed.
GUARDRAIL REMOVAL AND INSTALLATION
This work shall be done in accordance with Sections 630, 631, 632, 633, and 701.17(f) of the Standard Specifications and as modified herein:
New or additional guard rail shall be completed within three days after the posts have been installed.
Any inconvenience or delays caused the Contractor in complying with this Special Provision will be at no additional cost to the Department.
PUBLIC NOTIFICATION
A total of two (2) Changeable Message Signs shall be placed seven (7) days prior to starting construction operations on S.N. 092-0048 to inform the public of the lane closure. One (1) Changeable Message Sign shall be placed in each direction on FAP 693/ (ILL 9) in advance of the structure at locations to be determined by the Engineer.
NOTIFICATION PRIOR TO LANE CLOSURES
Eff. 01-01-2024
The Contractor shall notify the Department’s Bureau of Operations and the individuals and organizations listed below at least two (2) weeks prior to the start of the project and two (2) weeks prior to any lane closures.
Name Organization Phone Number Robert Hodgson Traffic Operations Engineer (D5) (217)-251-4859 Jodi Theirl Operations Executive Secretary (217)-466-7289 Illinois State Police (Troop 7) (217)-867-2050 Adrian L. Greenwell Vermilion County Engineer (217)-918-7036 Patrick Hartshorn Vermilion County Sheriff (217)-442-4080 Hoopeston Area School District #11 (217)-283-6668 Hoopeston Fire Department (217)-283-5196 Hoopeston Police Department (217)-283-5196 Arrow/Carle Ambulance (217)-383-3311 City of Hoopeston (217)-283-5833
The Contractor shall also notify David Burkybile, Traffic Signal System Engineer (District 5) two weeks prior to start of the project to allow time to give advance overhead sign warnings of the upcoming project.
These agencies, organizations, and individuals shall also be notified when the project is complete.
Section 46RS-9 & 1RS-3 & (46)BR-1
STAGE CONSTRUCTED ACROSS ROAD STRUCTURES
Across road structures shall be constructed in half-lengths at locations as designated by the Engineer. During this operation, one-way traffic shall be permitted.
These structures shall be constructed in half-lengths and in accordance with applicable portions of Article 701.17(e) of the Standard Specifications.
This work shall be accomplished by laying the first half-length of the structure, backfilling to the top of the sub-grade with the material specified on the plan detail, and then placing either a permanent or temporary patch. Permanent patches shall conform to the applicable portions of Section 442 of the Standard Specifications and to these Special Provisions. Temporary patches shall consist of CA-6 compacted to the satisfaction of the Engineer and graded to within 2 inches (50 mm) below the existing surface, and a 2 inch (50 mm) lift of hot-mix asphalt meeting the approval of the Engineer used for the top 2 inch (50 mm) lift. The patches shall be placed before opening to traffic.
If temporary patches are used they will be placed, maintained and removed as directed by the Engineer at no additional cost to the State.
Temporary patches will not be paid for separately but will be considered included in the cost of the across road structure involved. Any delays or inconveniences caused the Contractor due to complying with this requirement will be considered to be included in the cost of the contract and no additional compensation will be allowed.
TRAFFIC CONTROL AND PROTECTION, STANDARD 701201
Eff. 02-11-1999 Rev. 04-01-2009
Traffic Control and Protection, Standard 701201 shall be utilized during pavement patching operations, and any other operations encroaching within 2 feet (600 mm) of the edge of pavement.
Work shall be completed in accordance with Highway Standard 701201 except the distance between the flagger sign and the flagger shall be a minimum distance of 200 feet (60 m) and the maximum distance shall be determined by the Engineer, but should not exceed ½ the length required for one normal working day’s operation or 2 miles (3200 m), whichever is less. Traffic Control and Protection, Standard 701201 will be measured for payment on a lump sum basis and paid for at the contract lump sum price for TRAFFIC CONTROL AND PROTECTION, STANDARD 701201.
Section 46RS-9 & 1RS-3 & (46)BR-1
TRAFFIC CONTROL AND PROTECTION, STANDARD 701316 AND 701321
Eff. 05-01-2002 Rev. 03-01-2009
This work shall be in accordance with Article 701 and the Highway Standard with the following additional information:
Induction Loop Placement The induction loops shall be placed in accordance with Highway Standards 701316 or 701321;
886006 and as specified. The near edge of the far loop shall be placed 115 feet (35 m) behind the stop bar. The near loops shall be placed 10 feet (3 m) behind the stop bar as shown on the standard. Signal timing will be as follows:
Phase Timing for Each Phase Connection (In Seconds)
Φ1 Φ2 Φ3 Φ4 Φ5 Φ6 Φ7 Φ8 Minimum Green 12 12 Additional Init. 2.0 2.0 Maximum Init. 20 20 Maximum I 25 25 Passage 2.5 2.5 Minimum Gap 2.5 2.5 Amber Clear 3.5 3.5 Red Clearance ∗ ∗ All Red A B
∗ This timing shall be obtained from the District Traffic Control Supervisor and accomplished by utilizing overlaps. Timings for these overlaps are calculated as follows:
Green ** sec. ** G = L. (Round timing up) Amber 3.5 sec. 44 ft/sec Red 0 sec.
L = Stop bar to Stop bar distance in feet.
Loops 1, 2, & 3 are on separate amplifiers (3 total / approach).
Loop 1 set on pulse.
Loops 2 & 3 set on normal.
Loop 3 – delay 2 seconds in amplifier/delay inhibit wired to corresponding phase green.
The advisory speed signs or plates shall show a speed of 30 mph.
Loop layout
2 1
Section 46RS-9 & 1RS-3 & (46)BR-1
WIDTH RESTRICTIONS
Eff. 12-07-1999 Rev. 04-27-2021
The work within this contract will cause a width restriction requiring notification a minimum of 21 days prior to the actual width restriction and/or event requiring “Maximum Width” signing. All “Maximum Width” signing shall be furnished, erected, maintained and removed by the Contractor for placement at the locations shown within the contract plans.
Width restrictions shall be interpreted as any change in the existing horizontal clearance caused by the placement of physical barrier(s) that extend above the pavement surface. Width restrictions less than 17’-6” (Barrier to Barrier) shall be reported and signed on all roadways. Width restrictions of 17’-6” to 30’-0” on Interstate or multilane roadways shall be reported. Construction activities which close a lane with operating equipment, or with drums, barricades, or cones, will be considered as width restrictions.
Notification of width restriction requires a minimum of 21 days before the actual restriction is placed to ensure specific routed over-width permitted loads are not sent through the restriction site. The Contractor shall notify the Resident Engineer a minimum of 21 days prior to the width restriction. In the notification, the Contractor shall include the location, scheduled restriction start date, road restriction width(s)/closure, proposed posted width (i.e. Barrier to Barrier width minus 18 inches).
The Contractor is advised he will not be allowed to install the width restriction without the 21 day notice and failure to provide proper notice will delay the installation of the width restriction.
The notice of width restriction is considered a part of the Contractor’s approved work schedule and is the Contractor’s responsibility to provide proper notice. Delays caused by failure to provide notice shall not be considered justification for work day additions or completion date extensions.
All work associated with the furnishing, erecting, maintaining, and removal of Width Restriction Signing will be paid for at the contract Lump Sum Price for WIDTH RESTRICTION SIGNING.
APPROACH SLAB REMOVAL
This work shall consist of the removal and satisfactory disposal of the existing approach slabs and paved shoulders as shown in the plans.
This work shall be performed in accordance with Section 440 of the Standard Specifications and shall include the removal of the complete approach slab including all reinforcing and any pavement connectors including paved shoulders.
This work will be measured and paid for at the contract unit price per square yard for APPROACH SLAB REMOVAL and no additional compensation will be allowed.
COLD MILLING (SPECIAL)
This work shall consist of all equipment, labor, and materials required for the removal and disposal of the existing Hot-Mix Asphalt located in the existing curb and gutter flag and shall be done in accordance with Section 440 of the Standard Specifications.
Section 46RS-9 & 1RS-3 & (46)BR-1
This work shall be measured and paid for at the contract unit price per square yard for COLD MILLING (SPECIAL) and no additional compensation will be allowed.
COOPERATION BETWEEN CONTRACTORS
There is a possibility that other Contractor’s operations may be ongoing within the proposed project limit at the same time as the work included in this contract is being performed. The Contractor for this section shall cooperate with any other Contractors performing work adjacent to this project in accordance with Article 105.08 of the Standard Specifications. Any inconveniences or delays caused the Contractor in complying with this requirement shall be considered incidental to the contract and no additional compensation will be allowed.
CONCRETE MEDIAN SURFACE REMOVAL
This work shall consist of the removal and satisfactory disposal of all existing concrete median surfaces at the locations shown in the plans or determined by the Engineer. The work shall be done in accordance with Article 440.03 of the Standard Specifications.
This work will be paid for at the contract unit price per square foot (square meter) for CONCRETE MEDIAN SURFACE REMOVAL and no additional compensation will be allowed.
EXISTING STATE-OWNED UTILITIES
Eff. 04-01-2020
Existing state-owned and maintained underground utilities exist with the right of way. The Department is not a member of JULIE and does not locate its own facilities. The Contractor shall be responsible for securing an approved locating firm to locate all existing Department underground facilities prior to commencing any excavation, per the requirements of Article 803 of the Standard Specifications. Utility locates may be also required outside the project limits for traffic control signing and other items. The Contractor may obtain, on request, plans of existing electrical facilities from the Department. For further information, the contractor may contact the District Traffic Operations Engineer, Robert Hodgson, at 217-712-9018.
This work shall not be paid for separately but shall be considered included in the various pay items for which JULIE locations are required.
FOG SEAL
Temporary Pavement Marking shall be placed prior to Raised Reflective Pavement Markers (RRPMs) to establish locations. After RRPMs are placed, Shoulder and Sinusoidal Rumble Strips shall be constructed, followed by Permanent Pavement Marking.
Fog seal shall be applied over the rumble strips and paid at the contract unit price per pound for
BITUMINOUS MATERIAL (TACK COAT).
Section 46RS-9 & 1RS-3 & (46)BR-1
GROOVING FOR RECESSED PAVEMENT MARKINGS
Effective: November 1, 2017 Revised: September 24, 2021
Description. This work shall consist of grooving the pavement surface in preparation for the application of recessed pavement markings.
Equipment. Equipment shall be according to the following.
(a) Preformed Plastic Pavement Marking Installations: The grooving equipment shall have a free-floating saw blade cutting head equipped with gang-stacked diamond saw blades.
The diamond saw blades shall be of uniform wear and shall produce a smooth textured surface. Any ridges in the groove shall have a maximum height of 15 mils (0.38 mm).
(b) Paint, Epoxy, Polyurea, Modified Urethane, and Thermoplastic Pavement Marking
Installations: The grooving equipment shall be equipped with either a free-floating saw blade cutting head or a free-floating grinder cutting head configuration with diamond or carbide tipped cutters and shall produce an irregular textured surface.
CONSTRUCTION REQUIREMENTS
General. The Contractor shall supply the Engineer with a copy of the pavement marking material manufacturer’s recommendations for constructing a groove.
Pavement Grooving Methods. The grooves for recessed pavement markings shall be constructed using the following methods.
(a) Wet Cutting Head Operation. When water is required or used to cool the cutting head, the groove shall be flushed with high pressure water immediately following the cut to avoid build up and hardening of slurry in the groove. The pavement surface shall be allowed to dry for a minimum of 24 hours prior to the final cleaning of the groove and application of the pavement marking material.
(b) Dry Cutting Head Operation. When used on HMA pavements, the groove shall be vacuumed or cleaned by blasting with high-pressure air to remove loose aggregate, debris, and dust generated during the cutting operation. When used on PCC pavements, the groove shall be flushed with high pressure water or shot blasted to remove any PCC particles that may have become destabilized during the grooving process. If high pressure water is used, the pavement surface shall be allowed to dry for a minimum of 24 hours prior to the final cleaning of the groove and application of the pavement marking material.
Pavement Grooving. Grooving shall not cause ravels, aggregate fractures, spalling or disturbance of the joints to the underlying surface of the pavement. Grooves shall be cut into the pavement prior to the application of the pavement marking material. Grooves shall be cut such that the width is 1 in. (25 mm) greater than the width of the pavement marking line as specified on the plans. Grooves for letters and symbols shall be cut to the shape of the corresponding letters and/or symbols such that the letters and/or symbols shall fit entirely within the recessed shape. Overgrind is expected given the various shapes of letters and/or symbols. However, this overgrind shall be limited to 2 ½ in. (62.5 mm) beyond the interior or exterior perimeters of the proposed marking. The position of the edge of the grooves shall be a minimum of 2 in. (50 mm)
Section 46RS-9 & 1RS-3 & (46)BR-1 from the edge of all longitudinal joints. The depth of the groove shall not be less than the manufacturer’s recommendations for the pavement marking material specified, and according to the following.
(a) Preformed Plastic and Thermoplastic Pavement Markings. Grooving shall be to a minimum depth of 110 mils (2.79 mm) and a maximum depth of 200 mils (5.08 mm).
(b) Paint, Epoxy, Polyurea, and Modified Urethane Pavement Markings. Grooving shall be to a minimum depth of 40 mils (1.02 mm) and a maximum depth of 80 mils (2.03 mm).
The cutting head shall be operated at the appropriate speed in order to prevent undulation of the cutting head and grooving at an inconsistent depth.
At the start of grooving operations, a 50 ft (16.7 m) test section shall be installed and depth measurements shall be made at 10 ft (3.3 m) intervals within the test section. The individual depth measurements shall be within the allowable ranges according to this Article. If it is determined the test section has not been grooved at the appropriate depth or texture, adjustments shall be made to the cutting head and another 50 ft (16.7 m) test section shall be installed and checked. This process shall continue until the test section meets the requirements of this Article.
For new HMA pavements, grooves shall not be installed within 10 days of the placement of the final course of pavement.
Final Cleaning. Immediately prior to the application of the pavement marking material or primer sealer, the groove shall be cleaned with high-pressure air blast.
Method of Measurement. Grooving for lines will be measured for payment in place, in feet (meter) for the groove width specified.
Grooving for letter, numbers and symbols will be measured in square feet (square meters). This measurement to be equal to the corresponding areas for the letters, numbers or symbols shown in TABLE 1 of Article 780.15 of the Standard Specifications.
Basis of Payment. This work will be paid for at the contract unit price per foot (meter) for GROOVING FOR RECESSED PAVEMENT MARKING of the groove width specified, and per square foot (square meter) for GROOVING FOR RECESSED PAVEMENT MARKING, LETTERS
AND SYMBOLS.
HOT-MIX ASPHALT SURFACE REMOVAL
Eff. 10-01-09
This work shall be according to the applicable portions of Section 440 of the Standard Specifications, with the following additional requirements.
The Contractor shall have two options for the machine(s) used for Hot-Mix Asphalt Surface Removal on the through traffic lanes on this job.
1. The machine shall be capable of removing a layer of bituminous material at least the width of the lane of travel and 1-1/2 inches (40 mm) in depth in a single pass.
Section 46RS-9 & 1RS-3 & (46)BR-1
OR
2. Two machines shall be used. Each shall be capable of removing a layer of bituminous material at least one half the width of the lane of travel and 1-1/2 inches (40 mm) in depth in a single pass. If this option for two machines is used, they shall be operated in tandem with no more than 1/8-mile (200 m) separation. If areas of excessive cutting depth appear behind the second machine, then immediate adjustments to the operation of the first machine shall be made to correct the overcutting, and to provide the results shown above.
Any machine used for Hot-Mix Asphalt Surface Removal shall be equipped and operated with electronic grade control referenced to a traveling grade reference device not less than 30 ft. (9 m) in length, and according to Article 1101.16 of the Standard Specifications.
At locations where the milling operation does not fully mill and plane the pavement surface the requirements for checking tolerance with a 16 ft. (5 m) straightedge will not apply. These areas will include locations where the original pavement surface is untouched by the milling teeth. They shall also include areas where the milling teeth lightly touch the pavement, but the area between the cuts is not trimmed by the moldboard.
This work will be measured for payment according to the applicable portions of Article 440.07 of the Standard Specifications. No deduction will be made for areas traversed by the milling machine where the teeth do not touch the pavement surface as long as the work is performed as directed by the Engineer.
This work will be paid for according to the applicable portions of Article 440.08 of the Standard Specifications.
HOT-MIX ASPHALT SURFACE REMOVAL , 2¾”
Between station ranges STA. 1150+79.00 to STA. 1152+43.00, STA. 1152+87.00 to STA.
1154+87.00, and as directed by the Engineer, the roadway shall receive at least the 1 ¼” HMA binder course resurfacing prior to traffic being permitted to drive on the roadway. This work will be considered to be included in the cost of the various resurfacing items and no additional
HOT-MIX ASPHALT SURFACE REMOVAL, SPECIAL
Eff. 06-06-1995 Rev. 01-01-2014
This work shall consist of partial removal of bituminous surfaces from existing entrances, mailbox turnouts, and/or sideroads. The work is intended to aid in matching the incidental hot-mix asphalt resurfacing to the new pavement resurfacing and to the existing entrance, mailbox turnout, or sideroad. The required depth(s) of cut may vary from one location to another, but shall be generally as shown in the plans.
This work shall be done in accordance with the applicable portions of Section 440 and Article
440.04 of the Standard Specifications, and as shown on the plans.
Section 46RS-9 & 1RS-3 & (46)BR-1
This work will be measured in square yards (square meters) of surface area, and will be paid for at the contract unit price per square yard (square meter) for HOT-MIX ASPHALT SURFACE
REMOVAL (SPECIAL).
MAINTENANCE OF ROADWAY DRAINAGE
Eff. 01-01-24
The Contractor shall be responsible for maintaining positive drainage of the traveled way due to uneven pavement lanes and shoulders for the duration of the contract. Maintenance and/or repairs needed shall be performed as directed by the Engineer.
The cost of equipment, labor, and materials involved will not be paid for separately but shall be considered as included in the contract unit price for various pay items involved and no additional
PAVEMENT PATCHING – CLASS D AND PARTIAL DEPTH
Eff. 05-01-2012 Rev. 03-09-2016
Revised Article 442.08(a) of the Standard Specifications to read:
The HMA shall be placed only when the temperature in the shade is at least 40°F (5° C), the forecast is for rising temperature, and the subgrade is not frozen. The HMA shall be placed in lifts based on the HMA mixture specified in the plans and as outlined as follows.
COMPACTED LIFT THICKNESS
Mixture Composition Minimum Thickness, in. (mm)
Maximum Thickness, in. (mm)
IL-9.5, 9.5FG & 9.5L 1 ¼ (32) 3 (75)
IL 19.0 & 19.0L 2 ¼ (57) 4 ½ (114)1/
1/ If a vibratory roller is used the maximum compacted thickness may be increased excluding the top lift, to 6 in. (150 mm), provided the required density is obtained.
Each lift shall be compacted with a mechanical tamper, a vibrating tamper, or a self-propelled roller. Trucks may be used to supplement the tampers or rollers.
To facilitate possible extra compaction and consolidation by traffic, the surface of the completed patch may be finished up to ½ in. (13 mm) above the existing pavement.
Section 46RS-9 & 1RS-3 & (46)BR-1
RAILROAD PROTECTIVE LIABILITY INSURANCE (BDE)
Effective: December 1, 1986 Revised: January 1, 2022
Description. Railroad Protective Liability and Property Damage Liability Insurance shall be carried according to Article 107.11 of the Standard Specifications. A separate policy is required for each railroad unless otherwise noted.
NUMBER & SPEED OF NUMBER & SPEED OF
NAMED INSURED & ADDRESS PASSENGER TRAINS FREIGHT TRAINS
CSX Transportation 0 13 @ 60 MPH 500 Meijer Drive, Suite 305 Florence, KY 41042 859-372-6124
Class 1 RR (Y or N): Y DOT/AAR No.: 353670S RR Mile Post: 99.77 RR Division: Nashville RR Sub-Division: Woodland
For Freight/Passenger Information Contact: Karen Horiszny Phone: 317-670-0287 For Insurance Information Contact: Karen Horiszny Phone: 317-670-0287
Tyler Stroo-President 0 6 @ 40 MPH KBS Railroad 2347 North US Route 52 P.O. Box 119 Iroquois, IL 60945
Class 1 RR (Y or N): N DOT/AAR No.: 372770X RR Mile Post: 102.55 RR Division: Chicago RR Sub-Division: Sixth
For Freight/Passenger Information Contact: Tyler Stroo Phone: 815-486-7260 For Insurance Information Contact: Tyler Stroo Phone: 815-486-7260
Basis of Payment. Providing Railroad Protective Liability and Property Damage Liability Insurance will be paid for at the contract unit price per Lump Sum for RAILROAD PROTECTIVE
LIABILITY INSURANCE.
Section 46RS-9 & 1RS-3 & (46)BR-1
RAISED REFLECTIVE PAVEMENT MARKER REMOVAL
Eff. 10-22-1997 Rev. 09-24-2021
Replace Article 783.03(b) with the following:
“Where removal of raised reflective markers is indicated in the plans, this shall consist of complete removal of the castings, and reflectors from the pavement structure. Where cold milling is not proposed, or where the proposed depth of cold milling is less than 1½ inches (38 mm), the holes resulting from the removal of raised reflective markers shall immediately be cleaned out with compressed air, filled with a bituminous mixture meeting the requirements of Article 1030.11 and/or Materials “M” Specification 120 (Bituminous Premix for Maintenance Use – Proprietary Mixes), and compacted to the satisfaction of the Engineer. This work shall be completed prior to cold milling, or prior to hot-mix asphalt placement if cold milling is not specified.”
Add the following at the end of Article 783.06:
“The payment for RAISED REFLECTIVE PAVEMENT MARKER REMOVAL shall include complete removal and disposal of the castings and reflectors, and furnishing, placing, and compacting the bituminous material in the holes as specified above.”
RECTANGULAR RAPID FLASHING BEACON ASSEMBLY (COMPLETE)
This pay item includes all work to furnish and install the post-mounted Pedestrian Activated Solar Powered Rectangular Rapid Flashing Beacon Assembly (Complete) at the proposed pedestrian crossing locations shown on the plans. This work shall be in accordance with all applicable FHWA and MUTCD guidelines as well as Article 801 of the current Standard Specifications.
Solar Powered Rectangular Rapid Flashing Beacon (RRFB) Assembly The system shall be fully self-contained and power autonomous without the need for an external power supply. All housings and components shall be weather, corrosion, and vandal resistant.
The system shall consist of one sided RRFB units, including a solar array, batteries, wireless communications equipment, controls, push button, brackets and mounting hardware for each traffic signal post installation.
Each RRFB unit shall conform to current FHWA and MUTCD requirements for unit size, mounting location, flash rate, and operational parameters. The units shall be programmable to establish the appropriate duration of the flashing periods upon user activation via the push button. A single activation of either push button shall commence the flashing of each RRFB unit at the pedestrian crossing. The RRFB units shall communicate wirelessly using an unlicensed radio band, so as to simultaneously commence and cease operations appropriately with each push button activation.
Each RRFB unit shall provide a pilot light to the user and the housing shall be black in color.
The solar panels shall be top-of-pole mounted and sized appropriately to support up to 100 activations per day for up to two minutes of flash time (120 seconds) per activation. The batteries shall be sealed, maintenance free, and field replaceable. For the purpose of determining equipment type and size requirements, the location of the assemblies will be as shown in the plans.
Section 46RS-9 & 1RS-3 & (46)BR-1
The push buttons shall conform to Section 876 of the current Standard Specifications. In determining the usage of the “Yellow lights are flashing” message, the option of using the speech message shall be programmable by the end user. The push button housings shall be black in color.
All components of the RRFB assembly shall have a minimum three-year manufacturer’s warranty.
Traffic Signal Post This work shall be in accordance with Article 875 of the current Standard Specifications. The Type A foundations shall be adjacent to the accessible ramp to provide accessibility to the push button locations. Refer to State Standard 878001 for Type A foundation for Ground Mounted Controller Cabinet. The Traffic signal post and base shall be black powder coat over galvanized steel.
This work shall be paid for at the contract unit price each for RECTANGULAR RAPID FLASHING BEACON ASSEMBLY (COMPLETE), which shall be payment in full for furnishing all parts and installation of the entire solar assembly system, including the traffic signal poles and foundations.
No additional compensation will be allowed.
REMOVAL AND DISPOSAL OF REGULATED SUBSTANCES
Description. This work shall consist of the removal and disposal of regulated substances according to Section 669 of the Standard Specifications as revised below.
Contract Specific Work Areas. For stationing, the lateral distance is measured from the centerline, and the farthest distance is the offset distance or construction limit, whichever is less.
The following contract-specific work areas shall be monitored by the Environmental Firm for soil contamination and workers' protection.
ISGS Site No. 4545-12 – Plaza Commons, 715 W. Elm Street, Hoopeston, Vermilion County, Illinois
• Station 1121+10 to Station 1121+18 (CL IL 9) from 0 to 60 feet LT. The Engineer has determined this material from 0 to 2 feet bgs in the vicinity of the station has been risk managed and will require risk management as non-special waste in accordance with Article 669.05(a)(5). Contaminants of concern sampling parameters include: VOCs, SVOCs and Metals.
ISGS Site No. 4545-41 – Vacant Lot, 200 block of W. Orange Street, Hoopeston, Vermilion County, Illinois
• Station 1144+95 to Station 1145+04 (CL IL 9) from 0 to 33 feet RT.