St. George Crossing Subdivision Project (PE24218)
Closed State & local contract opportunity Posted
- Solicitation number
- PE-61750-NONST-2027-000000018
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- UNSPSC codes
- 72121505 Waste water and sewage treatment plant construction service
- 95121810 Irrigation and flood control waterworks
- 72103305 Drain laying service
- 72141120 Sewer line construction service
- 72121504 Waste disposal plant construction service
- 72141121 Water main construction service
- 72141125 Pumping station construction service
- 95121805 Well
- 95121804 Water tower
- 72141123 Manhole construction service
- Point of contact
-
- Lindsey Bashlor lindsey@parker-engineering.com (912) 764-7722
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The City of Waynesboro, Georgia is requesting sealed bids for construction of the St. George Crossing Subdivision Project (PE24218), with bids due September 17, 2026 at 3:00 p.m. at Waynesboro City Hall. This is a Section 3 covered contract; Section 3 Business Concerns are encouraged to apply. The project is subject to the Build America, Buy America Act, requiring all iron, steel, manufactured products, and construction materials to be produced in the United States.
The scope encompasses water, sewer, storm drainage, paving, and sidewalk construction. Water improvements include 3,680 linear feet of 8-inch ductile iron watermain, 600 linear feet of 2-inch watermain, 11 fire hydrants, and laterals. Sewer work consists of 4,133 linear feet of 8-inch sewer main, 1,830 linear feet of 4-inch sewer lateral, 23 manhole installations, and 61 cleanouts. Storm improvements include 2,395 linear feet of 18-inch high-pressure storm pipe, 871 linear feet of 24-inch high-pressure storm pipe, 248 linear feet of 30-inch high-pressure storm pipe, H.B. traps, grate inlets, weir inlets, and rip-rap. Additional work includes concrete sidewalk, granite aggregate base, asphalt paving, curb and gutter, erosion controls, and grading. The contractor must hold a valid Georgia State Utility Contractor license and employ a Utility Manager certification holder. The contract period is 240 calendar days for completion.
Funding is provided by the OneGeorgia Authority's Rural Workforce Housing Initiative, administered by the Georgia Department of Community Affairs. Bids must be accompanied by a bid bond or certified cashier's check in an amount not less than 10% of the base bid; the surety company must hold an "A" minimum rating and financial strength of at least five times the contract price. Performance and Payment Bonds, each equal to 100% of the contract price, will be required of the successful bidder. No bid may be withdrawn for 60 days after the bid closing date. Contract documents are available from Parker Engineering, LLC for a non-refundable fee of $150.00 per full-size set.
Opportunity text
Sealed bids for construction of the St. George Crossing Subdivision Project will be received until September 17th, 2026 at 3:00 PM at the City of Waynesboro City Hall at 615 North Liberty Street, Waynesboro, Georgia 30330 at which time and place they will be publicly opened and read. Any bid received after said time & date will not be considered by the Owner. No bid may be withdrawn after the closing time for the receipt of bids for a period of 60 days. The work shall consist of furnishing all products & equipment & performing all labor necessary for water, sewer, drainage, paving, & sidewalk construction including: 3680 LF 8¿ ductile iron watermain, 600 LF of 2¿ watermain, 11 fire hydrants, shortside and longside laterals, 23 EA manhole installations, 4133 LF 8¿ sewer main, 1830 LF 4¿ sewer lateral, 61 EA cleanouts, 2395 LF 18¿ HP storm pipe, 871 LF 24¿ HP storm pipe, 248 LF 30¿ HP storm pipe, H.B. traps, grate inlets, weir inlets, rip-rap, 4¿ concrete sidewalk, 6¿ concrete, 6¿ GAB, asphalt paving, 18¿ curb and gutter, 6¿ curb, erosion controls, & grading complete. Time allotted for completion of work is 240 calendar days. The Scope of Work as described herein is defined as ¿utility contracting¿ so the Contractor performing the work must provide proof of a valid license. Bids shall be accompanied by a bid bond or certified cashier¿s check in an amount not less than 10% of the base bid. Funding is to be provided by the OneGeorgia Authority¿s Rural Workforce Housing Initiative which is administered by DCA. This agreement is for services related to a project that is subject to BABAA. This project is a Section 3 covered contract. Section 3 Businesses are encouraged to apply. Plans & Specifications are on file at Parker Engineering. Copies may be obtained from Parker Engineering, LLC., 36 Courtland Street, Suite B, Statesboro, Georgia 30458, Phone: (912) 764-7722, email: lindsey@parker-engineering.com, upon payment of $150.00 for each full-size set (non-refundable).
Files
| File | Type | Posted |
|---|---|---|
| 00100_Advertisement to Bid_St George.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity