This is an Advertisement for Bids issued by the City of Waynesboro, Georgia for the St. George Crossing Subdivision Project. Sealed bids will be received until September 17th, 2026 at 3:00 PM at City Hall located at 615 North Liberty Street, Waynesboro, Georgia 30330, with public opening and reading of bids to follow immediately. The project encompasses water, sewer, storm drainage, paving, and sidewalk construction improvements. Water improvements include approximately 3,680 linear feet of 8-inch ductile iron watermain, 600 linear feet of 2-inch watermain, 11 fire hydrants, 40 shortside laterals, and 21 longside laterals. Sewer improvements consist of 23 manhole installations at various depths, 4,133 linear feet of 8-inch sewer main, 1,830 linear feet of 4-inch sewer lateral, and 61 cleanouts. Storm improvements include 2,395 linear feet of 18-inch high-pressure storm pipe, 871 linear feet of 24-inch high-pressure storm pipe, and 248 linear feet of 30-inch high-pressure storm pipe, along with H.B. traps, grate inlets, weir inlets, and rip-rap. Miscellaneous improvements include 4-inch concrete sidewalk, 6-inch concrete, 6-inch granite aggregate base, asphalt paving, 18-inch and 6-inch curb and gutter, erosion controls, and grading. The contract period is 240 calendar days for completion, and no bid may be withdrawn for 60 days after the bid closing date.
Contractors must provide proof of a valid Georgia State Utility Contractor license and employ a Utility Manager certification holder to oversee all work. Bids must be accompanied by a bid bond or certified cashier's check equal to no less than 10 percent of the base bid, with the surety company holding an "A" minimum rating and financial strength of at least five times the contract price. Performance and Payment Bonds, each equal to 100 percent of the contract price, will be required of the successful bidder. Contract documents are available from Parker Engineering, LLC at 36 Courtland Street, Suite B, Statesboro, Georgia 30458 for a non-refundable fee of $150.00 per full-size set. Funding is provided by the OneGeorgia Authority's Rural Workforce Housing Initiative, administered by the Georgia Department of Community Affairs, and supplemented by the City of Waynesboro. The project is subject to Build America, Buy America Act requirements mandating that all iron, steel, manufactured products, and construction materials be produced in the United States. The project is a Section 3 covered contract, and Section 3 Business Concerns are encouraged to apply. All bidders must comply with 41 CFR 60-4 regarding affirmative action and equal opportunity. Contractors must comply with E-Verify regulations.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Waynesboro – St. George Crossing Subdivision Contract Documents & Technical Specifications
Parker Engineering, Inc. 00100-1 Proj. No. PE24218
SECTION 00100
ADVERTISEMENT FOR BIDS
PART 1. GENERAL
1.1 SEALED BIDS
Sealed bids for construction of the St. George Crossing Subdivision Project will be received until September 17th, 2026 at 3:00 PM at the City of Waynesboro City Hall at 615 North Liberty Street, Waynesboro, Georgia 30330 at which time and place they will be publicly opened and read. Any bid received after said time and date will not be considered by the Owner. No bid may be withdrawn after the closing time for the receipt of bids for a period of sixty (60) days.
1.2 SCOPE OF WORK
The work shall consist of furnishing all products and equipment and performing all labor necessary to perform the following:
Project shall consist of water improvements including, but not limited to, approximately 3,680 LF 8” ductile iron watermain, 600 LF of 2” watermain, 11 fire hydrants, 40 shortside laterals, and 21 longside laterals, and miscellaneous improvements.
Project shall consist of sewer improvements including, but not limited to, approximately 23 EA manhole installations (various depths), 4,133 LF 8” sewer main, 1,830 LF 4” sewer lateral, 61 EA cleanouts and miscellaneous improvements.
Project shall consist of storm improvements including, but not limited to, 2,395 LF 18” HP storm pipe, 871 LF 24” HP storm pipe, 248 LF 30” HP storm pipe, H.B. traps, grate inlets, weir inlets, rip-rap, and miscellaneous improvements.
Project shall consist of miscellaneous improvements including, but not limited to, 4” concrete sidewalk, 6” concrete, 6” GAB, asphalt paving, 18” curb and gutter, 6” curb, erosion controls, and grading complete.
Time allotted for completion of work is two hundred forty (240) calendar days. All Work shall be completed in accordance with the plans and specifications.
1.3 CONTRACTOR LICENSE
The Scope of Work as described herein is defined as “utility contracting” in accordance with O.C.G.A 43-14-2(17) so the Contractor performing the work must provide proof of a valid license by the State of Georgia as a “Utility Contractor” and must also employ a “Utility Manager” certification holder who will have oversight of all the work. See Instruction to Bidders for additional bidding requirements.
Parker Engineering, Inc. 00100-2
1.4 PLANS, SPECIFICATIONS AND CONTRACT DOCUMENTS
Plans, Specifications and Contract Documents are on file at Parker Engineering, LLC.
Copies may be obtained from Parker Engineering, LLC., 36 Courtland Street, Suite B, Statesboro, Georgia 30458, Phone: (912) 764-7722, email: lindsey@parker-engineering.com, upon payment of $150.00 for each full-size set (non-refundable).
1.5 BONDS
Bids shall be accompanied by a bid bond or certified cashier’s check in an amount not less than 10% of the base bid. All bonds shall be by a surety company licensed in Georgia with an “A” minimum rating of performance and a financial strength of at least five (5) times the contract price as listed in the most current publication of “Best’s Key Rating Guide Property Liability”. Performance and Payment Bonds, each in an amount equal to 100% of the contract price shall be required of the successful bidder if contract is awarded. Each Bond shall be accompanied by a “Power of Attorney” authorizing the attorney-in-fact to bind the surety and certified to include the date of the bond.
1.6 FUNDING SOURCES
Funding is to be provided by the OneGeorgia Authority’s Rural Workforce Housing Initiative which is administered by the Georgia Department of Community Affairs. Funding is also provided by the City of Waynesboro. All Bidders must comply with 41 CFR 60-4, in regard to affirmative action, to ensure equal opportunity to females and minorities and will apply the timetables and goals set forth in 41 CFR 60-4, as applicable to the area of the project.
This project is a Section 3 covered contract. Section 3 Business Concerns are encouraged to apply.
1.7 BUILD AMERICA, BUY AMERICA BID REQUIREMENTS
This agreement is for services related to a project that is subject to the Build America, Buy America Act (BABAA) requirements under Title IX of the Infrastructure Investment and Jobs Act (“IIJA”), Pub. L. 177-58. Absent an approved waiver, all iron, steel, manufactured products, and construction materials used in this project must be produced in the United States, as further outlined by the Office of Management and Budget’s Memorandum M-22-11, Initial Implementation Guidance on Application of Buy America Preference in Federal Financial Assistance Programs for Infrastructure, April 18, 2022.
1.8 RESERVATION OF RIGHTS
Owner reserves the right to reject any or all Bids and to waive informalities, including without limitation, the rights to reject any or all nonconforming, non-responsive, unbalanced or conditional Bids and to reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the Owner.
Parker Engineering, Inc. 00100-3
1.9 E-VERIFY
Contractor shall comply with E-Verify regulations.
CITY OF WAYNESBORO
OWNER
END OF SECTION