About this opportunity
Morris County Park Commission is requesting sealed bids from licensed contractors with spray foam insulation certification for closed cell spray foam insulation installation at the Great Swamp Outdoor Education Center, 247 Southern Boulevard, Chatham, with bids due October 14, 2026 at 9:00 a.m. Spray foam insulation certification is a mandatory eligibility requirement — only certified contractors may bid.
The scope includes removal of existing fiberglass batt insulation from basement underfloor and attic areas; application of closed cell spray foam to basement floor joist cavities and attic rafter and gable end walls to achieve minimum R-Value of R-30 for basement areas and R-49 for attic assemblies; application of approved ignition barriers unless the spray foam product itself carries Class 1 flame spread documentation; protection of existing mechanical equipment (refrigerant lines, electrical lines, ductwork, piping) during removal and application; and final cleanup and removal of protective coverings. The contractor must dispose of removed insulation in contractor-provided dumpsters or vehicles and is responsible for all costs of repairs or replacements if equipment is damaged during work. No subcontracting is permitted.
Bidders must submit one original, one copy, and one electronic bid copy accompanied by a bid guarantee equal to ten percent of the total bid price (not to exceed $20,000) in the form of a certified check, cashier's check, or bid bond from a New Jersey-authorized surety. The successful bidder must provide a performance bond equal to one hundred percent of the contract amount and obtain a Public Works Contractor Registration Certificate prior to bid submission, as this is a public works project subject to New Jersey prevailing wage requirements. The contract term is fifteen calendar days from notice to proceed. All work must occur during regular business hours, Monday through Friday, 8:00 a.m. to 4:30 p.m., with no work on park commission holidays. A non-mandatory pre-bid meeting is scheduled for September 30, 2026 at 10:00 a.m. at the project site. Questions are due October 1, 2026 at 4:00 p.m., with responses provided by October 2. Bidders must provide spray foam product specifications, manufacturer approval documentation, contractor license and certification, and three references for similar work.
Opportunity text
The Morris County Park Commission (MCPC) requests bids ONLY from Licensed Contractors with Spray Foam Insulation Certification to apply Closed Cell Spray Foam Insulation to all existing basement floor joist cavities, attic rafter cavities and gable end attic walls at the Great Swamp Education Center located at 247 Southern Blvd. The contractor shall remove all existing fiberglass batt insulation from the entire basement underfloor area and attic assembly leaving the area clean and free of any debris from such removal and dispose of properly in contractor provided dumpsters or refuse removal vehicle The contractor shall cover any equipment installed in these areas to protect such equipment from dust and or debris created by insulation removal and overspray during spray foam applied application. The attic assembly in this structure houses mechanical equipment including various refrigerant lines, electrical lines, ductwork and piping. The contractor must take precautions not to disturb, break or alter any of these items. Should the contractor damage any of the equipment, the contractor shall be responsible for any and all costs of repairs and or replacements The contractor shall provide closed cell spray foam insulation to a product thickness that provides the minimum R-Value required by code, R-30 minimum for the basement floor joist cavities and R-49 for the attic roof rafter assembly. The contractor shall apply an approved ignition barrier to the face of all exposed closed cell spray foam applied insulation in both the basement and attic assemblies, unless the closed cell spray foam itself contains documentation that it provides a Class 1 flame spread rating. Once the spray foam insulation application is complete, the contractor shall remove any coverings that protected equipment and remove any residual dust and or overspray leaving equipment clean and operational. For closeout of the project the contractor shall provide documentation of spray foam thickness installed and R Value provided per thickness. Manufacturers warranty and product specifications shall also be provided in closeout documentation package
Files
| File | Type | Posted |
|---|---|---|
| morris county park Exempt Services.pdf |