Specifications for inspection of electric distribution poles
Awarded State & local contract opportunity
- Solicitation number
- FKEC BID #26-12
- State
- Florida
- Responses due
Opportunity facts
- NIGP codes
- UNSPSC codes
- 72151502 Electric power system construction service
- 81102402 High voltage overhead line maintenance and repair
- 72151506 Switchgear and related devices installation service
- 72151503 Cogeneration plant construction service
- 81102401 High voltage overhead line construction
- 72141122 Electric power line construction service
- 72151504 Computer power conditioning service
- 72151505 Standby or emergency power installation service
- Point of contact
-
- Adam Pierce procurement@fkec.com (305) 852-2431
Updated .
About this opportunity
Florida Keys Electric Cooperative Association (FKEC) is soliciting bids for a seven-year inspection program of its electric distribution pole system comprising approximately 15,322 poles, with bids due July 30, 2026 at 2:00 p.m. and intent to award by August 17, 2026. Written questions are due July 23, 2026 at 2:00 p.m. This is a compliance-driven scope: all work must satisfy Florida Public Service Commission Rule 25-18.020 (mandating pole inspections at least every eight years) and National Electrical Safety Code (NESC) standards.
The scope encompasses visual inspections, non-destructive testing, sounding, excavation, and treatment of wood (10,801), concrete (2,735), ductile iron (1,442), steel (335), fiberglass (6), and hybrid (3) poles in substantially equal annual increments from 2027 through 2033. Work is performed across the Upper and Middle Florida Keys. Contractors must hold valid Florida business licenses, required operating permits, and OSHA 29 CFR 1910.269 certification for field personnel; demonstrate substantial experience in pole inspections; and implement documented safety programs compliant with OSHA and NFPA 70E requirements.
Pricing uses unit-rate methodology for line items including visual-only inspections, wood pole testing, excavation, treatment, aerial and drone inspections, labeling, and identification of third-party attachment owners. All pricing must remain valid for the contract duration and be designated as a Total Not To Exceed Price; FKEC retains the right to withhold 10% of projected costs if the contractor exceeds the scheduled completion date, with withheld funds released only upon FKEC's satisfaction that all deliverables are met following delay resolution.
The evaluation committee weights qualifications of the firm and staff at 40 points, relevant past performance at 20 points, and cost proposal at 40 points. Contractors intending to subcontract must take affirmative steps to solicit small and minority businesses and women-owned business enterprises. FKEC reserves the right to award to multiple respondents and to cancel the solicitation at any time. Project completion is due December 31, 2033.
Opportunity text
This Statement of Work (SOW) establishes the scope, inspection methodology, and seven-year work plan for the inspection of distribution poles in the Florida Keys Electric Cooperative (FKEC) system. The intent of this program is to inspect the system in substantially equal annual increments over a seven-year period while satisfying applicable Florida Public Service Commission requirements, National Electrical Safety Code (NESC) standards, and the additional inspection criteria specified by FKEC. Florida PSC Rule 25-18.020 requires pole inspections at least every eight years and visual checks for compliance with NESC strength and clearance standards. Please see Bid Package for complete details.
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity