Southeast Regional Water Treatment Plant Ozone Sidestream System Safety Modification Phase II
Closed State & local contract opportunity
- Solicitation number
- CC-4753-23/HSM
- State
- Florida
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 15010 Construction Materials (Not Otherwise Classified)
- 67053 Pipeline Equipment And Tools (For Construction And Laying Of The Pipeline)
- 67084 Venturi Tubes, Air And Vacuum
- 72058 Recovery Pumps And Piping (Free Product, Groundwater, Etc.)
- 91340 Construction, Pipeline
- 92596 Waste Water Treatment Engineering
- 95895 Utility Management Services
- 96185 Utility Services, Water
- UNSPSC codes
- 30102225 Cork plate
- 30191801 Structural formwork
- 30191802 Structural formwork accessory
- 30111510 Pipeline protection concrete mattress
- 41112506 Venturis
- 83100000 Utilities
- 40175401 Pipe stoppers
- 78101718 Offshore supply vessel service
- 83101601 Supply of natural gas
- 83101603 Oil pipeline services
Show all 46
- 83101802 Supply of two phase electricity
- 83101803 Supply of three phase electricity
- 30191800 Temporary construction and maintenance support equipment and materials
- 30191616 Construction safety net
- 30191617 Construction safety shelf
- 30191805 Structural deck plate
- 40175400 Pipe support
- 20121459 Wireline entry guide
- 20123206 Swellable packer
- 20143305 Pig signalers
- 40175402 Pipeline launch/receive traps
- 40175403 Quick opening closures
- 40175404 Pipeline support bags
- 40175405 Spring hanger
- 40175406 Pipe support hangers
- 40175408 Pipeline inflatable spheres
- 83101500 Water and sewer utilities
- 83101600 Oil and gas utilities
- 83101510 Chilled water
- 83101602 Supply of fuel oil
- 83101605 Gas facility charge
- 83101804 Electric power transmission services
- 83101805 Industrial electric power distribution
- 83101806 Rural electrical power distribution
- 83101807 Municipal electric power distribution
- 30191804 Temporary roadway lining plate
- 30191803 Structural spacer
- 20143304 Intelligent pigs
- 40175407 Pipeline spheres
- 72141124 Pipe laying service
- 95121640 Pipeline
- 81102400 Electrical power transmission engineering
- 83101800 Electric utilities
- 70171607 Water pricing services
- 83101604 Gas pipeline services
- 83101801 Supply of single phase electricity
- Point of contact
-
- Herronda Mortimer hmortimer@seminolecountyfl.gov (407) 665-7113
Opportunity details come from procurement.opengov.com. Updated .
About this opportunity
Seminole County Environmental Services Department is seeking a qualified and licensed contractor to perform the Southeast Regional Water Treatment Plant Ozone Sidestream System Safety Modification Phase II project (Contract #CC-4753-23/HSM). The primary objective is to improve the ozone side-stream injection system by eliminating the potential for ozone gas accumulation in cast iron pumps and ductile iron water piping, which could cause major damage. Key deliverables include installing three new electric valve actuators, modifying stainless steel ozone sidestream piping, and salvaging two existing butterfly valves and electric valve actuators. The project requires contractors to perform at least 15% of the total work within their own organization and will involve complex automation requirements, including integrating valve actuators into the existing plant SCADA system. A pre-proposal non-mandatory meeting was held on December 15, 2022, with the deadline for questions set for January 1, 2023, and bid responses due on January 11, 2023, at 3:00 pm. Bids must be submitted electronically through the county's procurement website, with all responses to be reviewed via a Zoom meeting.
Minority and Women-owned Business Enterprises (M/WBEs) are explicitly encouraged to participate in the bidding process. The project requires specific insurance coverage, including $1,000,000 in commercial general liability, workers' compensation, and business auto policy coverage. Contractors must comply with various state and federal regulations, including E-Verify requirements, public entity crime statutes, and drug-free workplace policies. The contract duration is 210 calendar days, with 180 days from Notice to Proceed to Substantial Completion and 30 days for Final Completion. Liquidated damages are set at $500 per day for project delays, and all construction progress payments will be subject to a 5% retainage. The engineer's estimated project cost is $92,000, with work to be performed at the Southeast Regional Water Treatment Plant located at 3300 Dike Road in Winter Park, Florida. Potential bidders are cautioned against contacting any Seminole County staff or officials other than the specified contact person.
Opportunity text
Seminole County Board of County Commissioners
Invitation for Bid
Project: CC-4753-23/HSM - Southeast Regional Water Treatment Plant Ozone Sidestream System Safety Modification Phase II
Scope of Work: Seminole County Environmental Services Department (SCESD) is seeking a qualified and licensed contractor to provided improved ozone side-stream injection system to eliminate the potential of ozone gas accumulating in the cast iron pumps and ductile iron water piping. This would cause major damage to the pumps and piping
The Engineer's estimate for the project is $92,000
Ordering Instructions: Bid documents are available on the Seminole County Website https://secure.procurenow.com/portal/seminolefl
- Scroll and Click on Search Solicitations
- View all current (active) solicitations
M/WBEs are encouraged to participate in the process.
NOTE: ALL PROSPECTIVE BIDDERS ARE HEREBY CAUTIONED NOT TO CONTACT ANY MEMBER OF THE SEMINOLE COUNTY STAFF OR OFFICIALS OTHER THAN THE SPECIFIED CONTACT PERSON.
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity