South Cross Bayou Electrical Switchgear Replacement (TPA & TPB) PID 004906A
Closed State & local contract opportunity
- Solicitation number
- 26-0401-ITB-C
- State
- Florida
- Responses due
Opportunity facts
- Jurisdictions
- NIGP codes
- UNSPSC codes
- 95121642 Sewage pumping station
- 72151522 Electrical luminary service
- 26131808 Substation load control switchgears
- 26131811 Current limiting reactors
- 26131812 Gas insulated switchgears
- 39121115 Medium voltage switchgear
- 95121643 Sewage outfall
- 39121000 Power conditioning equipment
- 39121023 Static var compensators
- 39121024 Synchronous condensers
- Point of contact
-
- Michelle Jurek mjurek@pinellas.gov (727) 464-4382
Opportunity details come from procurement.opengov.com. Updated .
About this opportunity
Pinellas County is soliciting bids for electrical switchgear replacement at the South Cross Bayou Advanced Wastewater Reclamation Facility, with proposals due August 25, 2026. An SBE set-aside applies; the SBE_Memo.pdf and SBE_Compliance_Form.pdf are attached.
The scope comprises removal and replacement of two 3200-ampere drawout generator circuit breakers and four 1600-ampere drawout feeder circuit breakers in a 277/480-volt, three-phase, four-wire switchgear line-up with a 6000-ampere main bus rating. The switchgear cells shall be reconditioned and modified as required for new installations. The work includes removal and replacement of back panels and doors in a free-standing, floor-mounted generator/engine master control cabinet and all control components within it, plus replacement of doors, back panels, and control components for Generator 3-1 and Generator 3-2 controls within the switchgear line-up. The scope also covers removal and replacement of two switchboard line-ups (TPA and TPB), each with utility and generator circuit breakers, group-mounted devices, and an automatic failover system. All equipment, materials, and work must render complete, fully tested, operational systems.
Place of performance is the Pinellas County South Cross Bayou AWRF. Technical Specifications (5 megabytes, updated August 10) and Final Plans (5 megabytes, August 10) are posted. Qualification submittal forms are required; two versions are available — one for FDOT-related work and one for non-FDOT work. Performance and payment bonds are required. Addendum #1 (Revision) was posted August 10, 2026. An Engineers Estimate and LD Calculator are available for reference.
Opportunity text
The work to be performed under these Contract Documents consists of the removal and replacement of two (2) 3200 ampere drawout generator circuit breakers and four (4) 1600 ampere drawout feeder circuit breakers in a 277/480 volt, 3-phase, 4-wire switchgear line-up, with a 6000 ampere main bus rating. The switchgear line-up and circuit breaker cells shall be reconditioned and modified, as required, for the new circuit breaker installations. The work shall also include the removal and replacement of the back panel and door in the free-standing, floor-mounted, generator/engine master control cabinet and the control components contained within this cabinet. Additionally, the doors, back panels and control components for the generator controls for Generator 3-1 and Generator 3-2, that are part of the switchgear line-up, shall be replaced. In conjunction with the work associated with the switchgear line-up described, the work requires the removal and replacement of two (2) switchboard line-ups (TPA and TPB), each including a utility circuit breaker, a generator circuit breaker, group-mounted devices and an automatic failover system. The installation work is located at the Pinellas County South Cross Bayou AWRF. The work shall be inclusive of all equipment, materials and work required for operational systems that are complete and fully tested.
Files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity