This is a Permits Appendix for the South Cross Bayou Electrical Switchgear Replacement project, a capital improvement initiative by Pinellas County, Florida. The project involves the removal and replacement of electrical switchgear components at the South Cross Bayou Advanced Wastewater Reclamation Facility (AWRF), including two 3200-ampere drawout generator circuit breakers, four 1600-ampere drawout feeder circuit breakers, and associated control components within a 277/480-volt, three-phase, four-wire switchgear system rated at 6000 amperes on the main bus. The scope encompasses reconditioned and modified switchgear cells, replacement of back panels and doors in a free-standing floor-mounted generator/engine master control cabinet, and replacement of two switchboard line-ups (TPA and TPB) with utility and generator circuit breakers, group-mounted devices, and automatic failover systems. Proposals were due August 25, 2026, with Technical Specifications and Final Plans updated as of August 10, 2026, and Addendum #1 posted on the same date. All work must result in complete, fully tested, and operational systems.
The permits appendix identifies that no applicable permits or permit fees are required for this project as of the documentation date. An SBE (Small Business Enterprise) set-aside applies to this solicitation, with supporting compliance documentation required from bidders. Performance and payment bonds are mandatory. Qualification submittal forms are available in two versions—one for FDOT-related work and one for non-FDOT work—to accommodate different bidder categories. An Engineers Estimate and LD Calculator have been provided as reference materials for bid preparation purposes.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX 1 - PERMITS
Project Name:
SOUTH CROSS BAYOU ELECTRICAL SWITCHGEAR
REPLACEMENT (TPA &TPB)
PID 004906A
PERMIT INDEX
AGENCY PERMIT No. PERMIT FEE / OTHER
Not Applicable