Slick Rock Substation Construction
Closed State & local contract opportunity Posted
- Solicitation number
- 26-283
- State
- Utah
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Jay Sandberg jay.sandberg@sgcity.org (435) 673-4006
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The City of St. George is requesting bids for construction of the Slick Rock Substation under IFB Reference #26-283, with bids due June 5, 2026, at 2:00 p.m. MDT and a mandatory pre-bid meeting on May 18, 2026, from 11:00 a.m. to 12:00 p.m. MDT.
The scope includes site preparation and excavation, grading, structural fill material (700 cubic yards), six concrete foundations in three types (totaling 12 units), 34 concrete piers across three categories, transformer containment pads, two chain link gates (8 feet high by 20 feet wide), one man gate (8 feet high by 4 feet wide), 681 linear feet of precast concrete decorative perimeter wall, a control building, access improvements, and site restoration in accordance with project drawings and specifications. The bid schedule requires line-item unit pricing and total costs for all work.
Award will be made to the lowest responsible bidder using criteria contained in City ordinances. Each bid must include a 5% bid bond naming the City of St. George as obligee, issued by a surety company licensed in Utah, plus a completed bid schedule with unit prices, and a list of major subcontractors. One hundred percent payment and performance bonds are required upon contract execution. Optional supporting documents include a certificate of insurance if not already on file in vendor registration and E-Verify certification of legal work status if not previously submitted.
Questions are due May 29, 2026, at 2:00 p.m. MDT. The City reserves the right to reject any or all proposals or waive any formality or technicality in the interest of the City.
Opportunity text
The City of St George is requesting bids for the construction of the Slick Rock Substation. Project involves site preparation and construction of concrete foundations, transformer containment pads, a control building, access gates, and a precast perimeter wall. The contractor is responsible for all excavation, grading, material installation, and site restoration in accordance with project drawings and specifications.
Files
| File | Type | Posted |
|---|---|---|
| biddoc.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity