Sewer Cleanout Deletion in the Sun Spot Neighborhood
Closed State & local contract opportunity Posted
- Solicitation number
- 25-08
- State
- Colorado
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 065 Automotive And Trailer Bodies, Body Accessories, And Parts
- 210 Concrete And Metal Products, Culverts, Pilings, Septic Tanks, Accessories And Supplies
- 670 Plumbing Equipment, Fixtures, And Supplies
- 890 Water Supply, Groundwater, Sewage Treatment, And Related Equipment, Not For Air Conditioning, Steam Boiler, Or Laboratory Reagent Water
- 910 Building Maintenance, Installation And Repair Services
- 913 Construction Services, Heavy, Including Maintenance And Repair Services
- UNSPSC codes
- 25180000 Vehicle bodies and trailers
- 31250000 Pneumatic and hydraulic and electric control systems
- 31180000 Packings glands boots and covers
- 40140000 Fluid and gas distribution
- 40141660 Electronic gas ball valve
- 30121722 PE rainwater and sewer separation walls
- 72000000 Building and Facility Construction and Maintenance Services
- 76000000 Industrial Cleaning Services
- 72140000 Heavy construction services
Opportunity details come from bidnetdirect.com. Updated .
About this opportunity
The City of Gunnison is seeking qualified contractors to execute the Sewer Cleanout Deletion project in the Sun Spot neighborhood, located in Colorado's Grand County. This procurement is a single lump sum contract for removing 11 sewer service line cleanouts to improve infrastructure functionality and address inflow and infiltration (I&I) concerns. The project requires comprehensive services including excavation, cleanout removal, line repair, site restoration, traffic and safety management, and detailed documentation reporting. Bids must be submitted electronically through the Rocky Mountain E-Purchasing System (RMEPS) by March 20, 2025, at 2:00 PM Mountain Time, with a 60-day bid acceptance period. Bidders must provide complete bid form sections, demonstrate business authorization in Colorado, and acknowledge potential addenda. The project is scheduled for completion in April 2025, with substantial completion targeted for April 25, 2025, and final payment preparation by April 30, 2025. The City will award the contract to the lowest responsive bidder and reserves the right to reject any or all submissions.
The solicitation does not specify explicit set-aside designations or restrictions for disadvantaged business enterprises. Contractors must be qualified to perform complex sewer infrastructure modification work, with specific capabilities in excavation, line repair, and site restoration. While no incumbent vendors are mentioned, the city will provide pipes, fittings, and a community communication plan as part of the project support. The contract includes potential liquidated damages of $2,500 per day for delays beyond specified completion dates, and progress payments will be made monthly with 95% of completed work value retained until substantial completion. Though the exact contract value is not specified in the documents, the project involves precise technical work across 11 service line locations with varying site conditions, including fence removal and work in winter terrain. The City of Gunnison is exempt from Colorado state sales and use taxes on materials and equipment to be incorporated into the work, which may provide some cost advantages for the winning bidder.
Opportunity text
The City of Gunnison is requesting bids from qualified contractors to delete sewer cleanouts on 11 (eleven) sewer service lines in the Sun Spot neighborhood. The cleanouts are no longer needed and must be removed to improve service line functionality, reduce maintenance issues, and address inflow and infiltration (I & I) concerns. Inflow and infiltration, caused by stormwater and groundwater entering the sewer system through unnecessary openings such as cleanouts, can lead to capacity issues, increased treatment costs, and system inefficiencies. By removing these cleanouts and restoring the service lines, this project aims to enhance the overall performance and reliability of the City's sewer infrastructure. The project is expected to be completed in April 2025 to minimize disruptions and align with the City's operational schedule.
Files
| File | Type | Posted |
|---|---|---|
| 25-08 RFB Documents.pdf | ||
| Project Map _ Photos.pdf | ||
| C-520 Agreement 25-08.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity