Sandy River Force Main River Crossing Project - Progressive Design-Build

Open State & local contract opportunity Posted

Solicitation number
2026-80
State
Oregon
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

Clackamas Water Environment Services (WES), a district under Clackamas County, Oregon, is soliciting progressive design-build proposals for the Sandy River Force Main River Crossing Project, with proposals due December 3, 2026 at 2:00 PM local time. No set-asides are designated for small businesses, disadvantaged business enterprises, or other protected classes.

The project replaces an 8-inch force main crossing beneath the Sandy River that was exposed and damaged during December 2025 storm events. Scope includes design and construction of a new crossing, evaluation and selection of the optimal alignment and trenchless crossing method, abandonment or removal of the existing crossing, modifications to the Sandy River Lane and/or Timberline Rim pump station connections as required, removal of interim stabilization measures, and testing, commissioning, and startup. Delivery is two-phase: Phase 1 produces a 60% design and Guaranteed Maximum Price proposal, and Phase 2 covers final design, construction, commissioning, and startup.

Selected design-builders must demonstrate financial stability, hold Oregon licensing, provide design-build payment and performance bonds of at least $3 million, and have completed at least one prior progressive design-build project in which the designer and builder worked together. Average Experience Modification Rate must not exceed 1.0. WES anticipates pursuing federal funding for all or a portion of the project and may require compliance with Davis-Bacon Act, Build America Buy America, American Iron and Steel, and other federal labor standards and reporting.

Price accounts for 10 of 100 evaluation points. Proposers submit Phase 1 and Phase 2 lump-sum design and pre-construction fees, fixed percentage fees for overhead and profit, general conditions fees, and a resource-loaded staffing plan. Interviews are estimated for the first week of January 2027, with design-builder selection estimated for the second week of January 2027. Substantial completion is scheduled for October 31, 2027, and final completion for December 31, 2027.

Opportunity text

Project Scope: The Sandy River Force Main River Crossing Project includes the planning, design, permitting, and construction of a permanent replacement for the existing Sandy River force main crossing and associated infrastructure. The Work includes: Design and construction of a new force main crossing of the Sandy River Evaluation and selection of optimal alignment and trenchless crossing method Abandonment, removal, or decommissioning of the existing force main crossing Modifications to the Sandy River Lane Pump Station and/or Timberline Rim Pump Station connections, as required Removal of interim stabilization measures which have been constructed. Testing, commissioning, and startup of the completed system. The final configuration of the Project will be developed during Phase 1 services.