Roof Repairs Time, Material & Services
Closed State & local contract opportunity Posted
- Solicitation number
- Bid # SB-27-007
- State
- New Jersey
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Hashiah Brown bids@passaiccountynj.org (973) 247-3300
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Passaic County Board of County Commissioners is requesting bids for on-call roof repair, maintenance, inspection, and emergency response services at County-owned and County-operated facilities under project SB-27-007, with bids due October 28, 2026. The contract runs from January 1, 2027 through December 31, 2028 on a time-and-materials basis with no guaranteed minimum work volume or expenditure.
Scope includes emergency repairs, leak investigation and diagnosis, preventive maintenance, and repairs across multiple roofing systems: shingles, slate, tile, metal, EPDM, TPO/PVC, modified bitumen, and built-up roofing, along with flashing, drainage, gutter, skylight, penetration, deck, insulation, ventilation, and accessory work. All materials must be new, commercial grade, compatible with existing roofing systems, and installed per manufacturer specifications and applicable building codes. Work must be performed in accordance with OSHA requirements and accepted roofing industry practices with minimal disruption to County operations. The County will not permit travel-time charges or fuel surcharges.
Passaic County has established MBE and WBE set-aside program goals of 10% spend by 2022 and 20% by 2024. Contractors must comply with New Jersey prevailing wage requirements.
Qualification requirements include five years of continuous roofing construction and repair experience, all required state licenses and registrations, twenty-four-hour emergency response capability with on-site response times from two hours for emergency property threats to five business days for inspections, workers' compensation insurance, and general liability insurance of $1 million. Bidders must submit hourly pricing for journeyman, apprentice, and foreman labor across three time periods (first 8 hours Monday–Friday; hours exceeding 8 per day Monday–Friday and all Saturday; and all Sunday and holiday hours), plus a parts-and-materials percentage markup. Required certifications include Federal Non-Debarment Certification, New Jersey Business Registration Certificate, Public Works Contractor Registration Certificate, Non-Collusion Affidavit, prevailing wage compliance documents, and MBE/WBE Program Certification Form if applicable.
Opportunity text
Technical Specifications The purpose of this bid is to provide roof repair and maintenance services, including but not limited to the following: Emergency roof repairs Leak investigation and diagnosis Preventive roof maintenance Shingle repairs Slate repairs Tile repairs Metal roof repairs Low-slope roofing repairs EPDM repairs TPO/PVC repairs Modified bitumen repairs Built-up roofing repairs Flashing repairs Roof drainage repairs Gutter and downspout repairs Skylight repairs Roof penetration repairs Roof deck repairs Roof insulation repairs Roof coating Roof ventilation repairs Roof accessory repairs Storm damage repairs Snow and ice-related repairs Roof inspections Temporary waterproofing Localized roof replacement Other related roofing work as directed by the County. All materials shall be: New; Commercial grade; Suitable for the intended application; COUNTY OF PASSAIC Roof Repairs Time, Material & Services BOARD OF COUNTY COMMISSIONERS PROJECT SB-27-007 Page 3 of 41 Compatible with existing roofing; Installed in accordance with manufacturer requirements; and Approved by the County when specified. Whenever practical, replacement materials shall match the existing roofing system. The Contractor shall not substitute materials without written approval from the County. Installation and repair shall conform to applicable manufacturer's written instructions. Where manufacturer requirements conflict with this specification, the Contractor shall notify the County before proceeding. All work shall be performed: In a professional manner; In accordance with accepted roofing industry practices; In accordance with applicable building codes; In accordance with OSHA requirements; In accordance with manufacturer requirements; and In a manner that does not unnecessarily disrupt County operations. Many County facilities may remain occupied while work is performed. The Contractor shall: Coordinate work with facility representatives; Minimize disruption; Maintain safe pedestrian routes; Control noise; Control dust and debris; Protect building occupants; Maintain emergency access; Secure work areas; and Clean all work areas after completion of a task to the satisfaction of the County.
Files
| File | Type | Posted |
|---|---|---|
| passaic SB-27-007_Roof_Repairs_Time__Material___Services_134146.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity