Roadway Improvements For Brandon Road West
Closed State & local contract opportunity Posted
- Solicitation number
- Bid 26-12
- State
- New Jersey
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Sean Canning scanning@thecanninggroup.org (862) 228-3563
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The Township of Hopewell, New Jersey is requesting sealed bids for roadway improvements on Brandon Road West under Bid #26-12, with bids due October 20, 2026 at 10:00 a.m. through BidNet Direct. The work is funded through the New Jersey Department of Transportation and subject to prevailing wage requirements under N.J.S.A. 34:11-56.25 et seq.
The scope encompasses approximately 11,301 square yards of HMA milling; 1,300 tons of HMA 9.5M64 surface course pavement; 1,102 square yards of HMA pavement repair; 1,500 linear feet of crack sealing; 100 tons of micro surfacing aggregate; 3,070 gallons of micro surfacing emulsion; 277 linear feet of concrete curb replacement; 6 inlet repairs; 75 linear feet of beam guide rail installation with 6 anchorage units; 207 square yards of concrete sidewalk replacement; traffic control, pavement markings, and signage. All work must conform to the 2019 New Jersey Department of Transportation Standard Specifications for Road and Bridge Construction as amended. The contractor must furnish all labor, equipment, materials, and tools and perform work under the Engineer's immediate supervision, including restoration of inaccessible areas.
Work must be completed within 45 consecutive calendar days from notice to proceed. Bidders must submit a bid guarantee as a certified check, cashier's check, or bid bond in the amount of 10 percent of the total bid price, not to exceed $20,000, payable to the Township. Upon award, performance bonds, labor and material payment bonds, and a maintenance bond equal to 100 percent of the improvement cost are required. Named subcontractors must be disclosed in the bid. Contractors must obtain Business Registration Certificates, provide proof of non-debarment, comply with Equal Employment Opportunity and Affirmative Action regulations, and submit detailed workforce reports. Questions were due October 1, 2026 at 12:00 p.m. Bid results are to be posted within 24 hours of opening on the Township website.
Opportunity text
The contractor shall furnish all necessary labor, equipment, tools, implements and materials required to complete the improvements as shown on the construction plans within the time period specified. The work shall include but not be limited to site clearing and mobilization, traffic control, sign installation, HMA pavement repair, installation of HMA overlay, bituminous pavement milling, micro surfacing, concrete and curb replacement, concrete sidewalk replacement, striping, signage, site restoration and all other incidentals appurtenant thereto as directed by the Engineer, in a neat, competent, and skilled manner. The contractor shall be able to perform all work in accordance with the project specifications and under the immediate supervision of the Engineer, and shall be prepared to furnish the necessary labor required for the restoration of inaccessible areas. If sufficient materials, labor or equipment are not at the project site to complete this project or portion thereof when construction is in progress, the Engineer may summarily stop construction activity until such time as all necessary materials, labor, and equipment are at the project site. The work performed under this Contract shall comply with the 2019 New Jersey Department of Transportation Standard Specifications for Road and Bridge Construction as amended and supplemented which specifications are made a part of these specifications except as amended, modified or supplemented herein.
Files
| File | Type | Posted |
|---|---|---|
| hopewell SPECS_BrandonRoadWest_73002501.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity