About this opportunity

The state of Virginia, specifically Patrick County, is soliciting bids for the Ringgold Trail Bridge Repairs project, a comprehensive infrastructure rehabilitation initiative. The procurement is a single prime contract that involves grading, demolishing the existing bridge, and constructing a new bridge span along the rail trail. The project requires contractors to complete temporary access road construction, bridge span demolition, new pier and span construction, and site restoration. The total contract time is specified as 700 calendar days to Substantial Completion and 730 days to Final Completion. Bidders must submit a comprehensive bid package including a 5% bid bond, Bidder Compliance Statement, Qualification Statement, and other required documentation. The bid submission deadline is September 18, 2024, at 2:00 PM, with bids to be publicly opened and read aloud. Potential bidders are encouraged to submit formal questions by August 30, 2024, and the final addendum will be issued by September 4, 2024. The contract will be awarded based on the base bid, with liquidated damages of $250 per day for late completion beyond the specified completion dates.

While no specific set-aside designations or restrictions for disadvantaged enterprises are explicitly mentioned in the documentation, the bid documents indicate standard procurement protocols. The project will require the selected contractor to provide a construction trailer and perform all necessary staking and layout work, with the county hiring a Construction Quality Assurance consultant to oversee the project. The owner reserves the right to award the contract within 60 days of bid submission, and the contract will be awarded using a combination of lump sum and unit pricing methods. Although specific budget ranges are not detailed in the provided documents, the comprehensive nature of the bridge repair project suggests a significant capital investment. The contract allows for potential future renewal, and bidders will be expected to demonstrate technical capability, financial stability, and experience in similar infrastructure rehabilitation projects. Contractors should be prepared to integrate with existing infrastructure and follow all specified technical specifications and design requirements outlined in the project drawings and bid documents.

Opportunity text

Repairs to Ringgold Bridge to include grading and demo of existing bridge and construction of new bridge span.