2022.10.19 Ringgold Rail Trail Pedestrian Bridge - Drawings.pdf
PDF 22 MB Posted
- Attached to
- Ringgold Trail Bridge Repairs
- Solicitation number
- 72404
- Issued by
- Patrick County, Virginia
About this file
This document contains drawings for the Ringgold Rail Trail Pedestrian Bridge project, which is a state and local contract opportunity in Virginia's Pittsylvania County. The project involves repairs to the Ringgold Bridge, including grading, demolition of the existing bridge, and construction of a new bridge span. No details on item quantities, response dates, due dates, site visits, bidder's meetings, award dates, or contract term are provided in this document.
The document does not contain information on pricing terms, set asides, incumbents, funding requirements and sources, or any other salient details beyond the project overview and location.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
IN
G G
O
LD
R A
IL
T
R A
IL
P
E D
E S
TR
IA
N B
R
ID
G E
S U
P E
R S
TR
U
C
TU
R E
R E
P
LA
C E
M E
N T
A N
D S
U B
S
TR
U C
TU
R
E M
O D
IF
IC
A
TI
O N
P
IT
TS
Y
LV
A
N
IA
C O
U N
TY
R
IN
G G
O
LD
, V
IR
G
IN
IA
Drawing Index
Contacts:
Pittsylvania County
Pittsylvania County, Virginia
Ringgold Rail Trail Pedestrian Bridge
February 11, 2022 Revised October 19, 2022
Civil
General T-100 Cover Sheet
T-101 General Erosion and Sediment Control Notes
C-100 Existing Conditions C-110 Bridge Access Road C-111 Restoration Plan C-200 Erosion and Sediment Control Details C-201 Erosion and Sediment Control Details C-202 Erosion and Sediment Control Details C-300 Drainage Area Plan
Vicinity Map
COVER
SHEET
T100
SITE
NOTE: ACCORDING TO DOCUMENTS
OBTAINED FROM FEMA, THIS
PROJECT IS A RESTORATION OF
PRE-DISASTER CONDITIONS. NO
UPGRADES ARE INCLUDED IN THE
SITE DESIGN.
Structural S-1 General Plan & Elevation S-2 Typical Section S-3 Demolition & Construction Sequence S-4 Removal and Reconstruction Limits & Details S-5 General Notes & Quantities S-6 Bore Data S-7 Bore Data S-8 Pier 3 Elevation S-9 Pier 3 Details S-10 Arch Elevation - 1 S-11 Arch Elevation - 2 S-12 Arch Sections & Details - 1 S-13 Arch Sections & Details - 2 S-14 Bearing Seat Details - 1 S-15 Bearing Seat Details - 2 S-16 Framing Plan S-17 Beam Details S-18 Beam Details S-19 Curb & Fascia Panels S-20 Reinforcement Bar Schedule
C
B
A
SHEET NO.
KEY PLAN
SEAL
SCALE
D
E
APPROVED BY
CHECKED BY
REVISIONS
TITLE
DRAWN BY
DATE
PROJECT NO.
Dewberry Engineers Inc.
551 Piney Forest Road Danville ,VA 24540 Phone: 434.797.4497 Fax: 434.797.4341
AutoCAD SHX Text
BIDDING
AutoCAD SHX Text
APPROVAL
AutoCAD SHX Text
PRELIMINARY
AutoCAD SHX Text
SET NUMBER
AutoCAD SHX Text
RECORD
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
CONSTRUCTION
AutoCAD SHX Text
SUBMITTAL
AutoCAD SHX Text CIVIL ENGINEER: Dewberry Mark Talbert, P.E. 551 Piney Forest Road Danville, Virginia 24540 PH. (434) 549-8528 FAX (434) 797-4341 mtalbert@dewberry.com
AutoCAD SHX Text COUNTY PLAN REVIEWER: Pittsylvania County Deputy Zoning Administrator Karen Hayes 1 Center Street P.O. Box 426 Chatham, Virginia 24531 PH. (434) 432-1771 karen.hayes@pittgov.org
AutoCAD SHX Text
SCALE: N.T.S.
AutoCAD SHX Text OWNER: Pittsylvania County Assistant County Administrator Dave Arnold 1 Center Street Chatham, VA 24531 PH. (434) 770-0394 FAX (434) 432-7714 dave.arnold@pittgov.org
AutoCAD SHX Text No.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
BY
AutoCAD SHX Text Description
AutoCAD SHX Text 02/11/2021
AutoCAD SHX Text 50106038
AutoCAD SHX Text
JSS
AutoCAD SHX Text
MAT
AutoCAD SHX Text
AutoCAD SHX Text 4/11/2022
AutoCAD SHX Text
JSS
AutoCAD SHX Text County Comments
AutoCAD SHX Text
AutoCAD SHX Text 5/11/2022
AutoCAD SHX Text
JSS
AutoCAD SHX Text DEQ Comments
AutoCAD SHX Text
AutoCAD SHX Text 5/26/2022
AutoCAD SHX Text
JSS
AutoCAD SHX Text DEQ Comments
AutoCAD SHX Text
AutoCAD SHX Text 10/19/2022
AutoCAD SHX Text
JSS
AutoCAD SHX Text DEQ Comments
AutoCAD SHX Text STRUCTURAL ENGINEER: Dewberry Matthew Payne, P.E. 2610 Wycliff Road, Suite 410 Raleigh, NC 27607 PH. (919) 636-6322 mpayne@dewberry.com
GENERAL NOTES
T101
1. SOIL STABILIZATION: PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO
DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF
THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO
DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT FOR
LONGER THAN 14 DAYS. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE
TO BE LEFT DORMANT FOR MORE THAN ONE YEAR.
2. SOIL STOCKPILE STABILIZATION: DURING CONSTRUCTION OF THE PROJECT, SOIL STOCK PILES
AND BORROW AREAS SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING
MEASURES. THE APPLICANT IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND
PERMANENT STABILIZATION OF ALL SOIL STOCKPILES ON SITE AS WELL AS BORROW AREAS
AND SOIL INTENTIONALLY TRANSPORTED FROM THE PROJECT SITE.
3. PERMANENT STABILIZATION: A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON
DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED. PERMANENT VEGETATION
SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT IS
UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION.
4. SEDIMENT BASINS AND TRAPS: SEDIMENT BASINS, SEDIMENT TRAPS, PERIMETER DIKES,
SEDIMENT BARRIERS AND OTHER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE
CONSTRUCTED AS A FIRST STEP IN ANY LAND-DISTURBING ACTIVITY AND SHALL BE MADE
FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE.
5. STABILIZATION OF EARTHEN STRUCTURES: STABILIZATION MEASURES SHALL BE APPLIED TO
EARTHEN STRUCTURES SUCH AS DAMS, DIKES AND DIVERSIONS IMMEDIATELY AFTER
INSTALLATION.
6. SEDIMENT TRAPS AND SEDIMENT BASINS: SEDIMENT TRAPS AND SEDIMENT BASINS SHALL BE
DESIGNED AND CONSTRUCTED BASED UPON THE TOTAL DRAINAGE AREA TO BE SERVED BY
THE TRAP OR BASIN.
a. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TRAP SHALL BE 134 CUBIC YARDS PER
ACRE OF DRAINAGE AREA AND THE TRAP SHALL ONLY CONTROL DRAINAGE AREAS LESS
THAN THREE ACRES.
b. SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPRISED OF FLOW FROM
DRAINAGE AREAS GREATER THAN OR EQUAL TO THREE ACRES SHALL BE CONTROLLED BY
A SEDIMENT BASIN. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT BASIN SHALL BE
134 CUBIC YARDS PER ACRE OF DRAINAGE AREA. THE OUTFALL SYSTEM SHALL, AT A
MINIMUM, MAINTAIN THE STRUCTURAL INTEGRITY OF THE BASIN DURING A 25-YEAR
STORM OF 24-HOUR DURATION. RUNOFF COEFFICIENTS USED IN RUNOFF CALCULATIONS
SHALL CORRESPOND TO A BARE EARTH CONDITION OR THOSE CONDITIONS EXPECTED TO
EXIST WHILE THE SEDIMENT BASIN IS UTILIZED.
7. CUT AND FILL SLOPES DESIGN & CONSTRUCTION: CUT AND FILL SLOPES SHALL BE DESIGNED
AND CONSTRUCTED IN A MANNER THAT WILL MINIMIZE EROSION. SLOPES THAT ARE FOUND TO
BE ERODING EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION SHALL BE
PROVIDED WITH ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE PROBLEM IS
CORRECTED.
8. CONCENTRATED RUNOFF DOWN SLOPES: CONCENTRATED RUNOFF SHALL NOT FLOW DOWN
CUT OR FILL SLOPES UNLESS CONTAINED WITHIN AN ADEQUATE TEMPORARY OR PERMANENT
CHANNEL, FLUME OR SLOPE DRAIN STRUCTURE.
9. SLOPE MAINTENANCE: WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE
OR OTHER PROTECTION SHALL BE PROVIDED.
10. STORM SEWER INLET PROTECTION: ALL STORM SEWER INLETS THAT ARE MADE OPERABLE
DURING CONSTRUCTION SHALL BE PROTECTED SO THAT SEDIMENT-LADEN WATER CANNOT
ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE TREATED
TO REMOVE SEDIMENT.
11. STORMWATER CONVEYANCE PROTECTION: BEFORE NEWLY CONSTRUCTED STORMWATER
CONVEYANCE CHANNELS OR PIPES ARE MADE OPERATIONAL, ADEQUATE OUTLET
PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE
INSTALLED IN BOTH THE CONVEYANCE CHANNEL AND RECEIVING CHANNEL.
12. WORK IN LIVE WATERCOURSE: WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED,
PRECAUTIONS SHALL BE TAKEN TO MINIMIZE ENCROACHMENT, CONTROL SEDIMENT
TRANSPORT AND STABILIZE THE WORK AREA TO THE GREATEST EXTENT POSSIBLE DURING
CONSTRUCTION. NONERODIBLE MATERIAL SHALL BE USED FOR THE CONSTRUCTION OF
CAUSEWAYS AND COFFERDAMS. EARTHEN FILL MAY BE USED FOR THESE STRUCTURES IF
ARMORED BY NONERODIBLE COVER MATERIALS.
13. CROSSING LIVE WATERCOURSE: WHEN A LIVE WATERCOURSE MUST BE CROSSED BY
CONSTRUCTION VEHICLES MORE THAN TWICE IN ANY SIX-MONTH PERIOD, A TEMPORARY
VEHICULAR STREAM CROSSING CONSTRUCTED OF NONERODIBLE MATERIAL SHALL BE
PROVIDED.
14. REGULATION OF WATERCOURSE CROSSING: ALL APPLICABLE FEDERAL, STATE AND LOCAL
REQUIREMENTS PERTAINING TO WORKING IN OR CROSSING LIVE WATERCOURSES SHALL BE
MET.
15. STABILIZATION OF WATERCOURSE: THE BED AND BANKS OF A WATERCOURSE SHALL BE
STABILIZED IMMEDIATELY AFTER WORK IN THE WATERCOURSE IS COMPLETED.
16. UNDERGROUND UTILITY LINE INSTALLATION: UNDERGROUND UTILITY LINES SHALL BE
INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN ADDITION TO OTHER
APPLICABLE CRITERIA:
a. NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME.
b. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES.
c. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH
AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER
THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR OFF-SITE PROPERTY.
d. MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY COMPACTED IN
ORDER TO MINIMIZE EROSION AND PROMOTE STABILIZATION.
e. RESTABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THIS CHAPTER.
f. APPLICABLE SAFETY REQUIREMENTS SHALL BE COMPLIED WITH.
17. VEHICULAR SEDIMENT TRACKING: WHERE CONSTRUCTION VEHICLE ACCESS ROUTES
INTERSECT PAVED OR PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE
TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE
SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SURFACE
SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED
FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT
CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS
REMOVED IN THIS MANNER. THIS PROVISION SHALL APPLY TO INDIVIDUAL DEVELOPMENT LOTS
AS WELL AS TO LARGER LAND-DISTURBING ACTIVITIES.
18. REMOVAL OF TEMPORARY MEASURES: ALL TEMPORARY EROSION AND SEDIMENT CONTROL
MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER
THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY
THE VESCP AUTHORITY. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING
FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO
PREVENT FURTHER EROSION AND SEDIMENTATION.
19. STORMWATER MANAGEMENT: PROPERTIES AND WATERWAYS DOWNSTREAM FROM
DEVELOPMENT SITES SHALL BE PROTECTED FROM SEDIMENT DEPOSITION, EROSION AND
DAMAGE DUE TO INCREASES IN VOLUME, VELOCITY AND PEAK FLOW RATE OF STORMWATER
RUNOFF FOR THE STATED FREQUENCY STORM OF 24-HOUR DURATION IN ACCORDANCE WITH
THE FOLLOWING STANDARDS AND CRITERIA. STREAM RESTORATION AND RELOCATION
PROJECTS THAT INCORPORATE NATURAL CHANNEL DESIGN CONCEPTS ARE NOT MAN-MADE
CHANNELS AND SHALL BE EXEMPT FROM ANY FLOW RATE CAPACITY AND VELOCITY
REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS:
a. CONCENTRATED STORMWATER RUNOFF LEAVING A DEVELOPMENT SITE SHALL BE
DISCHARGED DIRECTLY INTO AN ADEQUATE NATURAL OR MAN-MADE RECEIVING
CHANNEL, PIPE OR STORM SEWER SYSTEM. FOR THOSE SITES WHERE RUNOFF IS
DISCHARGED INTO A PIPE OR PIPE SYSTEM, DOWNSTREAM STABILITY ANALYSES AT THE
OUTFALL OF THE PIPE OR PIPE SYSTEM SHALL BE PERFORMED.
b. ADEQUACY OF ALL CHANNELS AND PIPES SHALL BE VERIFIED IN THE FOLLOWING MANNER:
i. THE APPLICANT SHALL DEMONSTRATE THAT THE TOTAL DRAINAGE AREA TO THE POINT
OF ANALYSIS WITHIN THE CHANNEL IS ONE HUNDRED TIMES GREATER THAN THE
CONTRIBUTING DRAINAGE AREA OF THE PROJECT IN QUESTION; OR
ii. (A) NATURAL CHANNELS SHALL BE ANALYZED BY THE USE OF A TWO-YEAR STORM TO
VERIFY THAT STORMWATER WILL NOT OVERTOP CHANNEL BANKS NOR CAUSE EROSION
OF CHANNEL BED OR BANKS.
(B) ALL PREVIOUSLY CONSTRUCTED MAN-MADE CHANNELS SHALL BE ANALYZED BY THE
USE OF A TEN-YEAR STORM TO VERIFY THAT STORMWATER WILL NOT OVERTOP ITS
BANKS AND BY THE USE OF A TWO-YEAR STORM TO DEMONSTRATE THAT STORMWATER
WILL NOT CAUSE EROSION OF CHANNEL BED OR BANKS; AND
(C) PIPES AND STORM SEWER SYSTEMS SHALL BE ANALYZED BY THE USE OF A TEN-YEAR
STORM TO VERIFY THAT STORMWATER WILL BE CONTAINED WITHIN THE PIPE OR SYSTEM.
c. IF EXISTING NATURAL RECEIVING CHANNELS OR PREVIOUSLY CONSTRUCTED MAN-MADE
CHANNELS OR PIPES ARE NOT ADEQUATE, THE APPLICANT SHALL:
i. IMPROVE THE CHANNELS TO A CONDITION WHERE A TEN-YEAR STORM WILL NOT
OVERTOP THE BANKS AND A TWO-YEAR STORM WILL NOT CAUSE EROSION TO THE
CHANNEL, THE BED, OR THE BANKS; OR
ii. IMPROVE THE PIPE OR PIPE SYSTEM TO A CONDITION WHERE THE TEN-YEAR STORM IS
CONTAINED WITHIN THE APPURTENANCES;
iii.DEVELOP A SITE DESIGN THAT WILL NOT CAUSE THE PRE-DEVELOPMENT PEAK RUNOFF
RATE FROM A TWO-YEAR STORM TO INCREASE WHEN RUNOFF OUTFALLS INTO A NATURAL
CHANNEL OR WILL NOT CAUSE THE PRE-DEVELOPMENT PEAK RUNOFF RATE FROM A
TEN-YEAR STORM TO INCREASE WHEN RUNOFF OUTFALLS INTO A MAN-MADE CHANNEL;
OR
iv.PROVIDE A COMBINATION OF CHANNEL IMPROVEMENT, STORMWATER DETENTION OR
OTHER MEASURES WHICH IS SATISFACTORY TO THE VESCP AUTHORITY TO PREVENT
DOWNSTREAM EROSION.
d. THE APPLICANT SHALL PROVIDE EVIDENCE OF PERMISSION TO MAKE THE IMPROVEMENTS.
e. ALL HYDROLOGIC ANALYSES SHALL BE BASED ON THE EXISTING WATERSHED
CHARACTERISTICS AND THE ULTIMATE DEVELOPMENT CONDITION OF THE SUBJECT
PROJECT.
f. IF THE APPLICANT CHOOSES AN OPTION THAT INCLUDES STORMWATER DETENTION, HE
SHALL OBTAIN APPROVAL FROM THE VESCP OF A PLAN FOR MAINTENANCE OF THE
DETENTION FACILITIES. THE PLAN SHALL SET FORTH THE MAINTENANCE REQUIREMENTS
OF THE FACILITY AND THE PERSON RESPONSIBLE FOR PERFORMING THE MAINTENANCE.
g. OUTFALL FROM A DETENTION FACILITY SHALL BE DISCHARGED TO A RECEIVING CHANNEL, AND ENERGY DISSIPATORS SHALL BE PLACED AT THE OUTFALL OF ALL DETENTION
FACILITIES AS NECESSARY TO PROVIDE A STABILIZED TRANSITION FROM THE FACILITY TO
THE RECEIVING CHANNEL.
h. ALL ON-SITE CHANNELS MUST BE VERIFIED TO BE ADEQUATE.
i. INCREASED VOLUMES OF SHEET FLOWS THAT MAY CAUSE EROSION OR SEDIMENTATION
ON ADJACENT PROPERTY SHALL BE DIVERTED TO A STABLE OUTLET, ADEQUATE
CHANNEL, PIPE OR PIPE SYSTEM, OR TO A DETENTION FACILITY.
j. IN APPLYING THESE STORMWATER MANAGEMENT CRITERIA, INDIVIDUAL LOTS OR
PARCELS IN A RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT SHALL NOT BE
CONSIDERED TO BE SEPARATE DEVELOPMENT PROJECTS. INSTEAD, THE DEVELOPMENT,
AS A WHOLE, SHALL BE CONSIDERED TO BE A SINGLE DEVELOPMENT PROJECT.
HYDROLOGIC PARAMETERS THAT REFLECT THE ULTIMATE DEVELOPMENT CONDITION
SHALL BE USED IN ALL ENGINEERING CALCULATIONS.
k. ALL MEASURES USED TO PROTECT PROPERTIES AND WATERWAYS SHALL BE EMPLOYED
IN A MANNER WHICH MINIMIZES IMPACTS ON THE PHYSICAL, CHEMICAL AND BIOLOGICAL
INTEGRITY OF RIVERS, STREAMS AND OTHER WATERS OF THE STATE.
l. ANY PLAN APPROVED PRIOR TO JULY 1, 2014, THAT PROVIDES FOR STORMWATER
MANAGEMENT THAT ADDRESSES ANY FLOW RATE CAPACITY AND VELOCITY
REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS SHALL SATISFY THE FLOW RATE
CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS IF THE
PRACTICES ARE DESIGNED TO
i. DETAIN THE WATER QUALITY VOLUME AND TO RELEASE IT OVER 48 HOURS;
ii. DETAIN AND RELEASE OVER A 24-HOUR PERIOD THE EXPECTED RAINFALL RESULTING
FROM THE ONE YEAR, 24-HOUR STORM; AND
iii.REDUCE THE ALLOWABLE PEAK FLOW RATE RESULTING FROM THE 1.5, 2, AND 10-YEAR, 24-HOUR STORMS TO A LEVEL THAT IS LESS THAN OR EQUAL TO THE PEAK FLOW RATE
FROM THE SITE ASSUMING IT WAS IN A GOOD FORESTED CONDITION, ACHIEVED THROUGH
MULTIPLICATION OF THE FORESTED PEAK FLOW RATE BY A REDUCTION FACTOR THAT IS
EQUAL TO THE RUNOFF VOLUME FROM THE SITE WHEN IT WAS IN A GOOD FORESTED
CONDITION DIVIDED BY THE RUNOFF VOLUME FROM THE SITE IN ITS PROPOSED
CONDITION, AND SHALL BE EXEMPT FROM ANY FLOW RATE CAPACITY AND VELOCITY
REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS AS DEFINED IN ANY
REGULATIONS PROMULGATED PURSUANT TO § 62.1-44.15:54 OR 62.1-44.15:65 OF THE ACT.
m.FOR PLANS APPROVED ON AND AFTER JULY 1, 2014, THE FLOW RATE CAPACITY AND
VELOCITY REQUIREMENTS OF § 62.1-44.15:52 A OF THE ACT AND THIS SUBSECTION SHALL
BE SATISFIED BY COMPLIANCE WITH WATER QUANTITY REQUIREMENTS IN THE
STORMWATER MANAGEMENT ACT (§ 62.1-44.15:24 ET SEQ. OF THE CODE OF VIRGINIA) AND
ATTENDANT REGULATIONS, UNLESS SUCH LAND-DISTURBING ACTIVITIES ARE IN
ACCORDANCE WITH 9VAC25-870-48 OF THE VIRGINIA STORMWATER MANAGEMENT
PROGRAM (VSMP) REGULATIONS.
n. COMPLIANCE WITH THE WATER QUANTITY MINIMUM STANDARDS SET OUT IN
9VAC25-870-66 OF THE VIRGINIA STORMWATER MANAGEMENT PROGRAM (VSMP)
REGULATIONS SHALL BE DEEMED TO SATISFY THE REQUIREMENTS OF SUBDIVISION 19 OF
THIS SUBSECTION.
NOTE: ACCORDING TO DOCUMENTS
OBTAINED FROM FEMA, THIS
PROJECT IS A RESTORATION OF
PRE-DISASTER CONDITIONS. NO
UPGRADES ARE INCLUDED IN THE
SITE DESIGN.
C
B
A
SHEET NO.
KEY PLAN
SEAL
SCALE
D
E
APPROVED BY
CHECKED BY
REVISIONS
TITLE
DRAWN BY
DATE
PROJECT NO.
Dewberry Engineers Inc.
551 Piney Forest Road Danville ,VA 24540 Phone: 434.797.4497 Fax: 434.797.4341
R
IN
G G
O
LD
R A
IL
T
R A
IL
P
E D
E S
TR
IA
N B
R
ID
G E
S U
P E
R S
TR
U
C
TU
R E
R E
P
LA
C E
M E
N T
A N
D S
U B
S
TR
U C
TU
R
E M
O D
IF
IC
A
TI
O N
P
IT
TS
Y
LV
A
N
IA
C O
U N
TY
R
IN
G G
O
LD
, V
IR
G
IN
IA
AutoCAD SHX Text %%UGeneral Notes
AutoCAD SHX Text
1. FIELD VERIFY VERTICAL AND HORIZONTAL LOCATIONS OF ALL UTILITIES PRIOR TO FIELD VERIFY VERTICAL AND HORIZONTAL LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION. NOTIFY THE UTILITY COMPANIES 48 HOURS PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY. CONTACT MISS UTILITY (811) 48 HOURS PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION. 2. NOTIFY THE VIRGINIA DEPARTMENT OF TRANSPORTATION PRIOR TO ANY NOTIFY THE VIRGINIA DEPARTMENT OF TRANSPORTATION PRIOR TO ANY CONSTRUCTION ON STREET RIGHT-OF-WAYS (PHONE NO. 434-432-7219). 3. WHEN WORKING ADJACENT TO EXISTING STRUCTURES, POLES, ETC., CONTRACTOR WHEN WORKING ADJACENT TO EXISTING STRUCTURES, POLES, ETC., CONTRACTOR SHALL USE WHATEVER METHODS THAT ARE NECESSARY TO PROTECT STRUCTURES FROM DAMAGE. REPLACEMENT OF DAMAGED STRUCTURES SHALL BE AT THE CONTRACTOR'S EXPENSE. 4. EROSION AND SEDIMENT CONTROL NOTES: EROSION AND SEDIMENT CONTROL NOTES: A. ALL SEDIMENT CONTROL PRACTICES AND MEASURES SHALL CONFORM ALL SEDIMENT CONTROL PRACTICES AND MEASURES SHALL CONFORM TO THE LATEST EDITION OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND THE VDOT ROAD AND BRIDGE STANDARDS MANUAL. B. CONTRACTOR SHALL INSTALL SILT BARRIERS, INLET PROTECTION, CONTRACTOR SHALL INSTALL SILT BARRIERS, INLET PROTECTION, CONSTRUCTION ENTRANCES AT POINTS OF INGRESS AND EGRESS TO PUBLIC RIGHT-OF-WAY, STABILIZE DISTURBED AREAS, AND PROVIDE OTHER MEASURES REQUIRED AS SHOWN ON THE DRAWINGS AND SPECIFIED. C. CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO PREVENT CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO PREVENT TRACKING ON EXISTING PAVEMENTS. D. CONTRACTOR SHALL INSTALL GRAVEL CONSTRUCTION ROAD CONTRACTOR SHALL INSTALL GRAVEL CONSTRUCTION ROAD STABILIZATION OF ADEQUATE AREA TO ACCOMMODATE CONSTRUCTION VEHICLE PARKING, MATERIAL STORAGE, ETC. AT A LOCATION CONVENIENT TO THE INDIVIDUAL CONSTRUCTION AREAS AND CONSISTENT WITH THE CONSTRUCTION SEQUENCES. E. THE LOCATIONS OF SEDIMENT AND EROSION CONTROL MEASURES THE LOCATIONS OF SEDIMENT AND EROSION CONTROL MEASURES SHOWN ON PLANS ARE APPROXIMATE, THE EXACT LOCATION MUST BE DETERMINED IN THE FIELD. F. A ROCK CHECK DAM SHALL BE INSTALLED BELOW THE DISTURBED A ROCK CHECK DAM SHALL BE INSTALLED BELOW THE DISTURBED AREA WITHIN DITCH LINES AND/OR WHERE DITCH LINES OUTLET TO UNDISTURBED AREAS. G. SILT FENCE SHALL BE PROVIDED BELOW DISTURBED AREAS FOR ALL SILT FENCE SHALL BE PROVIDED BELOW DISTURBED AREAS FOR ALL LOCATIONS WHERE DISTURBED AREA DRAINS TOWARD PROPERTY OWNER BY OTHERS AND/OR TOWARD STREAMS. 5. ALL DISTURBED AREAS ARE TO BE MULCHED AND SEEDED PER THE ALL DISTURBED AREAS ARE TO BE MULCHED AND SEEDED PER THE SPECIFICATIONS WITHIN 7 DAYS OF ACHIEVING FINAL GRADES. 6. IF CONSTRUCTION SCHEDULE DOES NOT ALLOW PERMANENT SEEDING IN THE IF CONSTRUCTION SCHEDULE DOES NOT ALLOW PERMANENT SEEDING IN THE DATES SHOWN IN THE SPECIFICATIONS OR IF CONSTRUCTION IS TEMPORARILY HALTED FOR A PERIOD OF 14 DAYS OR LONGER DUE TO WEATHER, WINTER SHUT DOWN, ETC., CONTRACTOR SHALL INSTALL TEMPORARY SEEDING WITHIN 7 DAYS. WHEN PERMANENT SEEDING DATES CAN BE ACCOMMODATED, THE CONTRACTOR SHALL RESEED WITH PERMANENT SEEDING MIXTURES. ALL SEEDED AREAS, WHICH DO NOT PRODUCE A THICK, HEALTHY, DESIRABLE VEGETATIVE COVER, ARE TO BE RESEEDED AND MULCHED AS NECESSARY UNTIL ACCEPTABLE VEGETATIVE COVER IS ESTABLISHED. PRIOR TO RESEEDING WITH PERMANENT VEGETATION, ALL ESTABLISHED TEMPORARY VEGETATION IS TO BE REMOVED. 7. ANY CONSTRUCTION WITHIN THE VIRGINIA DEPARTMENT OF TRANSPORTATION'S ANY CONSTRUCTION WITHIN THE VIRGINIA DEPARTMENT OF TRANSPORTATION'S RIGHTS-OF-WAY ARE TO BE IN ACCORDANCE WITH THE STATE'S STANDARDS AND SPECIFICATIONS REGARDING MATERIALS, INSTALLATION, AND TESTING, UNLESS NOTED OTHERWISE IN THE CONTRACT DRAWINGS AND TECHNICAL SPECIFICATIONS, EXCEPT THE METHOD OF PAYMENT WHICH WILL BE AS SPECIFIED IN THE TECHNICAL SPECIFICATIONS AND CONTRACT DOCUMENTS. ANY CONSTRUCTION WITHIN THE VDOT RIGHTS-OF-WAYS AND AT ENTRANCE TO VDOT RIGHT-OF-WAYS ARE TO BE SIGNED IN ACCORDANCE WITH THE VIRGINIA WORK AREA PROTECTION MANUAL STANDARDS AND GUIDELINE. 8. TOPSOIL IS TO BE STOCKPILED AND RE-SPREAD OVER DISTURBED AREAS TO BE TOPSOIL IS TO BE STOCKPILED AND RE-SPREAD OVER DISTURBED AREAS TO BE SEEDED PER THE TECHNICAL SPECIFICATIONS. STOCKPILES SHALL BE GRADED TO PROVIDE POSITIVE DRAINAGE AND SEDIMENT AND EROSION CONTROLS DEVICES/MEASURES SHALL BE INSTALLED AS NECESSARY. THESE STOCKPILES ARE TO BE LOCATED IN AREAS THAT MINIMIZE DISTURBANCE TO CONSTRUCTION OPERATIONS. ANY OFF-SITE LAND DISTURBING ACTIVITIES ASSOCIATED WITH THIS PROJECT MUST HAVE AN APPROVED EROSION AND SEDIMENT CONTROL PLAN. CONTRACTOR IS RESPONSIBLE FOR SUBMITTING DOCUMENTATION OF THE APPROVED EROSION SEDIMENT CONTROL PLAN FOR EACH OF THESE SITES. 9. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES TO BE REMOVED ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES TO BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY THE LOCAL PROGRAM ADMINISTRATOR. 10. ALL DISTURBED PAVEMENT AND GRAVEL DRIVES ARE TO BE RESTORED TO ALL DISTURBED PAVEMENT AND GRAVEL DRIVES ARE TO BE RESTORED TO ORIGINAL CONDITION OR BETTER. 11. WHEN CONSTRUCTION DISTURBS EXISTING DITCH LINES, THE RESTORED DITCH WHEN CONSTRUCTION DISTURBS EXISTING DITCH LINES, THE RESTORED DITCH LINES SHALL BE STABILIZED WITH EXCELSIOR MAT OR SOD FOR EROSION CONTROL. 12. DRIVEWAYS, FENCES, MAILBOXES, ROAD SIGNS, STEPS, SIDEWALKS, ETC., THAT DRIVEWAYS, FENCES, MAILBOXES, ROAD SIGNS, STEPS, SIDEWALKS, ETC., THAT INTERFERE WITH CONSTRUCTION ARE TO BE RESTORED TO ORIGINAL CONDITION. 13. PAVED DRIVEWAYS, PARKING LOTS, AND PRIVATE ROADS SHALL BE OPEN-CUT PAVED DRIVEWAYS, PARKING LOTS, AND PRIVATE ROADS SHALL BE OPEN-CUT UNLESS SHOWN OTHERWISE. 14. CONTRACTOR SHALL NOT DISTURB ANY TREES, SHRUBS, OR LANDSCAPING CONTRACTOR SHALL NOT DISTURB ANY TREES, SHRUBS, OR LANDSCAPING OUTSIDE THE CONSTRUCTION LIMITS. CONTRACTOR SHALL USE EXTREME CAUTION TO PREVENT DISTURBANCE TO THE TREES, SHRUBS, ETC., WHICH ARE IN THE CONSTRUCTION LIMITS AND NOTED TO REMAIN. 15. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO VERIFY THE CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO VERIFY LOCATION OF AND PREVENT DISTURBANCE OF ANY EXISTING UTILITIES IN WORK AREA, AND PROVIDE IMMEDIATE TEMPORARY SERVICE TO ANY DAMAGED UTILITIES AT THE EXPENSE OF THE CONTRACTOR. ANY EXISTING UTILITIES NOT LOCATED PRIOR TO BEGINNING CONSTRUCTION THAT ARE DAMAGED DURING CONSTRUCTION OR WHICH CONFLICT WITH PROPOSED CONSTRUCTION SHALL BE REPAIRED OR RELOCATED TO THE SATISFACTION OF THE ENGINEER AT THE CONTRACTOR'S EXPENSE. 16. THE CONTRACTOR SHALL MAINTAIN PEDESTRIAN, POSTAL & VEHICULAR ACCESS THE CONTRACTOR SHALL MAINTAIN PEDESTRIAN, POSTAL & VEHICULAR ACCESS TO & FROM ALL DWELLINGS & BUSINESSES DURING CONSTRUCTION. 17. TOPOGRAPHIC SURVEY FOR THIS PROJECT IS BASED ON A CURRENT FIELD TOPOGRAPHIC SURVEY FOR THIS PROJECT IS BASED ON A CURRENT FIELD SURVEY DATED DECEMBER 2020. 18. HORIZONTAL CONTROL: VIRGINIA STATE PLANE (SOUTH ZONE) (NAD83, NSRS HORIZONTAL CONTROL: VIRGINIA STATE PLANE (SOUTH ZONE) (NAD83, NSRS 2011, US FT). HORIZONTAL CONTROL ESTABLISHED BY GPS OBSERVATIONS AND COMPUTED USING THE KEYNETGPS VIRTUAL REFERENCE STATION NETWORK(VRS).
AutoCAD SHX Text VA E&S Minimum Standards
AutoCAD SHX Text No.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
BY
AutoCAD SHX Text Description
AutoCAD SHX Text 02/11/2021
AutoCAD SHX Text 50106038
AutoCAD SHX Text
JSS
AutoCAD SHX Text
MAT
AutoCAD SHX Text
AutoCAD SHX Text 4/11/2022
AutoCAD SHX Text
JSS
AutoCAD SHX Text County Comments
AutoCAD SHX Text
AutoCAD SHX Text 5/11/2022
AutoCAD SHX Text
JSS
AutoCAD SHX Text DEQ Comments
AutoCAD SHX Text
AutoCAD SHX Text 5/26/2022
AutoCAD SHX Text
JSS
AutoCAD SHX Text DEQ Comments
AutoCAD SHX Text
AutoCAD SHX Text 10/19/2022
AutoCAD SHX Text
JSS
DEQ Comments
26D
HSG: B
8A
HSG: B/D
12C
HSG: B
16B
HSG: D
C100
30'0' 15' 60'
SCALE: 1" = 30'
EXISTING
CONDITIONS
NOTE: ACCORDING TO DOCUMENTS OBTAINED FROM FEMA, THIS
PROJECT IS A RESTORATION OF PRE-DISASTER CONDITIONS. NO
UPGRADES ARE INCLUDED IN THE SITE DESIGN.
C
B
A
SHEET NO.
KEY PLAN
SEAL
SCALE
D
E
APPROVED BY
CHECKED BY
REVISIONS
TITLE
DRAWN BY
DATE
PROJECT NO.
Dewberry Engineers Inc.
551 Piney Forest Road Danville ,VA 24540 Phone: 434.797.4497 Fax: 434.797.4341
R
IN
G G
O
LD
R A
IL
T
R A
IL
P
E D
E S
TR
IA
N B
R
ID
G E
S U
P E
R S
TR
U
C
TU
R E
R E
P
LA
C E
M E
N T
A N
D S
U B
S
TR
U C
TU
R
E M
O D
IF
IC
A
TI
O N
P
IT
TS
Y
LV
A
N
IA
C O
U N
TY
R
IN
G G
O
LD
, V
IR
G
IN
IA
NOTE: TOPO SHOWN ON THIS DRAWING IS COMBINED FROM DEWBERRY
SURVEY AND PITTSYLVANIA COUNTY AERIAL SURVEY.
WETLAND WB
(PFO)
WETLAND WA
(PEM)
STREAM SB STREAM SA
LOUIS H. DALTON
PIN : 2368-03-5951
DONALD W. AND FRANCES E. WILES
PIN : 2358-83-2440
RICHARD L., JR. AND MARY JO W. SOWERS
PIN : 2358-84-4492
CLOVERDALE LUMBER CO INC
PIN : 2368-02-4887
CLOVERDALE LUMBER CO INC
PIN : 2358-81-6739
ZONE A FLOODPLAIN
ZONE A FLOODPLAIN
AutoCAD SHX Text
NLS
AutoCAD SHX Text
EDGE OF
AutoCAD SHX Text
48" WOV
AutoCAD SHX Text
STREAM
AutoCAD SHX Text
RAILROAD TRESTLE / WALK TRAIL BRIDGE
AutoCAD SHX Text
48" WOV
AutoCAD SHX Text
6"X6" WOOD 2 MILE MARKER POST
AutoCAD SHX Text N:3383237.386
AutoCAD SHX Text E:11259595.850
AutoCAD SHX Text
ELEV:461.92
AutoCAD SHX Text 60d NAIL SET
AutoCAD SHX Text CONTROL POINT No. 1
AutoCAD SHX Text N:3383209.534
AutoCAD SHX Text E:11259513.320
AutoCAD SHX Text
ELEV:461.96
AutoCAD SHX Text N:3383287.191
AutoCAD SHX Text E:11259751.213
AutoCAD SHX Text
ELEV:460.15
AutoCAD SHX Text 60d NAIL SET
AutoCAD SHX Text CONTROL POINT No. 2
AutoCAD SHX Text 60d NAIL SET
AutoCAD SHX Text CONTROL POINT No. 50
AutoCAD SHX Text
48" WOV
AutoCAD SHX Text
48" WOV
AutoCAD SHX Text
STREAM
AutoCAD SHX Text
STREAM
AutoCAD SHX Text
STREAM
AutoCAD SHX Text
STREAM
AutoCAD SHX Text
EOG
AutoCAD SHX Text
EOG
AutoCAD SHX Text
EOG
AutoCAD SHX Text
EOG
AutoCAD SHX Text
BENCH MARK: NGS MONUMENT FY0762 ELEVATION = 462.69 SEE NOTE 2
AutoCAD SHX Text
RIP RAP
AutoCAD SHX Text
TRV#6049
AutoCAD SHX Text
ELEV=465.50
AutoCAD SHX Text
TRV#6128
AutoCAD SHX Text
ELEV=468.28
AutoCAD SHX Text
RAIL TRAIL
AutoCAD SHX Text
EOG
AutoCAD SHX Text
EOG
AutoCAD SHX Text
DIRT TRAIL
AutoCAD SHX Text
DIRT TRAIL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text No.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
BY
AutoCAD SHX Text Description
AutoCAD SHX Text 02/11/2021
AutoCAD SHX Text 50106038
AutoCAD SHX Text
JSS
AutoCAD SHX Text
MAT
AutoCAD SHX Text
AutoCAD SHX Text 4/11/2022
AutoCAD SHX Text
JSS
AutoCAD SHX Text County Comments
AutoCAD SHX Text
AutoCAD SHX Text 5/11/2022
AutoCAD SHX Text
JSS
AutoCAD SHX Text DEQ Comments
AutoCAD SHX Text
AutoCAD SHX Text 5/26/2022
AutoCAD SHX Text
JSS
AutoCAD SHX Text DEQ Comments
AutoCAD SHX Text
AutoCAD SHX Text 10/19/2022
AutoCAD SHX Text
JSS
DEQ Comments
26D
HSG: B
8A
HSG: B/D
12C
HSG: B
16B
HSG: D
414.00
414.00
415.00
415.00
414.21
414.10
415.00
415.00
444.74
446.05
443.41
445.60
466.00
414.91
414.80
417.75
417.75
C
B
A
SHEET NO.
KEY PLAN
SEAL
SCALE
D
E
APPROVED BY
CHECKED BY
REVISIONS
TITLE
DRAWN BY
DATE
PROJECT NO.
Dewberry Engineers Inc.
551 Piney Forest Road Danville ,VA 24540 Phone: 434.797.4497 Fax: 434.797.4341
C110
30'0' 15' 60'
SCALE: 1" = 30'
BRIDGE ACCESS
ROAD
THE FOLLOWING SEQUENCE OF CONSTRUCTION SHALL BE ADHERED TO BY THE CONTRACTOR AT ALL TIMES:
1. OBTAIN ALL PERMITS AND POST ALL REQUIRED BONDS.
2. CONTRACTOR SHALL KEEP & MAINTAIN A COPY OF THE VIRGINIA EROSION & SEDIMENT CONTROL
HAND-BOOK, LATEST EDITION ON-SITE AT ALL TIMES.
3. INSTALL PERIMETER SILT FENCE AND TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT. TEMPORARY
EROSION CONTROL MEASURES MUST BE INSTALLED PRIOR TO ALL LAND DISTURBING ACTIVITIES.
4. ALL SPECIFIC LOCATIONS FOR SILT FENCE OR STONE CHECK DAMS ARE NOT SHOWN ON THE APPROVED
PLANS. THE NEED FOR ADDITIONAL E&S CONTROL MEASURES IS TO BE DETERMINED IN THE FIELD BY THE
PROJECT ENGINEER AND THE EROSION CONTROL DIRECTOR.
5. INSTALL BLANKET MATTING AND RIP-RAP IN DITCHES AND ON STEEP SLOPES PER DETAILS.
6. TEMPORARY SEEDING SHALL OCCUR AS CONSTRUCTION PROGRESSES. NO SECTION OF DISTURBANCE
LONGER THAN 1000' SHALL BE LEFT UNSEEDED. TEMPORARY SEEDING SHALL COMPLY W/ DEQ.
7. REMOVE EROSION AND SEDIMENT CONTROL MEASURES UPON SITE STABILIZATION.
8. CONTRACTOR IS RESPONSIBLE FOR ALL MAINTENANCE MEASURES UNTIL THE SITE IS STABILIZED.
9. ALL DENUDED AREAS SHALL BE SHAPED TO PROMOTE POSITIVE DRAINAGE.
GRADING NOTES:
1. CONTRACTOR SHALL COORDINATE WORK WITH OTHER CONTRACTOR(S) ON-SITE.
2. ALL SPOT ELEVATIONS REFLECT FINISHED ELEVATIONS. SUBGRADE ELEVATIONS SHALL BE
DETERMINED FROM INDIVIDUAL SECTION DETAILS.
3. CONTRACTOR SHALL PROTECT THE PUBLIC AT ALL COST FROM CONSTRUCTION ACTIVITIES
WITH FENCES, BARRICADES, ENCLOSURES, AND OTHER BEST MANAGEMENT PRACTICES.
4. CONTRACTOR TO VERIFY LOCATION OF ALL UNDERGROUND UTILITIES BEFORE SITE WORK
MAY BEGIN. CONTRACTOR IS RESPONSIBLE FOR REPLACING ANY DAMAGED UTILITIES.
5. CONTRACTOR SHALL FIELD VERIFY ELEVATIONS AND TIE OUT AT 2.5:1 SLOPE EXCEPT AT
TEMPORARY CONSTRUCTION PAD IN THE STREAM.
6. CONTRACTOR SHALL REPAIR ANY AND ALL AREAS DAMAGED BY SITE WORK AND
TRANSPORTATION.
7. ALL TEMPORARY CONSTRUCTION AREAS SHALL BE RESTORED TO PRE-DEVELOPMENT
CONDITION UPON COMPLETION OF CONSTRUCTION.
LIMITS OF
CONSTRUCTION
SILT FENCE,
VA. E&S STD. 3.05
TEMPORARY SEEDING,
VA. E&S STD. 3.31
PERMANENT SEEDING,
VA. E&S STD. 3.32
SOIL STABILIZATION BLANKETS AND MATTING,
VA. E&S STD. 3.36
E&S LEGEND
LIMITS OF DISTURBANCE
TOTAL LAND DISTURBANCE = 1.27 ACRES
NOTE: ACCORDING TO DOCUMENTS OBTAINED FROM FEMA, THIS PROJECT IS A RESTORATION
OF PRE-DISASTER CONDITIONS. NO UPGRADES ARE INCLUDED IN THE SITE DESIGN.
R
IN
G G
O
LD
R A
IL
T
R A
IL
P
E D
E S
TR
IA
N B
R
ID
G E
S U
P E
R S
TR
U
C
TU
R E
R E
P
LA
C E
M E
N T
A N
D S
U B
S
TR
U C
TU
R
E M
O D
IF
IC
A
TI
O N
P
IT
TS
Y
LV
A
N
IA
C O
U N
TY
R
IN
G G
O
LD
, V
IR
G
IN
IA
STRUCTURAL STREAMBANK STABILIZATION,
VA. E&S STD. 3.23
WETLAND WB
(TO BE PLANTED WITH WOODY
VEGETATION, SEE
PLANTING DETAIL ON SHEET C201)
WETLAND WA
(TO BE PLANTED WITH
HERBACEOUS WETLAND
SEED MIX)
NOTE: “CRANE/CONSTRUCTION PAD SHOWN FOR ILLUSTRATION AND PERMITTING PURPOSES ONLY.
THIS PAD IS CONSIDERED A DESIGN-BUILD ITEM AND THE CONTRACTOR IS RESPONSIBLE FOR ALL ASPECTS OF CONSTRUCTION WITHIN THE PERMITTED AREA SHOWN ON THE DRAWINGS. CONTRACTOR SHALL REMOVE AFTER CONSTRUCTION AND RESTORE AREA TO ORIGINAL CONDITIONS. CONTRACTOR
SHALL NOTIFY ENGINEER IMMEDIATELY IF ANY DISCREPANCIES ARE NOTED.”
CONTRACTOR SHALL INSTALL BANK
STABILIZATION MEASURES AS
NEEDED IN THIS LOCATION.
TEMPORARY BRIDGE CROSSING,
VA. E&S STD. 3.24
WETLAND WA
RIPRAP,
VA. E&S STD. 3.19
CONSTRUCTION ENTRANCE,
VA. E&S STD. 3.02
ACCESS ROAD TO BE REMOVED AND
RESTORED TO EXISTING CONDITIONS
AFTER CONSTRUCTION
CONSTRUCTION PAD TO BE REMOVED
AND RESTORED TO EXISTING
CONDITIONS AFTER CONSTRUCTION
LOUIS H. DALTON
PIN : 2368-03-5951
DONALD W. AND FRANCES E. WILES
PIN : 2358-83-2440
RICHARD L., JR. AND MARY JO W. SOWERS
PIN : 2358-84-4492
CLOVERDALE LUMBER CO INC
PIN : 2368-02-4887
CLOVERDALE LUMBER CO INC
PIN : 2358-81-6739
1 1
AutoCAD SHX Text
NLS
AutoCAD SHX Text
PIER
AutoCAD SHX Text
BENCH
AutoCAD SHX Text
EDGE OF
AutoCAD SHX Text
48" WOV
AutoCAD SHX Text
PIER
AutoCAD SHX Text
PIER
AutoCAD SHX Text
STREAM
AutoCAD SHX Text
RAILROAD TRESTLE / WALK TRAIL BRIDGE
AutoCAD SHX Text
5' VINYL FENCE ON BALLAST CRADLE
AutoCAD SHX Text
48" WOV
AutoCAD SHX Text
6"X6" WOOD 2 MILE MARKER POST
AutoCAD SHX Text
ABUTMENT
AutoCAD SHX Text
ABUTMENT
AutoCAD SHX Text N:3383237.386
AutoCAD SHX Text E:11259595.850
AutoCAD SHX Text
ELEV:461.92
AutoCAD SHX Text 60d NAIL SET
AutoCAD SHX Text CONTROL POINT No. 1
AutoCAD SHX Text N:3383209.534
AutoCAD SHX Text E:11259513.320
AutoCAD SHX Text
ELEV:461.96
AutoCAD SHX Text N:3383287.191
AutoCAD SHX Text E:11259751.213
AutoCAD SHX Text
ELEV:460.15
AutoCAD SHX Text 60d NAIL SET
AutoCAD SHX Text CONTROL POINT No. 2
AutoCAD SHX Text
BENCH
AutoCAD SHX Text 60d NAIL SET
AutoCAD SHX Text CONTROL POINT No. 50
AutoCAD SHX Text
48" WOV
AutoCAD SHX Text
48" WOV
AutoCAD SHX Text
PILING COFFER DAM
AutoCAD SHX Text
STREAM
AutoCAD SHX Text
STREAM
AutoCAD SHX Text
STREAM
AutoCAD SHX Text
STREAM
AutoCAD SHX Text
5' VINYL FENCE ON BALLAST CRADLE
AutoCAD SHX Text
EOG
AutoCAD SHX Text
EOG
AutoCAD SHX Text
EOG
AutoCAD SHX Text
EOG
AutoCAD SHX Text
BENCH MARK: NGS MONUMENT FY0762 ELEVATION = 462.69 SEE NOTE 2
AutoCAD SHX Text
RIP RAP
AutoCAD SHX Text
TRV#6049
AutoCAD SHX Text
ELEV=465.50
AutoCAD SHX Text
TRV#6128
AutoCAD SHX Text
ELEV=468.28
AutoCAD SHX Text
RAIL TRAIL
AutoCAD SHX Text
EOG
AutoCAD SHX Text
EOG
AutoCAD SHX Text
DIRT TRAIL
AutoCAD SHX Text
DIRT TRAIL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NLS
AutoCAD SHX Text
PIER
AutoCAD SHX Text
BENCH
AutoCAD SHX Text
EDGE OF
AutoCAD SHX Text
48" WOV
AutoCAD SHX Text
PIER
AutoCAD SHX Text
PIER
AutoCAD SHX Text
STREAM
AutoCAD SHX Text
RAILROAD TRESTLE / WALK TRAIL BRIDGE
AutoCAD SHX Text
5' VINYL FENCE ON BALLAST CRADLE
AutoCAD SHX Text
48" WOV
AutoCAD SHX Text
6"X6" WOOD 2 MILE MARKER POST
AutoCAD SHX Text
ABUTMENT
AutoCAD SHX Text
ABUTMENT
AutoCAD SHX Text N:3383237.386
AutoCAD SHX Text E:11259595.850
AutoCAD SHX Text
ELEV:461.92
AutoCAD SHX Text 60d NAIL SET
AutoCAD SHX Text CONTROL POINT No. 1
AutoCAD SHX Text N:3383209.534
AutoCAD SHX Text E:11259513.320
AutoCAD SHX Text
ELEV:461.96
AutoCAD SHX Text N:3383287.191
AutoCAD SHX Text E:11259751.213
AutoCAD SHX Text
ELEV:460.15
AutoCAD SHX Text 60d NAIL SET
AutoCAD SHX Text CONTROL POINT No. 2
AutoCAD SHX Text
BENCH
AutoCAD SHX Text 60d NAIL SET
AutoCAD SHX Text CONTROL POINT No. 50
AutoCAD SHX Text
48" WOV
AutoCAD SHX Text
48" WOV
AutoCAD SHX Text
PILING COFFER DAM
AutoCAD SHX Text
STREAM
AutoCAD SHX Text
STREAM
AutoCAD SHX Text
STREAM
AutoCAD SHX Text
STREAM
AutoCAD SHX Text
5' VINYL FENCE ON BALLAST CRADLE
AutoCAD SHX Text
EOG
AutoCAD SHX Text
EOG
AutoCAD SHX Text
EOG
AutoCAD SHX Text
EOG
AutoCAD SHX Text
BENCH MARK: NGS MONUMENT FY0762 ELEVATION = 462.69 SEE NOTE 2
AutoCAD SHX Text
RIP RAP
AutoCAD SHX Text
TRV#6049
AutoCAD SHX Text
ELEV=465.50
AutoCAD SHX Text
TRV#6128
AutoCAD SHX Text
ELEV=468.28
AutoCAD SHX Text
RAIL TRAIL
AutoCAD SHX Text
EOG
AutoCAD SHX Text
EOG
AutoCAD SHX Text
DIRT TRAIL
AutoCAD SHX Text
DIRT TRAIL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NLS
AutoCAD SHX Text
PIER
AutoCAD SHX Text
BENCH
AutoCAD SHX Text
EDGE OF
AutoCAD SHX Text
48" WOV
AutoCAD SHX Text
PIER
AutoCAD SHX Text
PIER
AutoCAD SHX Text
STREAM
AutoCAD SHX Text
RAILROAD TRESTLE / WALK TRAIL BRIDGE
AutoCAD SHX Text
5' VINYL FENCE ON BALLAST CRADLE
AutoCAD SHX Text
48" WOV
AutoCAD SHX Text
6"X6" WOOD 2 MILE MARKER POST
AutoCAD SHX Text
ABUTMENT
AutoCAD SHX Text
ABUTMENT
AutoCAD SHX Text N:3383237.386
AutoCAD SHX Text E:11259595.850
AutoCAD SHX Text
ELEV:461.92
AutoCAD SHX Text 60d NAIL SET
AutoCAD SHX Text CONTROL POINT No. 1
AutoCAD SHX Text N:3383209.534
AutoCAD SHX Text E:11259513.320
AutoCAD SHX Text
ELEV:461.96
AutoCAD SHX Text N:3383287.191
AutoCAD SHX Text E:11259751.213
AutoCAD SHX Text
ELEV:460.15
AutoCAD SHX Text 60d NAIL SET
AutoCAD SHX Text CONTROL POINT No. 2
AutoCAD SHX Text
BENCH
AutoCAD SHX Text 60d NAIL SET
AutoCAD SHX Text CONTROL POINT No. 50
AutoCAD SHX Text
48" WOV
AutoCAD SHX Text
48" WOV
AutoCAD SHX Text
PILING COFFER DAM
AutoCAD SHX Text
STREAM
AutoCAD SHX Text
STREAM
AutoCAD SHX Text
STREAM
AutoCAD SHX Text
STREAM
AutoCAD SHX Text
5' VINYL FENCE ON BALLAST CRADLE
AutoCAD SHX Text
EOG
AutoCAD SHX Text
EOG
AutoCAD SHX Text
EOG
AutoCAD SHX Text
EOG
AutoCAD SHX Text
BENCH MARK: NGS MONUMENT FY0762 ELEVATION = 462.69 SEE NOTE 2
AutoCAD SHX Text
RIP RAP
AutoCAD SHX Text
TRV#6049
AutoCAD SHX Text
ELEV=465.50
AutoCAD SHX Text
TRV#6128
AutoCAD SHX Text
ELEV=468.28
AutoCAD SHX Text
RAIL TRAIL
AutoCAD SHX Text
EOG
AutoCAD SHX Text
EOG
AutoCAD SHX Text
DIRT TRAIL
AutoCAD SHX Text
DIRT TRAIL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text No.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
BY
AutoCAD SHX Text Description
AutoCAD SHX Text 02/11/2021
AutoCAD SHX Text 50106038
AutoCAD SHX Text
JSS
AutoCAD SHX Text
MAT
AutoCAD SHX Text
AutoCAD SHX Text 4/11/2022
AutoCAD SHX Text
JSS
AutoCAD SHX Text County Comments
AutoCAD SHX Text
AutoCAD SHX Text 5/11/2022
AutoCAD SHX Text
JSS
AutoCAD SHX Text DEQ Comments
AutoCAD SHX Text
AutoCAD SHX Text 5/26/2022
AutoCAD SHX Text
JSS
AutoCAD SHX Text DEQ Comments
AutoCAD SHX Text
AutoCAD SHX Text 10/19/2022
AutoCAD SHX Text
JSS
AutoCAD SHX Text DEQ Comments
AutoCAD SHX Text
EROSION & SEDIMENT CONTROL NOTES:
AutoCAD SHX Text
SF
AutoCAD SHX Text
TS
AutoCAD SHX Text
PS
AutoCAD SHX Text
BM
AutoCAD SHX Text
SF
AutoCAD SHX Text
SF
AutoCAD SHX Text
TS
AutoCAD SHX Text
PS
AutoCAD SHX Text
BM
AutoCAD SHX Text
TS
AutoCAD SHX Text
PS
AutoCAD SHX Text
BM
AutoCAD SHX Text
SSS
AutoCAD SHX Text
SC
AutoCAD SHX Text
SC
AutoCAD SHX Text
SSS
AutoCAD SHX Text
RR
AutoCAD SHX Text
RR
AutoCAD SHX Text
RR
AutoCAD SHX Text
RR
AutoCAD SHX Text
RR
AutoCAD SHX Text
SF
AutoCAD SHX Text
SF
AutoCAD SHX Text
CE
CE
C
B
A
SHEET NO.
KEY PLAN
SEAL
SCALE
D
E
APPROVED BY
CHECKED BY
REVISIONS
TITLE
DRAWN BY
DATE
PROJECT NO.
Dewberry Engineers Inc.
551 Piney Forest Road Danville ,VA 24540 Phone: 434.797.4497 Fax: 434.797.4341
C111
30'0' 15' 60'
SCALE: 1" = 30'
RESTORATION
PLAN
RESTORATION NOTES:
1. CONTRACTOR SHALL COORDINATE WORK WITH OTHER CONTRACTOR(S) ON-SITE.
2. ALL SPOT ELEVATIONS REFLECT FINISHED ELEVATIONS. SUBGRADE ELEVATIONS SHALL BE
DETERMINED FROM INDIVIDUAL SECTION DETAILS.
3. CONTRACTOR SHALL PROTECT THE PUBLIC AT ALL COST FROM CONSTRUCTION ACTIVITIES
WITH FENCES, BARRICADES, ENCLOSURES, AND OTHER BEST MANAGEMENT PRACTICES.
4. AREAS SHOWN TO BE RESTORED TO A FORESTED CONDITION, BUT NOT RECORDED IN A
FORESTED / OPEN SPACE CONDITION, WILL BE PLANTED WITH PINES. SEE DETAIL SHEETS
FOR PLANTING DETAILS.
5. IN AREAS WHERE THERE MAY HAVE BEEN INADVERTENT SOIL COMPACTION, SOIL SHALL BE
TILLED AND RESTORED TO A HYDROLOGICALLY FUNCTIONAL CONDITION.
6. CONTRACTOR SHALL REPAIR ANY AND ALL AREAS DAMAGED BY SITE WORK AND
TRANSPORTATION.
7. ALL TEMPORARY CONSTRUCTION AREAS SHALL BE RESTORED TO PRE-DEVELOPMENT
CONDITION UPON COMPLETION OF CONSTRUCTION.
LIMITS OF
CONSTRUCTION
RESTORATION LEGEND
NOTE: ACCORDING TO DOCUMENTS OBTAINED FROM FEMA, THIS PROJECT IS A RESTORATION
OF PRE-DISASTER CONDITIONS. NO UPGRADES ARE INCLUDED IN THE SITE DESIGN.
R
IN
G G
O
LD
R A
IL
T
R A
IL
P
E D
E S
TR
IA
N B
R
ID
G E
S U
P E
R S
TR
U
C
TU
R E
R E
P
LA
C E
M E
N T
A N
D S
U B
S
TR
U C
TU
R
E M
O D
IF
IC
A
TI
O N
P
IT
TS
Y
LV
A
N
IA
C O
U N
TY
R
IN
G G
O
LD
, V
IR
G
IN
IA
STRUCTURAL STREAMBANK STABILIZATION,
VA. E&S STD. 3.23
WETLAND WB
(TO BE PLANTED WITH WOODY
VEGETATION, SEE
PLANTING DETAIL ON SHEET C201)
WETLAND WA
(TO BE PLANTED WITH
HERBACEOUS WETLAND
SEED MIX)
CONTRACTOR SHALL INSTALL BANK
STABILIZATION MEASURES AS
NEEDED IN THIS LOCATION.
WETLAND WA
RIPRAP,
VA. E&S STD. 3.19
ACCESS ROAD TO BE REMOVED AND
RESTORED TO EXISTING CONDITIONS
AFTER CONSTRUCTION
LOUIS H. DALTON
PIN : 2368-03-5951
DONALD W. AND FRANCES E. WILES
PIN : 2358-83-2440
RICHARD L., JR. AND MARY JO W. SOWERS
PIN : 2358-84-4492
CLOVERDALE LUMBER CO INC
PIN : 2368-02-4887
CLOVERDALE LUMBER CO INC
PIN : 2358-81-6739
REPLANT TREES
KEY
DRAINAGE AREAS
Tc FLOW PATH
DA-A
0.7549 ACRES
DA-B
0.5157 ACRES
PLANTING LIST (TREES)
Qty. Botanical/Common Name
Height at Maturity (Feet)
Width at Maturity (Feet)
Acer rubrum/Red
Maple 40-60 40
Liquidamber styraciflua/Sweet Gum
60-75 40-50
8 Betula nigra/River Birch 40-70 40-60
15 Pinus taeda/Loblolly Pine 60-90 25-35
Ostrya virginiana/American Hornbeam
20-40 20-30
H
AutoCAD SHX Text
NLS
AutoCAD SHX Text
PIER
AutoCAD SHX Text
BENCH
AutoCAD SHX Text
EDGE OF
AutoCAD SHX Text
48" WOV
AutoCAD SHX Text
PIER
AutoCAD SHX Text
PIER
AutoCAD SHX Text
STREAM
AutoCAD SHX Text
RAILROAD TRESTLE / WALK TRAIL BRIDGE
AutoCAD SHX Text
5' VINYL FENCE ON BALLAST CRADLE
AutoCAD SHX Text
48" WOV
AutoCAD SHX Text
6"X6" WOOD 2 MILE MARKER POST
AutoCAD SHX Text
ABUTMENT
AutoCAD SHX Text
ABUTMENT
AutoCAD SHX Text N:3383237.386
AutoCAD SHX Text E:11259595.850
AutoCAD SHX Text
ELEV:461.92
AutoCAD SHX Text 60d NAIL SET
AutoCAD SHX Text CONTROL POINT No. 1
AutoCAD SHX Text N:3383209.534
AutoCAD SHX Text E:11259513.320
AutoCAD SHX Text
ELEV:461.96
AutoCAD SHX Text N:3383287.191
AutoCAD SHX Text E:11259751.213
AutoCAD SHX Text
ELEV:460.15
AutoCAD…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .