RFQ MSP Terminal 1 EMC BP#1 Enabling Work
Open State & local contract opportunity Posted
- Solicitation number
- Solicitation225
- State
- Minnesota
- Responses due
Opportunity facts
- Jurisdiction
Opportunity details come from metroairports.bonfirehub.com. Updated .
About this opportunity
J.E. Dunn Construction Company, serving as Construction Manager at Risk for the Metropolitan Airports Commission, is soliciting Request for Qualifications responses to prequalify contractors for Bid Package #1 enabling work on the MSP Terminal 1 Energy Management Center project, with responses due December 15, 2026 at 1:00 p.m. CST. Prequalification is the gating filter: contractors must prequalify across seven scopes (Cast-in-Place Concrete, Aircraft Fueling System, Electrical, Low Voltage, Earthwork & Site Utilities, Site Concrete Paving, and Passenger Boarding Bridges) through TradeTapp by BuildingConnected, in addition to completing the RFQ package.
Small Business participation goals are set at 3-5%, with final goals to be provided in subsequent bidding documents. The contractor requests active solicitation of minority contractors, suppliers, and other organizations. The project requires prevailing wages and a project labor agreement covering all on-site labor. Portions of the project may be exempt from state sales and use tax, with details to follow in bidding documents.
The scope is civil airside enabling work supporting the Terminal 1 Boiler & Chiller Plant Replacement, the Energy Management Center, and the C Concourse expansion. The work relocates and replaces utilities beneath the aircraft parking apron at Gates C6-C11 in phases, closing no more than three gates at a time and scheduling required service interruptions at night. Key elements include relocating aircraft fueling systems, jet fuel piping, hydrant pits, and isolation valve pits; removing and replacing two 12,000-gallon underground fuel storage tanks while maintaining backup fuel supply until the new system is operational; relocating electrical duct, cable, fiber, and water service; installing new storm sewer piping; replacing portions of approximately 25,000 square yards of 12-inch and 18-inch concrete apron pavement, including temporary pavement for phasing; restoring pavement markings; and replacing the Passenger Boarding Bridge at C12 with foundations and MEP services. The architect is The Alliance Inc DBA Alliance, and the civil engineer is TKDA.
Place of performance is 4300 Glumack Drive, St. Paul, Minnesota, in Hennepin County. Bid selection, according to the solicitation, considers qualifications, price, and Small Business participation.
Prequalification notices go out December 22, 2026, bidding documents issue December 23, 2026, and the anticipated bid date is January 19, 2027. Construction is anticipated to commence April 15, 2027. Prequalification inquiries go to Jim Westlund at J.E. Dunn Construction, 952-833-5949 or Jim.Westlund@jedunn.com.
Opportunity text
Request for Qualifications for Bid Package #1 - Enabling scope consists of Civil Airside Enabling work supporting the Terminal 1 Boiler & Chiller Plant Replacement, Energy Management Center (EMC), and C Concourse expansion. This phased relocation and replacement of existing utilities beneath the aircraft parking apron at Gates C6-C11 while maintaining airport operations and limiting closures to no more than three gates at a time. Work includes relocating the aircraft fueling systems, jet fuel piping, hydrant pits, and isolation valve pits; removing and replacing two 12,000-gallon underground fuel storage tanks while maintaining the existing backup fuel supply until the new system is operational; relocation of electrical duct, cable, and fiber; new storm sewer piping, cleaning, and sealing; relocation of water service; removing and replacing portions of approximately 25,000 square yards of 12-inch and 18-inch concrete aircraft apron pavement, including temporary pavement needed to support construction phasing; and restoring aircraft parking and ground-support-equipment pavement markings; and replacement of the new Passenger Boarding Bridge at C12 with foundations and MEP services. The work will preserve uninterrupted utility service to active gates, with required service interruptions occurring at night, and will maintain the existing aircraft parking and passenger boarding bridge configuration until subsequent EMC and Concourse C construction reconfigures the gates.
Files
| File | Type | Posted |
|---|---|---|
| 1-001115 - MSP EMC BP1 - RFQ Invitation 11.23.26.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity