This Request for Qualifications (RFQ) is issued by J.E. Dunn Construction Company, serving as Construction Manager at Risk, on behalf of the Metropolitan Airports Commission (owner) for the MAC – MSP Terminal 1 Energy Management Center (EMC) project located at 4300 Glumack Drive, St. Paul, Minnesota. The project involves Bid Package #1 Enabling Work consisting of civil airside enabling scope to support Terminal 1 Boiler & Chiller Plant Replacement, Energy Management Center construction, and C Concourse expansion. The work encompasses phased relocation and replacement of existing utilities beneath the aircraft parking apron at Gates C6-C12, including aircraft fueling system relocation, removal and replacement of two 12,000-gallon underground fuel storage tanks, electrical duct and cable relocation, storm sewer piping work, water service relocation, removal and replacement of approximately 25,000 square yards of concrete aircraft apron pavement, and replacement of the Passenger Boarding Bridge at C12. Contractors must prequalify across seven scopes of work: Cast-in-Place Concrete, Aircraft Fueling System, Electrical, Low Voltage, Earthwork & Site Utilities, Site Concrete Paving, and Passenger Boarding Bridges. Prequalification requires submission of information through the TradeTapp by BuildingConnected online system and completion of the RFQ package, with responses due December 15, 2026 at 1:00 p.m. CST. Anticipated notification of prequalified companies is December 22, 2026, with bidding documents to be issued December 23, 2026 and an anticipated bid date of January 19, 2027. Construction is anticipated to commence April 15, 2027.
The project requires prevailing wages and includes a project labor agreement applicable to all on-site labor. Small Business participation goals are established at 3–5%, with final goals to be provided in subsequent bidding documents. The contractor requests active solicitation of minority contractors, suppliers, and other organizations, with bid selection potentially based on qualifications, price, and Small Business participation. Portions of the project may be exempt from state sales and use tax, with additional details to be provided in future bidding documents. All prequalification inquiries should be directed to Jim Westlund at J.E. Dunn Construction at 952-833-5949 or Jim.Westlund@jedunn.com, with the architect identified as The Alliance Inc DBA Alliance and the civil engineer as TKDA.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PART 1 - GENERAL
1.1 PROJECT INFORMATION
A. NOTICE TO BIDDERS: J.E. Dunn Construction Company, hereafter referred as the Construction Manager at Risk, is Requesting for Qualifications for the following project described below and requests for your interest on bidding on the project. The following list highlights information associated with the Project that may be helpful in your prequalification process.
B. PROJECT: MAC - MSP T1 Energy Management Center (EMC) (Project No. 26023100) C. PROJECT LOCATION: 4300 Glumack Drive
St. Paul, MN 55111
D. OWNER: METROPOLITAN AIRPORTS COMMISSION
E. ARCHITECT: THE ALLIANCE INC DBA ALLIIANCE, 400 CLIFTON AVE
MINNEAPOLIS, MN 55403-3212
F. CONTRACTOR: J.E. Dunn Construction Company, 800 Washington Ave North, Suite
Minneapolis, MN 55401
G. PROJECT DESCRIPTION: This upcoming Bid Package #1 – Enabling scope consists of Civil Airside Enabling work supporting the Terminal 1 Boiler & Chiller Plant Replacement, Energy Management Center (EMC), and C Concourse expansion. This phased relocation and replacement of existing utilities beneath the aircraft parking apron at Gates C6-C12 while maintaining airport operations and limiting closures to no more than three gates at a time. Work includes relocating the aircraft fueling systems, jet fuel piping, hydrant pits, and isolation valve pits; removing and replacing two 12,000-gallon underground fuel storage tanks while maintaining the existing backup fuel supply until the new system is operational; relocation of electrical duct, cable, and fiber; new storm sewer piping, cleaning, and sealing; relocation of water service; removing and replacing portions of approximately 25,000 square yards of 12-inch and 18-inch concrete aircraft apron pavement, including temporary pavement needed to support construction phasing;
and restoring aircraft parking and ground-support-equipment pavement markings; and replacement of the new Passenger Boarding Bridge at C12 with foundations and MEP services. The work will preserve uninterrupted utility service to active gates, with required service interruptions occurring at night, and will maintain the existing aircraft parking and passenger boarding bridge configuration until subsequent EMC and C Concourse construction reconfigures the gates.
H. BID PACKAGE: Bid Package #1 - Enabling Work I. SCOPES OF WORK: JE Dunn will be prequalifying for the following Scopes of Work:
1. Scope of Work 03 - Cast-in-Place Concrete
2. Scope of Work 24 - Aircraft Fueling System
3. Scope of Work 26 - Electrical
4. Scope of Work 27 - Low Voltage
5. Scope of Work 31 - Earthwork & Site Utilities
SECTION 00 11 15
REQUEST FOR QUALIFICATIONS
MAC - MSP T1 Energy Management Center (EMC) 11/20/2026
Section 00 11 15 - REQUEST FOR QUALIFICATIONS Page 1 Div 00 Procurement and Contracting Requirements
CIVL ENGINEER: TKDA 3311 E Old Shakopee Road, Suite 300, BLOOMINGTON MN 55425
6. Scope of Work 32 - Site Concrete Paving
7. Scope of Work 34 - Passenger Boarding Bridges
1.2 REQUEST FOR QUALIFICATIONS
A. REQUEST FOR QUALIFICATIONS: For Contractors to be qualified to bid on the project listed above the following steps need to be performed:
1. To be qualified to perform the Work described in the Bidding Documents, the Bidder must submit and/or update the necessary information on Construction Manager's online Subcontractor Management System located at TradeTapp by BuildingConnected (BC) https://jedunn.com/trade-partners/ .
2. Upon Completing item #1, Notify JE Dunn Construction at Jim.Westlund@jedunn.com, a request a copy of the Bid Package #1 – Enabling Work “Request for Qualifications” package to be filled out by the Trade Partner and submitted to JE Dunn by the due date.
3. Due Date: December 15, 2026 at 1:00 pm CST.
B. BID DOCUMENTS:
1. Bidding documents are not available at this time, they will be forthcoming and issued by JE Dunn Construction to prequalified bidders during the Bidding Period.
C. Bid Schedule
EVENT DATE
Issue RFQ November 23, 2026
RFQ Responses Due December 15, 2026
Anticipated Notification of Prequalified Companies
December 22, 2026
Anticipated Contract Bidding Documents Issued
December 23, 2026
Anticipated Bid Date for Prequalified Companies
January 19, 2027
Anticipated Construction Start April 15, 2027
1.3 PROJECT HIGHLIGHTS
A. PREVAILING WAGES: Prevailing wages are required on this Project.
B. PROJECT LABOR AGREEMENT: This project will contain a project labor agreement.
All labor performed on site will be the requirement of the Project Labor Agreement.
C. SMALL BUSINESS DBE/SBE/WBE GOALS: Goals are required on this Project and are the following percentage 3-5%. Final Goal to be providing in the bidding documents.
Section 00 11 15 - REQUEST FOR QUALIFICATIONS Page 2 Div 00 Procurement and Contracting Requirements
April 1, 2027 https://jedunn.com/trade-partners/
Contractor requests that Bidders actively solicit participation from minority contractors, suppliers, and other organizations. Bids could be selected based upon the combination of qualifications, price, and Small Business participation.
D. TAXES/EXEMPTIONS: Portions of this Project may be exempt from state sales and use tax. More information to be provided in the future bidding documents.
PART 2 - CONTACT INFORMATION
2.1 QUESTIONS:
A. All questions regarding the prequalification process should be directed to the Construction Manager, please contact Jim Westlund at 952-833-5949 or Jim.Westlund@jedunn.com.
Section 00 11 15 - REQUEST FOR QUALIFICATIONS Page 3 Div 00 Procurement and Contracting Requirements