Johnson County Wastewater (JCW), Johnson County, Kansas, is seeking statements of qualifications (SOQs) from construction manager at risk (CMAR) firms or teams for the Middle Basin Wastewater Digester & Solids Improvement Project (IMB1-C040), with SOQs due December 18, 2026. The RFQ, posted November 18, 2026 as 2026-043, is attached as a PDF.

The CMAR will supplement JCW's Design Engineer with design-phase engineering assistance and develop the cost model that becomes the basis for the Guaranteed Maximum Price (GMP), which is anticipated to be finalized around 90% design. The project follows a two-phase format. Phase 1 covers preconstruction services and GMP development with JCW and the Design Engineer. Phase 2 construction continues only if the GMP is favorable, and JCW must seek BOCC approval to amend the agreement before advancing.

Multiple GMPs may be allowed if mutually agreeable, the schedule allows, and they benefit the project. If a satisfactory GMP cannot be reached, JCW may off-ramp the project, continue design services to 100% design, and issue a separate hard-bid for the work.

Opportunity text

JCW is seeking SOQs from qualified CMAR firms (or CMAR teams) to supplement JCWs Design Engineer with assistance during design phase engineering services and develop the cost model that becomes the basis for the Guaranteed Maximum Price (GMP). The Construction Manager will follow a two-phase format. In Phase 1, the Construction Manager will be responsible for working with JCW and the Design Engineer to provide pre construction services and reach an agreeable GMP anticipated to be finalized around 90% design. Multiple GMPs may be allowed assuming they are mutually agreeable, that schedule allows, and that benefit the project. Depending on the cost and the progress of the project, if the GMP is favorable then JCW will seek BOCC approval to amend the agreement and continue into the Phase 2 construction phase with the Construction Manager. If a satisfactory GMP cannot be reached, JCW may elect to off-ramp the project and continue design services to 100% design and issue a separate hard-bid for the project.

Files

File Type Posted
2026-043 RFQ Document Final.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors