RFP#2022-81 Engineering Services for the Tri-City WRRF Influent Pump Station Expansion Project
Closed State & local contract opportunity Posted
- Solicitation number
- S-C01010-00004119
- State
- Oregon
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 90735 Designing Services
- 92064 System Implementation And Engineering Services
- 92517 Civil Engineering
- 92528 Drainage Engineering
- 92533 Engineer Services, Professional
- 92536 Engineering Services (Not Otherwise Classified)
- 92583 Sanitary Engineering
- 92587 Sewage Collection, Treatment, And Disposal/Engineering
- UNSPSC codes
- 81101500 Civil engineering
- 81111500 Software or hardware engineering
- 81102501 Mine permitting service
- 81101607 Textile engineering service
- 81103406 Conceptual Studies and Pre-Front-end engineering design services
- 81000000 Engineering and Research and Technology Based Services
- 81100000 Professional engineering services
- 81102702 Process control system design and engineering service
- 81101531 Sanitation engineering service
- 81101529 Acoustic engineering
Opportunity details come from oregonbuys.gov. Updated .
About this opportunity
Clackamas County Water Environment Services (WES) issued Request for Proposals (RFP) #2022-81 for engineering services to support the Tri-City Water Resource Recovery Facility (WRRF) Influent Pump Station Expansion Project. The primary objective is to replace existing pumps and increase the facility's firm capacity from 50 MGD to 72.6 MGD to accommodate projected 2040 peak hour flows. Engineering services will encompass comprehensive project management, existing system evaluation, preliminary and final design, bid document preparation, and engineering support during construction. Evaluation criteria will focus on the project manager's qualifications, project team composition, firm experience, and overall project understanding and approach. The RFP was originally due on September 15, 2022, but was extended via Addendum 1 to September 21, 2022, at 2:00 PM Pacific Time, with an anticipated contract start date of October 2022. Design work is expected to continue through winter 2023, with construction to follow the design phase. Proposers must be prepared to enter Clackamas County's standard personal services contract, which includes specific insurance and rate requirements.
The capital budget for the project is estimated at $4,500,000, with no specific set-aside designations mentioned in the documentation. Multiple engineering firms submitted proposals, including Kennedy Jenks, Carollo, and Stantec Consulting Services, Inc. The Notice of Intent to Award indicates Carollo as the apparent successful proposer, scoring 88.25 out of 100 points in the evaluation process. The project involves expanding an existing influent pump station located in Clackamas County and Oregon City, which will require integration with current infrastructure documented in original plant record drawings from 1986. The expansion is part of a broader Willamette Facilities Plan that recommends infrastructure improvements to address growth, aging systems, and regulatory requirements through 2040. A 7-calendar day protest period was established following the Notice of Intent to Award, during which unsuccessful proposers may file formal protests to the contract award.
Files
Show all 12
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity