2_2006_MWH_TC IPS VFD and Seismic Improvements.pdf
PDF 18 MB Posted
- Attached to
- RFP#2022-81 Engineering Services for the Tri-City WRRF Influent Pump Station Expansion Project
- Solicitation number
- S-C01010-00004119
- Issued by
- Clackamas County, Oregon
About this file
The document is a technical memorandum for the Mill Way Hydro (MWH) Project, which was an improvement project for the Tri-City Influent Pump Station (IPS) located in Clackamas County and Oregon City, Oregon. The project included the installation of variable frequency drives (VFDs) for the IPS and seismic upgrades to the facility. The technical memorandum provides an overview of the project, outlines the scope of work, and includes supporting exhibits and addenda.
The related state and local contract opportunity is an RFP for engineering services for the Tri-City Water Resource Recovery Facility (WRRF) Influent Pump Station Expansion Project in Clackamas County and Oregon City, Oregon. The RFP seeks proposals for engineering design, construction administration, and other related services for the expansion of the IPS facility. The RFP does not include specific details on pricing, set asides, incumbents, funding sources, or contract term, but indicates that the project will be funded through state and local sources.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .