1_1986_CH2M_Original Plant Record Drawings_IPS.pdf

PDF 5 MB Posted

Attached to
RFP#2022-81 Engineering Services for the Tri-City WRRF Influent Pump Station Expansion Project
Solicitation number
S-C01010-00004119
Issued by
Clackamas County, Oregon

About this file

This document appears to be a set of original plant record drawings for an Influent Pump Station project, related to RFP#2022-81 Engineering Services for the Tri-City WRRF Influent Pump Station Expansion Project issued by Clackamas County and Oregon City in Oregon. The RFP requests engineering services for the expansion of the Tri-City Water Resource Recovery Facility's Influent Pump Station. The project overview and scope of work details are not provided in this document. The RFP response due date, site visit information, and contract award details are also not included in this file.

Pricing terms, set-asides, incumbent information, funding sources and amounts, and other salient contract details are not contained in this record drawing document. This appears to be a technical drawing file provided as background information related to the overall project, but does not contain the full RFP details or contract requirements.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .