RFB Signal Poles for Lincoln Avenue/Pine Drive Operational Improvements (CIP25-018)
Closed State & local contract opportunity Posted
- Solicitation number
- 26-026
- State
- Colorado
- Responses due
Opportunity facts
- Jurisdiction
Opportunity details come from parkeronline.bonfirehub.com. Updated .
About this opportunity
The Town of Parker, Colorado is requesting quotes for two CDOT S-614-40A signal poles and related parts for the Lincoln Avenue/Pine Drive Operational Improvements project (CIP25-018), with quotes due September 30, 2026 at 10:00 a.m.
The scope comprises one pole with a single 45-foot mast arm and one pole without a mast arm; both feature 40-foot luminaire mounting heights and 15-foot luminaire arm lengths. All poles must have hot-dipped galvanized finish per ASTM A123, be painted Federal Green #14056 or an approved equivalent, and include anchor bolts. Anchor bolts must be delivered in a separate shipment prior to pole delivery due to construction phasing requirements. Quotes must include anticipated manufacturing lead-time from approved shop drawings.
Delivery is FOB destination to the Town of Parker's Public Works Operations Center at 9045 Tammy Lane, Parker, Colorado 80134, with offloading assistance provided by the Town. Coordination is required through Chris Hudson, Deputy Director of Engineering at 303-805-3203.
Opportunity text
The Town intends to purchase two (2) traffic signal poles and related parts for the Lincoln Avenue/Pine Drive project.
Files
| File | Type | Posted |
|---|---|---|
| 1-Signal Pole Specifications-Lincoln-Pine-08-31-2026.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity