The City of Menlo Park Public Works Department is soliciting bids for the Reservoir No. 2 Roof Replacement Project under Invitation #2026-110526, with a non-mandatory onsite pre-bid meeting on November 17, 2026 and bids due December 3, 2026 at 2:00 PM PST via electronic submission. Award will be made on a lump-sum basis to qualified roofing and heavy civil engineering contractors. The solicitation carries no set-aside or preference program in the source.

The project replaces the timber, steel, and timber-framed roof structure over Reservoir No. 2 at 3650 Sand Hill Road, Menlo Park. Work includes removing the existing wood and membrane roof, steel superstructure, and precast concrete columns and footings; installing new concrete shear walls, footings, and concrete repairs; and installing a complete aluminum roof system with ladders, walk pads, vents, hatches, and flashing. The scope also covers a new membrane liner, solar-powered mixing equipment with control updates, reservoir cleaning and disinfection, testing and commissioning, site restoration, and minor concrete repairs to the exterior of Reservoir No. 1 at the same site.

Required bonding is a 10 percent bid bond, a 100 percent performance bond, and a 100 percent payment bond. Pre-bid attendance is not required, and the pre-bid meeting takes place at 3674 Sand Hill Road, Woodside, California, at 11:00 AM. Written questions through the online Q&A period are due November 19, 2026 at 4:00 PM PST. Inquiries go to Azalea Mitch at 650-330-6740 or publicworks@menlopark.gov.

Opportunity text

The Reservoir No. 2 Roof Replacement Project will (Project) replace the existing timber steel and timber framed roof structure over the Citys Reservoir No. 2 located at 3650 Sand Hill Road. The Project consists of the removal of the existing wood and membrane roof, steel superstructure, and precast concrete columns/footings; installation of new concrete sheer walls, concrete footings, and various concrete repairs; final design and installation of a complete aluminum roof system with ladders, walk pads, vents, hatches, and flashing; installation of new membrane liner; installation of solar-powered mixing equipment and control updates; reservoir cleaning and disinfection; testing, commissioning, and site restoration. The Project also includes minor concrete repairs to the exterior of Reservoir No. 1, located at the same site

Files

File Type Posted
Bid Notice.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors