Contract for Asbestos Surveys - Demolition of 1606 Greenwood Street
Closed State & local contract opportunity Posted
- Solicitation number
- 2026-19
- State
- Illinois
- Responses due
Opportunity facts
- Jurisdiction
- Points of contact
-
- Lori Bockholdt lbockholdt@cityofaltonil.gov (618) 463-3545
- Jessica Curran jcurran@granitecity.illinois.gov (618) 452-6235
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Granite City Fire Department is requesting proposals for a full Rescue Air Bag Kit under RFP 2026-19, with proposals due August 26, 2026 at 2:00 p.m. The kit must include a master control kit and a full set of various sized rescue air bags; while specifications reference Paratech MultiForce lifting air bags, equivalent equipment from other manufacturers will be considered.
The scope includes dual air chamber lift bags, placement devices, saddlebags, shutoff and inline relief valves, air hoses in multiple colors, a dual deadman controller, and a preset pressure regulator. Lift bag kits must contain multiple bags ranging from 6 inches by 12 inches to 24 inches by 24 inches.
Proposals are evaluated based on total cost and timeline, compliance with specifications and scope, and completeness and clarity of submission. Bidders must provide the total equipment price, cost of warranty and maintenance agreements, and delivery timeline. Proposals may be submitted electronically through the City's BidNet solicitation system or delivered in sealed envelopes to the City Clerk's Office at 2000 Edison Avenue, Granite City, Illinois 62040; late and emailed proposals will not be accepted.
Questions or requests for clarification must be submitted through BidNet or directed via email to Jessica Curran at jcurran@granitecity.illinois.gov. No contract value, term, or set-asides are specified.
Opportunity text
2 versions
Update #2 · Latest ·
When a contractor or licensed inspector conducts an asbestos survey for the City of Alton, the standard scope of work generally includes the following core elements: 1. Pre-Demolition & Pre-Renovation Inspections Comprehensive Material Sampling: Prior to any structural disturbance or demolition, a licensed asbestos inspector must survey the building to identify Asbestos-Containing Building Materials (ACBM). Sample Analysis: The inspector collects physical samples from various areas (e.g., floor tiles, roofing, insulation, drywall, and plaster) and sends them to an accredited laboratory for Polarized Light Microscopy (PLM) testing. 2. Regulatory Compliance & Documentation IEPA Notification: The scope requires completing and submitting the mandatory IEPA 10-Day Notification before any demolition or major abatement work can legally begin. Hazard Assessment Report: Provision of a detailed report specifying the location, quantity, friability, and overall condition of any detected asbestos. 3. Clear Demolition Interfacing Abatement Before Demolition: For municipal bids handled by the city, the scope of work dictates that all asbestos removal must be completed by a licensed environmental firm (such as AC Environmental, a vendor frequently utilized for city clearance) before general demolition contractors are permitted to start structural teardowns
Update #1 ·
The Granite City Fire Department is seeking proposals for a full Rescue Air Bag kit to replace our current rescue air bag system. The kit bid must include a master control kit and full set of various sized rescue air bags listed below. While the item numbers and sizes listed are for Paratech MultiForce lifting air bags, equivalent equipment from other manufactures will also be considered.
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity