Request for Qualifications for Construction Manager at Risk (CMR) Services
Open State & local contract opportunity Posted
- Solicitation number
- BI-MH-139-CMR-2
- State
- Connecticut
- Responses due
Opportunity facts
- Jurisdiction
- UNSPSC codes
- Point of contact
-
- Heather Schlink heather.schlink@ct.gov (860) 280-7411
Opportunity details come from webprocure.proactiscloud.com. Updated .
About this opportunity
The Connecticut Department of Administrative Services (DAS) Construction Services is soliciting Construction Manager at Risk (CMR) qualifications for sprinkler system and related renovations at the Greater Bridgeport Community Mental Health Center, 1635 Central Avenue, Bridgeport, with Quality Based Selection (QBS) submittal booklets due December 3, 2026 at 3:00 p.m. No set-asides or preference programs are identified, and all vendors are eligible to respond. Submittals are a single PDF of no more than 10 megabytes, uploaded through the firm's legal entity CTsource account. Divisions 4 and 5 are mandatory for CMR firms, and firms must demonstrate five similar projects completed on schedule and within budget.
The scope covers a code-compliant fire protection sprinkler system, a new 75 HP fire pump rated at 1,000 gpm, and replacement of the emergency generator with fuel storage. It also includes ceiling and lighting replacement, HVAC and mechanical upgrades for temperature and volume controls, bituminous driveway and curb-cut site work, finish restoration, anti-ligature sprinklers in secure psychiatric client areas, and renovation of the fifth floor as clinical swing space with two temporary office trailers for approximately 26 displaced staff. Work must comply with ASHRAE 170, NFPA 99, NFPA 101 (2012 edition), and JC EC 02.05.01. The facility remains occupied, with phased work coordinated to minimize disruption to inpatient and outpatient services. The RFQ describes an eight-story, 144,000-square-foot building, while the 90 percent narrative report describes nine stories and 123,000 square feet. The narrative also cites a July 5, 2028 Centers for Medicare & Medicaid Services deadline for full sprinkler coverage.
The RFQ lists a project budget of $18.425 million and a 540-calendar-day construction duration. The 90 percent narrative cites an earlier proposed budget of $15.25 million and a revised estimate of $18.07 million, within a range of $15.36 million to $20.78 million. Payment terms are Net 30.
The shortlist phase weights experience with similar work scope and size at 35 points, organizational and team structure at 30, past performance at 20, and partnering experience at 15. The interview phase weights project organization and personnel qualifications at 30 points, project approach and BIM utilization at 20, past CMR performance at 15, schedule performance at 15, experience at 10, and safety record at 10.
A shortlisting meeting is set for December 11, 2026. A mandatory site visit on January 27, 2027 requires registration by the designated start time, and firms that fail to register are deemed ineligible. The RFP is due March 8, 2027, selection interviews are scheduled for April 6, 2027, and a scope review meeting follows on April 27, 2027. Estimated bidding is August 30, 2027, and estimated construction start is February 28, 2028. Conditionally selected firms must submit professional documents, business credentials, and insurance verification within 14 calendar days. Inquiries go to Heather Schlink at heather.schlink@ct.gov. Firms should register on CTsource and reference UNSPSC codes 72000000, 30000000, and 95000000 in their profiles.
Opportunity text
BI-MH-139-CMR-2, GBCMHC - Sprinkler System and Related Renovations, 1635 Central Avenue, Bridgeport CT. The Greater Bridgeport Community Mental Health Center (GBCMHC) is an 8-story mental health facility approximately 144,000 sq. ft. that has roughly 100 in-patients residing within the building full-time as well as out-patient services. GBCMHC provides mental health treatment, food services, administration offices, conference rooms and a pharmacy for its clients. It is a high-rise building, and as such, is required to have an approved working sprinkler system per the Joint Commission which adopted the NFPA Code 101® 2012 edition of the Life Safety Code as well as the NFPA 99® 2012 edition of the Health Care Facilities Code. All work must comply with ASHRAE 170, NFPA 99, and JC EC 02.05.01 The building will remain occupied during construction; the work will be phased and carefully coordinated with facility stakeholders to minimize disruptions. See the RFQ for full details.
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity