BI-MH-139_90 percent CD Phase Drawings.pdf
PDF 36 MB Posted
- Solicitation number
- BI-MH-139-CMR-2
- Issued by
- Fairfield County, Connecticut
About this file
This file contains 90 percent Construction Document (CD) Phase Drawings for project BI-MH-139, representing architectural and engineering design documentation at an advanced stage of development. The drawings illustrate detailed construction specifications and design intent for the project, prepared for review and approval prior to final documentation and construction phases. These CD Phase drawings serve as the technical basis for construction planning, cost estimation, and contractor bidding, providing comprehensive details on building systems, materials, dimensions, and construction methodologies that will guide the subsequent project execution.
The drawings function as a critical deliverable in the design development process, establishing the technical and spatial requirements that will inform project procurement and construction activities. As 90 percent complete documents, these drawings have progressed beyond schematic and design development phases and are substantially ready for permitting, value engineering, and final bid preparation. The specific project scope, timeline milestones, budget information, and procurement details are not evident from the file identifier alone and would require review of the complete project documentation to establish bidding procedures, performance requirements, contract award criteria, and project delivery schedule.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .