Replacement of Pine Tree Drive & Peck Lane Culverts Over Tumble Brook

Open State & local contract opportunity Posted

Solicitation number
L106-0002
State
Connecticut
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The Town of Orange, Connecticut is soliciting sealed bids to replace culverts over Tumble Brook at Pine Tree Drive and Peck Lane, with bids due December 1, 2026 at 10:00 a.m. at the Public Works Department. Bidders must be prequalified by the Connecticut Department of Transportation for Group No. 8 (Minor Bridges Construction) or Group No. 8A (Box Culverts), and the selected contractor must demonstrate good faith effort toward a Small Business Enterprise spending allocation goal of 29.39% and a Minority Business Enterprise spending allocation goal of 15.51%.

The contractor will furnish all labor, materials, tools, equipment, and services to replace the existing culverts with precast concrete box culverts while maintaining the same horizontal alignment. A mandatory site visit is required before bid submission, and bidders are presumed to have inspected existing conditions.

The project carries an estimated $1.952 million in state funding and requires prevailing wages under Connecticut General Statutes Section 31-53. Construction starts April 1, 2027. Peck Lane closes to traffic June 21, 2027 with substantial completion by August 20, 2027, and Pine Tree Drive closes August 23, 2027 with substantial completion targeted for October 29, 2027. All work must be complete by November 30, 2027. Liquidated damages are $7,000 per day for missing the Peck Lane date and $1,500 per day for missing the Pine Tree Road date.

Bid bonds of 5% of the total bid are required, along with 100% performance, payment, and maintenance bonds, with the maintenance bond valid for two years after completion. Progress payments are due within 30 calendar days of approved invoices, with a 5% retainage withheld from all payments except final. Required insurance includes general liability of $1,000,000 per occurrence and $2,000,000 aggregate, and auto liability of $1,000,000 combined single limit, with the Town of Orange named as additional insured on a primary and non-contributory basis. The Board of Selectmen will consider bid awards on December 9, 2026.

Opportunity text

The proposed work on structures included in this contract are assigned the following site designations: Site No. 1 Replacement of Culvert Pine Tree Drive over Tumble Brook Site No. 2 Replacement of Culvert Peck Lane over Tumble Brook.

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors