This is a project manual and bid document for the Town of Orange, Connecticut, for the replacement of culverts over Tumble Brook at two sites: Pine Tree Drive (Site No. 1) and Peck Lane (Site No. 2). The project involves furnishing all labor, materials, tools, equipment, and services necessary to replace existing culverts with precast concrete box culverts while maintaining the same horizontal alignment. The bid notice was advertised on November 2, 2026, with sealed bids due by 10:00 a.m. on December 1, 2026, at the Town Hall Public Works Department. The Board of Selectmen will consider bid awards on December 9, 2026. The contractor must be prequalified by the Connecticut Department of Transportation for Group No. 8 (Minor Bridges Construction) or Group No. 8A (Box Culverts). Construction is scheduled to commence on April 1, 2027, with Peck Lane closing to traffic on June 21, 2027, and substantially completing by August 20, 2027. Pine Tree Drive will close to traffic on August 23, 2027, with substantial completion targeted for October 29, 2027. All work must be completed by November 30, 2027. A mandatory site visit is required before bid submission, with bidders presumed to have inspected existing conditions and familiarized themselves with all specifications.
The project carries an estimated $1,952,000 in state funding with prevailing wage requirements per Connecticut General Statutes Section 31-53. The Small Business Enterprise (SBE) spending allocation goal is 29.39%, and the Minority Business Enterprise (MBE) spending allocation goal is 15.51%; the selected contractor must demonstrate good faith effort to meet these goals. Bid bonds of 5 percent of the total bid are required, along with 100 percent performance bonds, 100 percent payment bonds, and 100 percent maintenance bonds valid for two years after project completion. Progress payments are due within 30 calendar days of approved invoices, with a 5 percent retainer withheld from all payments except final. Liquidated damages are assessed at $7,000 per day for missing the Peck Lane substantial completion date and $1,500 per day for missing the Pine Tree Road substantial completion date. The contractor must maintain general liability insurance of $1,000,000 per occurrence and $2,000,000 aggregate, auto liability of $1,000,000 combined single limit, and name the Town of Orange as an additional insured on a primary and non-contributory basis.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TOWN OF ORANGE
SPECIFICATIONS
FOR THE
REPLACEMENT OF
PINE TREE DRIVE AND
PECK LANE CULVERTS OVER
TUMBLE BROOK
PROJECT NO. L106-0002
TO BE MAINTAINED BY THE TOWN OF ORANGE
FIRST SELECTMAN
JAMES M. ZEOLI
TOWN ENGINEER
ROBERT H. BRINTON, PE
October 30, 2026
PINE TREE DRIVE AND PECK LANE CULVERTS
OVER TUMBLE BROOK
BID CONTRACT DOCUMENTS
TABLE OF CONTENTS
BID NOTICE
BID DOCUMENTS
PAGE
1.0 Introduction 1
2.0 Key Event Dates 1
3.0 Information to Bidders, Bid Forms and Submission Instructions 2
4.0 Time Requirements 4
5.0 Payment 5
6.0 Miscellaneous 5
7.0 Not Used 6
8.0 Termination 6
9.0 Insurance 6
10.0 Securities 7
11.0 Summary of Work 8
PROPOSAL
1. Contractor’s Check List 9
2. Bid Proposal Pages 10
3. Bid Bond 19
4. Certificate as to Corporate Principal 22
5. Form of Surety Guaranty 23
6. Non-Collusion Affidavit of Prime Bidder 24
7. Project References 25
8. Contactor’s Wage Certification Form 26
FORMS
1. Agreement 28
2. Performance Bond 31
3. Payment Bond 33
4. Acknowledgment of Surety Company 35
5. Certification of Non-Arrearage 36
6. Certificate of Waiver and Release of Claims 37
7. Contractor’s Final Payment Release 39
8. Contractor’s Affidavit 40
9. Statement of Surety Company 41
10. Maintenance Bond 42
11. Notice of Award 44
12. Notice to Proceed 45
13. Change Order Form 46
14. Indemnification Certificate 47
SPECIAL PROVISIONS
Contract Time and Liquidated Damages 48
Notice to Contractor – Site Numbers 49
Notice to Contractor –Applicability of Connecticut DOT – Form 819 49
Notice to Contractor – Potential Modified Award Schedule 49
Notice to Contractor – Prequalification Requirement 49
Notice to Contractor – Bid Rejection 49
Notice to Contractor – Procurement of Materials 49
Notice to Contractor – State Spending Allocation Goals and Contract 50
Compliance Requirements
Notice to Contractor – Supervision and Inspection 50
Notice to Contractor – Bid Rigging and/or Frauds 50
Notice to Contractor – Requirements of Title 49,Code of Federal Regulations
Part 26 50
Notice to Contractor – Pre-Construction Meeting 50
Notice to Contractor – Verification of Existing Conditions 50
Notice to Contractor – Unanticipated Discovery of Cultural Resources 51
Notice to Contractor – Flood Contingency Plan Requirements 51
Notice to Contractor – No Storage or Staging of Materials Within Floodplain 51
Without Review and Written Approval
Notice to Contractor – Noise Pollution 51
Notice to Contractor – Call Before You Dig 52
Notice to Contractor – Protection of Existing Overhead Utilities 52
Notice to Contractor – Protection of Existing Underground Utilities 52
Notice to Contractor – Utility Coordination 53
Notice to Contractor – Water Main Distribution System Relocations 54
Notice to Contractor – Utility Relocations 55
Notice to Contractor – Transfer of Work or Contract 55
Notice to Contractor – Project Specific Testing Requirements 56
Notice to Contractor – Contractor Training Requirement For 10-Hour OSHA 57
Construction Safety and Health Course
Notice to Contractor – Time of Year Restrictions 57
Notice to Contractor – Municipal Project Field Office 58
Notice to Contractor – Invasive Vegetation 58
Notice to Contractor – Permits 58
Section 1.01 – Definitions of Terms and Permissible Abbreviations 59
Section 1.02 – Proposal Requirements and Conditions 60
Section 1.03 – Award and Execution of Contract 62
Section 1.04 – Scope of Work 63
Section 1.05 – Control of the Work 64
Section 1.06 – Control of Materials 66
Section 1.07 – Legal Relations and Responsibilities 67
Section 1.08 – Prosecution and Progress 69
Section 1.09 – Measurement and Payment 71
Section 1.10 – Environnemental Compliance 72
Section 1.11 – Claims 73
Division II – Construction Details 74
0201001A - 0201002A Clearing and Grubbing (Site No. X) 75
0202000A Earth Excavation 76
0202216A Excavation and Reuse of Existing Channel 77
Bottom Material
0202217A Supplemental Streambed Channel Material 80
0204151A - 0204152A Handling Water (Site No. X) 82
0210303A - 0210304A Turbidity Control Curtains (Site No. X) 83
0202000A Subbase 85
0213000A Granular Fill 86
0213001A ¾” Crushed Stone Fill 87
0304002A Processed Aggregate Base 88
0406002A Temporary Pavement 89
0406171A HMA S0.50 91
0406172A HMA S0.375 91
0503866A - 0503867A Removal of Existing Culvert (Site No. X) 92
0601109A - 0601110A Precast Concrete Wingwalls and Headwalls 93
(Site No. X)
0601125A - 0601126A (15’ x 4’) Precast Concrete Box Culvert 99
0601276A - 0601277A Precast Concrete Cutoff and Return Walls 107
(Site No. X)
0707006A Sand Cushion (Bridge) 111
0707009A Membrane Waterproofing (Cold Liquid 112
Elastomeric)
0819002A Penetrating Sealer Protective Compound 119
0910090A Steel-Backed Timber Guiderail – Type A 122
0952051A Control and Removal of Invasive Vegetation 125
0969060A Construction Field Office Small 130
0971001A - 0971002A Maintenance and Protection of Traffic 137
974001A Removal of Existing Masonry 150
1204210A Furnish and Install Project Sign 151
1300005A – 1300006A Relocation of Water Main (Site No. X) 155
1300007A Excavation and Disposal of Unsuitable Material 156
(Water Main)
1300014A Trench Excavation 0’-10’ Deep (Water Main) 156
1304123A Compacted Gravel Fill (Water Main) 156
1300008A Dewater, Control and Diversion of Water 162
(Water Main)
1304111A PCC340 Concrete (Water Main) 164
1304065A Abandon Existing Water Main 167
APPENDICES
APPENDIX A – Required Contract Provisions(State Funded Only Contracts)
(Prevailing Wage Rates)
APPENDIX B – Connecticut DOT Required Low Bidder Forms
APPENDIX C – Permits
BID NOTICE
TOWN OF ORANGE, CONNECTICUT
PINE TREE DRIVE AND PECK LANE CULVERTS OVER TUMBLE BROOK
The Town of Orange, Connecticut is seeking sealed bids for furnishing all labor, tools, materials, and equipment required for the Replacement of Pine Tree Drive and Peck Lane culverts over Tumble Brook.
Bids will be received by the Public Works Department, Town Hall, 617 Orange Center Road, Orange, Connecticut 06477 until 10:00 A.M., local time, on December 1, 2026, at which time the bids will be publicly opened and read aloud in the lower-level meeting room of the Town Hall.
Copies of the bid documents may be obtained from the Town of Orange Website and the State of
Connecticut Contracting Portal, CTsource.
CONTRACTOR SHALL BE PRE-QUALIFIED BY THE CONNECTICUT DEPARTMENT OF
TRANSPORTATION FOR GROUP NO. 8 – MINOR BRIDGES CONSTRUCTION OR GROUP NO. 8A – BOX
CULVERTS.
Form 819 Standard Specifications and Supplemental Specifications may be obtained via the Connecticut
Department of Transportation’s website: https://portal.ct.gov/dot/business/manuals?language=en_US
All Proposals must be on the form furnished by the Town of Orange for the above-named project.
Each Bidder must deposit with his/her bid a bid bond for not less than five percent (5%) of the bid as provided in the Information for Bidders.
THE CONTRACTOR WHO IS SELECTED TO PERFORM THIS PROJECT MUST COMPLY WITH CONN. GEN.
STAT. §§ 4A-60, 4A-60G, AND 46A-68B THROUGH 46A-68F. THIS CONTRACT IS SUBJECT TO STATE
CONTRACT COMPLIANCE REQUIREMENTS, INCLUDING NONDISCRIMINATION STATUTES AND SPENDING
ALLOCATION GOALS. THERE IS AN ESTIMATED $1,952,000 IN STATE FUNDING FOR THIS
PROJECT. STATE LAW REQUIRES PROJECT-SPECIFIC GOALS BE SET FOR THIS PROJECT BASED ON THE
PROJECT’S NEEDS AND AVAILABLE SMALL BUSINESS ENTERPRISES (“SBES”) AND MINORITY
BUSINESS ENTERPRISES (“MBES”). THE SBE GOAL FOR THIS PROJECT IS 29.39%. THE MBE GOAL
FOR THIS PROJECT IS 15.51%. THE SELECTED CONTRACTOR MUST DEMONSTRATE GOOD FAITH
EFFORT TO MEET THE SPENDING ALLOCATION GOALS.
The attention of the Bidders is called to the requirement for Minimum State Wage Rates to be paid under this Contract.
The right is reserved to reject any or all bids in whole or in part, to award any item, group of items, or total bid and to waive any informality or technical defects, if it is deemed to be in the best interest of the Town of Orange.
No Bidder may withdraw their bid within ninety (90) days after the actual date of the opening thereof.
CONTRACTORS that have questions on the plans, specifications, and other bid documents or that find discrepancies and/or errors in or between plans, specifications, quantities and other matters, must immediately notify Robert Brinton at bbrinton@orange-ct.gov and Gary Giroux at gary@cardinal-engineering.com not less than seven (7) days before the scheduled bid opening.
http://www.ct.gov/dot/cwp/view.asp?a=3609&q=430362 http://www.ct.gov/dot/cwp/view.asp?a=3609&q=430362 mailto:bbrinton@orange-ct.gov mailto:gary@cardinal-engineering.com
1.0 INTRODUCTION
1.1 The Town of Orange requests bids for THE REPLACEMENT OF PINE TREE DRIVE AND PECK
LANE CULVERTS OVER TUMBLE BROOK, according to these BID DOCUMENTS and the
CONSTRUCTION PLANS attached herein.
1.2 Bidders are required to comply with the instructions contained in these General Conditions and
Specifications, and to provide information where requested. Bids must be made upon the forms contained herein.
1.3 The contractor who is selected to perform this project must comply with CONN. GEN. STAT. §§
4a-60, 4a-60g, and 46a-68b through 46a-68f. This contract is subject to state contract compliance requirements, including nondiscrimination statutes and spending allocation goals. There is an estimated $1,952,000 in state funding for this project. State law requires project-specific goals be set for this project based on the project’s needs and available Small Business Enterprises (“SBEs”) and Minority Business Enterprises (“MBEs”). The SBE goal for this project is 29.39%. The MBE goal for this project is 15.51%. The selected contractor must demonstrate good faith effort to meet the spending allocation goals.
1.4 This project is subject to state prevailing wage rates.
2.0 KEY EVENT DATES
2.1 Request for Bids Advertised November 2, 2026
2.2 Bid Opening 10:00 AM, December 1, 2026, Town Hall Lower-Level Meeting Room
2.3 Bid Award Board of Selectmen Meeting December 9, 2026
BID DOCUMENTS
PROPOSAL FORMS AND SPECIAL PROVISIONS
FOR
REPLACEMENT OF
PINE TREE DRIVE AND PECK LANE
CULVERTS OVER
3.0 INFORMATION TO BIDDERS, BID FORMS AND SUBMISSION INSTRUCTIONS
3.1 These Contract Documents include a complete set of bidding and agreement forms. Separate copies of the bid package are included as an insert in the contract documents. All documents in the section of the bid documents entitled Proposal must be submitted as part of the bid package.
See “Contractor’s Check List” for a complete list of documents that must be submitted with each bid.
3.2 INTERPRETATIONS OR ADDENDA - No oral interpretation will be made to any Bidder as to the meaning of the Contract Documents or any part thereof. Every request for such an interpretation shall be made in writing (email) to the Design Engineer (gary@cardinal-engineering.com) and the Orange Town Engineer (bbrinton@orange-ct.gov). Any inquiry received seven or more days prior to the date fixed for opening of Bids will be given consideration. Every interpretation made to a Bidder will be in the form of an Addendum to the Contract Documents and when issued, will be on file in the office of the Town Engineer, 617 Orange Center Road, Orange, CT at least five days before Bids are opened. In addition, all Addenda will be e-mailed to each person obtaining Contract
Documents and whose name and e-mail address are on record with the Town; however, it shall be each Bidder's responsibility to make inquiry as to the Addenda issued and all such Addenda shall become part of the Contract and all Bidders shall be bound by such Addenda, whether or not received by the Bidders.
3.3 INSPECTION OF SITE - Each Bidder should visit the site of the proposed work and fully acquaint itself with the existing conditions there relating to construction and labor and should fully inform itself as to the facilities involved, the difficulties and restrictions attending the performance of the
Contract. The Bidder should thoroughly examine and familiarize itself with the Drawings, Technical
Specifications, and all other Contract Documents. The bidders shall also examine all records on file with the Town of Orange, “Call Before You Dig” and State Authorities regarding the project, and the areas within the project limits, to be apprised of all subsurface conditions and other relevant information. The Contractor, by the execution of the Contract, shall in no way be relieved of any obligation under it due to the failure to receive or examine any form or legal instrument or to visit the site and acquaint itself with the conditions there existing and the Town of Orange will reject any claim based on the facts regarding which it should have been on notice.
3.4 ALTERNATE BID - There is no alternate bid.
3.5 UNIT PRICES - The unit prices for each of the several items in the proposal of each Bidder shall include the pro rata share of overhead so that the sum of the products obtained by multiplying the quantity shown for each item by the unit price represents the total bid. Any bid not conforming to this requirement may be rejected as informal. The special attention of all Bidders is called to this provision for, should conditions make it necessary to revise the quantities, increase or decrease thereof may be made without limit and adjustment and compensation shall be made based on the unit bid prices for such items.
3.6 Copies of the bid documents may be obtained from the Town of Orange Website and the State of
Connecticut Contracting Portal, CTsource. Bidders must provide contact information to the town by emailing afaustini@orange-ct.gov and bbrinton@orange-ct.gov, to ensure that they receive bid addenda and other notifications. Bidders are responsible for checking the bid posting on the state contracting portal https://portal.ct.gov/DAS/CTSource/CTSource or on the Town of Orange website for bid addenda and responses to bidders’ questions, up to the time of the bid opening.
mailto:afaustini@orange-ct.gov mailto:bbrinton@orange-ct.gov
3.7 Ditto marks are not considered writing; shall not be used; and can be reason for non-acceptance of a bid.
3.8 All bids must be submitted in a sealed envelope, clearly marked "REPLACEMENT OF PINE
TREE DRIVE AND PECK LANE CULVERTS OVER TUMBLE BROOK, ORANGE, CT".
Bids must be received in the Public Works office by the time of the bid opening. Bids, corrections and/or modifications received after the published time of the bid opening will not be accepted. All documents in the section of the bid documents entitled Proposal must be submitted as part of the bid package.
3.9 The bid form must be signed by an authorized agent of the submitting company.
3.10 All information submitted must be in ink or typewritten. Mistakes may be crossed out and corrections inserted. The person signing the bid form must initial corrections.
3.11 The inability to meet any specified requirement(s) shall be:
(a) stated in writing and attached to the bid form, or
(b) written on the bid form
3.12 At the time of opening the bids, bidders shall be presumed to have read, and be thoroughly familiar with all specifications in this document. Failure of any bidder to receive, or examine, any form, instruction or document shall not relieve any bidder from obligations with respect to their bid.
3.13 Bidders MUST visit the site to observe existing conditions prior to submitting a bid. At the time of opening the bids, bidders shall be presumed to have inspected the site and be thoroughly familiar with the bid documents. Failure of any bidder to inspect the project site, ask questions, or to examine the bid documents, shall not relieve any bidder from obligations with respect to their bid. All bidders are required to visit the project site to observe existing conditions before submitting a bid. Change orders related to conditions that could be observed on a site visit will not be approved.
3.14 The completed bid package shall be in conformance with all other requirements as stated herein.
3.15 WAGES AND SALARIES - All contractors on this project must comply with the prevailing wage requirements set forth in Section 31-53 of the Connecticut General Statutes, including annual adjustments in prevailing wages. It is also the responsibility of Bidders to inform themselves of local labor conditions, such as the length of workday and work week, overtime compensation, health and welfare contributions, labor supply and adjustments in wages.
Each Contractor and Subcontractor will be required to submit a weekly payroll record. The submitted payroll records shall contain the following:
A properly completed CT Department of Labor Certified Payroll Form WWS-CPI.
3.16 The Contractor must have significant experience performing work similar in scope to this project.
References must be provided on the Bid Forms. Failure to submit references for relevant work
SHALL DISQUALIFY any person or firm from the bidding process. Contractor must have CT
DOT prequalification for Group 8 Minor Bridges or Group 8A Box Culvert construction.
Contractor shall submit evidence of CT DOT prequalification with Bid Proposal.
4.0 TIME REQUIREMENTS
4.1 Schedule and Time of Completion
Attention of the Bidder is directed to the time provision for completion of work under the Contract which requires that all work be completed in accordance with following schedule:
Schedule - Project No. L106-0002
Date
Start of Work on Peck Lane 04/01/2027
Peck Lane Closed to Traffic 06/21/2027
Peck Lane Substantially Complete (Open to Traffic) 08/20/2027
Start of Work on Pine Tree Drive 04/01/2027
Pine Tree Drive Closed to Traffic 08/23/2027
Pine Tree Drive substantially Complete (Open to Traffic) 10/29/2027
Contractor Completes all work 11/30/2027
To safely open the road to traffic, it is expected that the project will be substantially completed including the following:
• The culvert construction has been fully completed and capable of supporting design traffic loading as determined by the Engineer.
• Roads will be paved through the project area.
• Guide rails, signs and other traffic control devices shall be completely installed, or an approved safety barrier will be installed.
Prior to the start of construction, the Contractor shall prepare and submit a sequence of construction for approval by the Engineer.
4.2 Change of the Contract Time
The Contract time may only be changed by a Change Order. Any claim for an extension in the
Contract Time shall be based on written notice delivered to the Engineer within fifteen days of the occurrence of the event giving rise to the claim. Notice of the extent of the claim with supporting data shall be delivered within forty-five days of such occurrence unless the Engineer allows an additional period of time to ascertain more accurate data. All claims for adjustment in the Contract Time shall be reviewed by the Engineer and after reviewing the Engineer's recommendation and any other related information. The Town shall determine and approve any appropriate change to the Contract Time. Any change in the Contract Time resulting from any such claim shall be incorporated in a Change Order.
Contract time may be extended in an amount equal to time lost due to delays beyond the control of the Contractor if a claim is made. Such delays may include, but not be limited to, acts or neglect by the Town or to fires, floods, labor disputes, epidemics, abnormal weather conditions, or acts of
God.
All time limits stated in the Contract Documents are of the essence of the Agreement.
4.3 Liquidated Damages
The Contractor will proceed with the work at such rate of progress to ensure full completion within the time requirements stated above. It is expressly understood and agreed by and between the Contractor and the Town that the contract items for the completion of the work described herein shall be reasonable, taking into consideration the climatic and economic conditions and other factors prevailing in the locality of the work.
If the contractor shall fail to complete the work within the contract times, or extension of time granted by the Town, then the Contractor and his sureties shall be liable for and shall pay to the Town for each and every calendar day that he shall be in default in completing any given assignment in the time stipulated above, the sum of $ 7,000.00 per day liquidated damages for missing the Peck Lane substantial completion date and $1,500.00 per day liquidated damages for missing the Pine Tree Road substantial completion date. This sum is hereby agreed upon, not as a penalty, but as fixed liquidated damages which the Town will suffer by reason of such default, time being of the essence of the Contract and a material consideration thereof.
The Town shall have the right to deduct the amount of any damages from any money due the
Contractor under this Contract.
5.0 PAYMENT
5.1 The Town agrees that in consideration of the faithful performance by the successful bidder
(Contractor) of all covenants and agreements contained herein, to pay the successful bidders, within thirty (30) calendar days from receipt of an approved invoice. A 5% retainer will be withheld from all payments except the final.
5.2 Application for Progress Payment:
At least 10 days before each progress payment falls due (but not more often than once a month), the Contractor shall submit to the Engineer for review an Application for Payment filled out and signed by the Contractor covering the Work completed as of the date of the application and accompanied by such supporting documentation as is required by the contract documents and also as the Engineer may reasonably require. Each subsequent Application for Payment shall include an affidavit from the Contractor stating that all previous progress payments received on account of the work have been applied to discharge in full all the Contractor's obligations reflected in prior Applications for Payment. The amount of the retainer with respect to progress payments will be 5%.
5.3 Invoices shall be submitted for review and approval to both:
Cardinal Engineering Associates, Inc.
180 Research Parkway
Meriden, Connecticut 06450
Town of Orange
617 Orange Center Road
Orange, Connecticut 06477
6.0 MISCELLANEOUS
6.1 Bidders may withdraw their bid any time prior to the time of bid opening. No bidder shall withdraw, cancel, or modify their bid for a period of ninety (90) days after bid opening.
6.2 The Town of Orange is exempt from Connecticut Sales and Use Taxes and Federal Excise Taxes.
Bidders shall avail themselves of these exemptions.
6.3 The Town of Orange reserves the right to accept any bid, to reject any or all bids, to waive any minor bid informality or irregularity, and to award the bid deemed by the Town of Orange to be in its best interest. Lowest price shall not be the sole determining factor when awarding the bid. Bidders who are delinquent in taxes or fees to the Town of Orange will not be considered responsible bidders.
6.4 The successful bidder shall obtain all required building permits. Town building (including plumbing, mechanical, and electrical) permit fees will be waived, except for the state educational fee of $0.26 per $1,000 construction value.
7.0 NOT USED
8.0 TERMINATION
8.1 Failure to comply with any of the requirements of the bid documents or other contract documents may be considered breach of contract and as such shall be subject to termination of the contract by the Town.
9.0 INSURANCE
9.1 Contractor shall agree to maintain in force at all times during the contract the following minimum coverages and shall name the Town of Orange as an Additional Insured on a primary and non-contributory basis to all policies, except Workers Compensation. All policies should also include a
Waiver of Subrogation. Insurance shall be written with Carriers approved in the State of
Connecticut and with a minimum AM Best Rating of A- (Excellent) and minimum Financial Size
Category of VIII. In addition, all Carriers are subject to approval by the Town of Orange.
(Minimum Limits)
General Liability Each Occurrence
General Aggregate
Products/Completed Operations Aggregate
$1,000,000
$2,000,000
$2,000,000
Auto Liability
Umbrella/Excess
Liability
Combined Single Limit
Each Occurrence
$1,000,000
Professional Liability
(if applicable)
Each Occurrence
If any policy is written on a “Claims Made” basis, the policy must be continually renewed for a minimum of two (2) years from the completion date of this contract. If the policy is replaced and/or the retroactive date is changed, then the expiring policy must be endorsed to extend the reporting period for claims for the policy in effect during the contract for two (2) years from the completion date.
Workers’ Compensation WC Statutory Limits
Employers’ Liability EL Each Accident $500,000
EL Disease Each Employee $500,000
EL Disease Policy Limit $500,000
Original, completed Certificates of Insurance must be presented to the Town of Orange prior to contract issuance. Should any of the above-described policies be cancelled, limits reduced or coverage altered, 30 days’ written notice must be given to the Town of Orange.
9.2 Additional Insured – The Commercial Liability, Automobile Liability, and any Umbrella Liability
Insurance policies shall name as an additional insured the Town of Orange, Cardinal Engineering
Associates and The State of Connecticut.
9.3 For purposes of insurance, all certificates and communications should be addressed to:
Director of Public Works/Town Engineer
Town of Orange
Orange, CT 06477
10.0 SECURITIES
10.1 GENERAL All bonds required herein shall be provided by companies licensed to issue such documents in the State of Connecticut. Each Bond shall have a contact person's name, the issuing office's address, telephone number and fax number shown thereon and shall be automatically renewable.
10.2 BID Each bidder shall submit a bid security in the amount of 5 % of his total bid. The security shall be in the form of a bond issued by a company licensed to do so by the State of Connecticut.
Unsuccessful bidders' security will be returned within ten (10) working days after execution of a contract.
10.3 PERFORMANCE A properly executed Performance Bond, in the amount of 100% of the total contract price, shall be submitted, within ten (10) calendar days of the date of notice of award, to the following Town Official:
Public Works Director
Town of Orange
Orange, Connecticut 06477
10.4 PAYMENT A properly executed Payment Bond, in the amount of 100% of the contract price for the payment of all persons, firms or corporations to whom the successful bidder may become legally indebted for labor, materials, tools, equipment, or services of any nature including utility and transportation services, employed or used by him/her in performing the work, shall be submitted to the person identified in 10.3 above, within ten (10) calendar days of notice of award.
10.5 MAINTENANCE A properly executed Maintenance Bond, in the amount of 100% of the final contract costs for the financial guarantee by the contractor to ensure that any defects or issues arising from the completed project are addressed within the specified time. This bond serves to protect the owner (Town) against potential financial loss due to poor workmanship or materials used in the project. A properly executed Maintenance Bond, in the amount of 100% of the final contract costs, shall be held for a period of two (2) years.
11.0 SUMMARY OF WORK
11.1 GENERAL The Contractor shall furnish all labor, material, supplies, equipment, tools, and incidentals necessary to perform the following work:
THE REPLACEMENT OF PINE TREE DRIVE AND PECK LANE CULVERTS OVER TUMBLE
BROOK in the Town of Orange, Connecticut according to the attached plans and specifications.
The proposed work on structures included in this contract are assigned the following site designations:
• Site No. 1 – Replacement of Culvert – Pine Tree Drive over Tumble Brook
• Site No. 2 – Replacement of Culvert – Peck Lane over Tumble Brook
The new structures will be precast concrete box culverts. The replacement structures maintain the same horizontal alignment as the existing structures.
All bids shall contain the cost of all items and work, whether specified herein or not, required to provide a complete project. Failure to include such items and work specifically in the bid documents shall not be grounds for extra cost.
All materials and equipment supplied by the Contractor shall conform to the requirements of the
Plans and Specifications. No changes shall be allowed unless they are approved, in writing, by the
Town. All work shall be in accordance with Federal, State, and Town laws.
Hours of Work. The Contractor may perform work on the Project during the following work hours:
Monday – Friday: 7:00 a.m. to 5:00 p.m.
There is no work permitted at other times or on Saturdays, Sundays, or Holidays except if permitted by the Town. Requests for weekend or holiday work must be received no later than the end of the workday on the Thursday preceding the weekend in question, or at least one full business day before a holiday.
At the completion of the project, the contractor shall clean the work area and remove all debris, materials, tools, and equipment from the site.
CONTRACTOR’S CHECK LIST
PROJECT: REPLACEMENT OF PINE TREE DRIVE AND PECK LANE CULVERTS OVER
The following forms are required for submittal for the above referenced bid and shall be submitted with the bid proposal pages by the time and date specified. This checklist is provided for the
Bidder’s use and shall not be required for submittal.
The following forms shall be submitted in duplicate.
FORM DESCRIPTION
1. BID PROPOSAL PAGES
2. BID BOND
3. CERTIFICATE AS TO CORPORATE PRINCIPAL
4. FORM OF SURETY GUARANTY
5. NON-COLLUSION AFFIDAVIT OF PRIME BIDDER/PROPOSER
6. PROJECT REFERENCES
7. CONTRACTOR’S WAGE CERTIFICATION FORM
8. EVIDENCE OF CTDOT PREQUALIFICATION (GROUP NO. 8/8a MINOR BRIDGES
OR BOX CULVERTS)
BID
REPLACEMENT OF PINE TREE DRIVE AND PECK LANE CULVERTS OVER
Bid Submitted by:
Company Name
Street Address
City, State and Zip Code
Contact
Telephone # Fax #
James M. Zeoli
First Selectman
Orange Town Hall
Orange, CT 06477
Dear Mr. Zeoli, The undersigned, having familiarized themselves with the existing conditions of the Project area affecting the cost of the work and with the Contract Documents (which includes Advertisement
For Bids, Bid Form, Bid Bond, Instructions to Bidders, Non-Collusion Affidavit, Addenda, General Conditions, Special Conditions, Technical Specifications, Drawings as listed in the
Schedule of Drawings and form of Surety Bond or Bonds as prepared by the Town of Orange and on file at the First Selectman’s Office, Orange Town Hall, 617 Orange Center Road, Orange, CT
06477, hereby proposes to furnish all machinery, tools, appurtenances, equipment and services, including utility and transportation services required to construct and complete the work, all in accordance with the above listed Documents and submits, herewith, in conformity with the Project
Manual and subsequent addenda, the following bid:
BID PROPOSAL
REPLACEMENT OF PINE TREE DRIVE AND PECK LANE
CULVERTS OVER TUMBLE BROOK
ORANGE, CONNECTICUT
Brief Description: Unit or Lump Sum Est Ext. Total Bid (in both words and figures) Quantity in FiguresITEM No
1 0201001 A
CENTS
($ ) LS $
2 0201002 A
CENTS
($ ) LS $
3 0202000 A
CENTS
($ ) 1900 $
4 0202216 A
CENTS
($ ) 120 $
5 0202219 A
CENTS
($ ) 29 $
6 0202529 CUT BITUMINOUS CONCRETE PAVEMENT
CENTS
($ ) 220 $
7 0203000 STRUCTURE EXCAVATION-EARTH (COMPLETE)
CENTS
($ ) 1700 $
8 0203100 STRUCTURE EXCAVATION-ROCK (COMPLETE)
CENTS
($ ) 110 $
9 0204151 A
CENTS
($ ) LS $
10 0204152 A
CENTS
($ ) LS $
11 0209001
CENTS
($ ) 1580 $
12 0210303 A
CENTS
($ ) LS $
DOLLARS AND
SUPPLEMENTAL STREAMBED CHANNEL MATERIAL
DOLLARS AND
THE PRICE PER CUBIC YARD OF
THE PRICE PER LINEAR FOOT OF
THE PRICE PER SQUARE YARD OF
DOLLARS AND
DOLLARS AND
CLEARING AND GRUBBING (SITE NO. 1)
THE LUMP SUM PRICE OF
DOLLARS AND
THE PRICE PER CUBIC YARD OF
DOLLARS AND
EXCAVATION AND REUSE OF EXISTING CHANNEL BOTTOM MATERIAL
THE LUMP SUM PRICE OF
CLEARING AND GRUBBING (SITE NO. 2)
THE LUMP SUM PRICE OF
DOLLARS AND
EARTH EXCAVATION
THE PRICE PER CUBIC YARD OF
DOLLARS AND
THE PRICE PER CUBIC YARD OF
HANDLING WATER (SITE NO. 1)
THE PRICE PER CUBIC YARD OF
DOLLARS AND
FORMATION OF SUBGRADE
TURBIDITY CONTROL CURTAINS (SITE NO. 1)
DOLLARS AND
HANDLING WATER (SITE NO. 2)
THE LUMP SUM PRICE OF
DOLLARS AND
THE LUMP SUM PRICE OF
DOLLARS AND
CULVERTS OVER TUMBLE BROOK
ORANGE, CONNECTICUT
Brief Description: Unit or Lump Sum Est Ext. Total Bid (in both words and figures) Quantity in FiguresITEM No
13 0210304 A
CENTS
($ ) LS $
14 0212000 A
CENTS
($ ) 490 $
15 0213100 A
CENTS
($ ) 20 $
16 0213101 A
CENTS
($ ) 220 $
17 0216000
CENTS
($ ) 560 $
18 0219001
CENTS
($ ) 610 $
19 0219011
CENTS
($ ) 10 $
20 0304002 A
CENTS
($ ) 190 $
21 0406002 A
CENTS
($ ) 120 $
22 0406171 A
DOLLARS AND CENTS
($ ) 190 $
23 0406172 A
DOLLARS AND CENTS
($ ) 190 $
24 0406173
DOLLARS AND CENTS
($ ) 16 $
THE PRICE PER SQUARE YARD OF
DOLLARS AND
DOLLARS AND
PROCESSED AGGREGATE BASE
3/4" CRUSHED STONE FILL
THE PRICE PER CUBIC YARD OF
DOLLARS AND
TEMPORARY PAVEMENT
DOLLARS AND
HMA S0.5
THE PRICE PER LINEAR FOOT OF
DOLLARS AND
SEDIMENTATION CONTROL SYSTEM
DOLLARS AND
TURBIDITY CONTROL CURTAINS (SITE NO. 2)
THE LUMP SUM PRICE OF
THE PRICE PER TON OF
DOLLARS AND
THE PRICE PER CUBIC YARD OF
DOLLARS AND
HMA S0.375
THE PRICE PER CUBIC YARD OF
GRANULAR FILL
THE PRICE PER CUBIC YARD OF
SUBBASE
THE PRICE PER TON OF
PERVIOUS STRUCTURE BACKFILL
THE PRICE PER CUBIC YARD OF
DOLLARS AND
SEDIMENTATION CONTROL SYSTEM AT CATCH BASIN
THE PRICE PER EACH OF
HMA S0.25
THE PRICE PER TON OF
CULVERTS OVER TUMBLE BROOK
ORANGE, CONNECTICUT
Brief Description: Unit or Lump Sum Est Ext. Total Bid (in both words and figures) Quantity in FiguresITEM No
25 0406303
DOLLARS AND CENTS
($ ) 230 $
26 0503866 A
CENTS
($ ) LS $
27 0503867 A
CENTS
($ ) LS $
28 0586001.10
CENTS
($ ) 1 $
29 0586040.10
CENTS
($ ) 1 $
30 0586620
CENTS
($ ) 2 $
31 0586622
CENTS
($ ) 1 $
32 0601109 A
CENTS
($ ) 1 $
33 0601110 A
CENTS
($ ) 1 $
34 0601125 A
CENTS
($ ) 52 $
35 0601126 A
CENTS
($ ) 128 $
36 0601276 A
DOLLARS AND CENTS
($ ) LS $
THE LUMP SUM PRICE OF
DOLLARS AND
15' x 4' PRECAST CONCRETE BOX CULVERT (SITE NO. 1)
TYPE 'C-L' CATCH BASIN - 0' - 10' DEEP
THE PRICE PER EACH OF
DOLLARS AND
THE PRICE PER LINEAR FOOT OF
DOLLARS AND
15' x 4' PRECAST CONCRETE BOX CULVERT (SITE NO. 2)
THE PRICE PER LINEAR FOOT OF
DOLLARS AND
REMOVAL OF EXISTING CULVERT (SITE NO. 1)
THE PRICE PER LINEAR FOOT OF
THE LUMP SUM PRICE OF
DOLLARS AND
THE PRICE PER EACH OF
SAWING AND SEALING JOINTS
THE LUMP SUM PRICE OF
DOLLARS AND
TYPE 'C' CATCH BASIN - 0' - 10' DEEP
THE PRICE PER EACH OF
REMOVAL OF EXISTING CULVERT (SITE NO. 2)
PRECAST CONCRETE CUTOFF AND RETURN WALLS (SITE NO. 1)
RESET TYPE 'C-L' CATCH BASIN
DOLLARS AND
DOLLARS AND
RESET TYPE 'C-L' CATCH BASIN DOUBLE GRATE TYPE 1
DOLLARS AND
PRECAST CONCRETE HEADWALLS AND WINGWALLS (SITE NO. 2)
THE PRICE PER EACH OF
PRECAST CONCRETE HEADWALLS AND WINGWALLS (SITE NO. 1)
THE LUMP SUM PRICE OF
DOLLARS AND
THE LUMP SUM PRICE OF
CULVERTS OVER TUMBLE BROOK
ORANGE, CONNECTICUT
Brief Description: Unit or Lump Sum Est Ext. Total Bid (in both words and figures) Quantity in FiguresITEM No
37 0601277 A
DOLLARS AND CENTS
($ ) LS $
38 0601502
CENTS
($ ) 80 $
39 0686000.15
CENTS
($ ) 102 $
40 0686000.24
CENTS
($ ) 35 $
41 0703011
CENTS
($ ) 100 $
42 0707006 A
CENTS
($ ) 70 $
43 0707009 A
CENTS
($ ) 410 $
44 0708001
CENTS
($ ) 370 $
45 0755009 GEOTEXTILE
CENTS
($ ) 760 $
46 0815001 BITUMINOUS CONCRETE LIP CURBING
CENTS
($ ) 250 $
47 0819002 A
CENTS
($ ) 48 $
48 0822001
CENTS
($ ) 260 $
THE PRICE PER SQUARE YARD OF
DOLLARS AND
DAMPPROOFING
MEMBRANE WATERPROOFING (COLD LIQUID ELASTOMERIC)
THE PRICE PER CUBIC YARD OF
TEMPORARY TRAFFIC BARRIER
THE PRICE PER SQUARE YARD OF
15'' R.C. PIPE - 0' - 10' DEEP
PENETRATING SEALER PROTECTIVE COMPOUND
THE PRICE PER LINEAR FOOT OF
DOLLARS AND
DOLLARS AND
THE PRICE PER LINEAR FOOT OF
DOLLARS AND
THE PRICE PER LINEAR FOOT OF
DOLLARS AND
PRECAST CONCRETE CUTOFF AND RETURN WALLS (SITE NO. 2)
DOLLARS AND
DOLLARS AND
THE PRICE PER SQUARE YARD OF
DOLLARS AND
THE PRICE PER SQUARE YARD OF
1/2" PREFORMED EXPANSION JOINT FILLER FOR BRIDGES
24'' R.C. PIPE - 0' - 10' DEEP
SAND CUSHION (BRIDGE)
THE PRICE PER CUBIC YARD OF
THE LUMP SUM PRICE OF
THE PRICE PER LINEAR FOOT OF
DOLLARS AND
DOLLARS AND
DOLLARS AND
THE PRICE PER SQUARE FOOT OF
INTERMEDIATE RIP RAP
CULVERTS OVER TUMBLE BROOK
ORANGE, CONNECTICUT
Brief Description: Unit or Lump Sum Est Ext. Total Bid (in both words and figures) Quantity in FiguresITEM No
49 0910090 A
CENTS
($ ) 144 $
50 0913001
CENTS
($ ) 150 $
51 0922500
CENTS
($ ) 259 $
52 0922501
CENTS
($ ) 59 $
53 0944000
CENTS
($ ) 900 $
54 0950005
CENTS
($ ) 900 $
55 0952051 A
CENTS
($ ) 225 $
56 0969060 A
CENTS
($ ) 4 $
57 0970006
$ TWENTY NINE THOUSAND SIX HUNDRED
NO CENTS
($ 29,600.00 ) EST $ 29,600.00
58 0971101 A
CENTS
($ ) LS $
59 0971102 A
CENTS
($ ) LS $
60 0974001 A
CENTS
($ ) 14 $
REMOVAL OF EXISTING MASONRY
DOLLARS AND
TRAFFIC PERSON (MUNICIPAL POLICE OFFICER)
THE PRICE PER SQUARE YARD OF
THE PRICE PER SQUARE YARD OF
DOLLARS AND
DOLLARS AND
DOLLARS AND
FURNISHING AND PLACING TOPSOIL
THE PRICE PER SQUARE YARD OF
DOLLARS AND
TURF ESTABLISHMENT
THE ESTIMATED PRICE OF
DOLLARS AND
THE PRICE PER SQUARE YARD OF
THE LUMP SUM PRICE OF
DOLLARS AND
MAINTENANCE AND PROTECTION OF TRAFFIC (SITE NO. 2)
THE LUMP SUM PRICE OF
DOLLARS AND
THE PRICE PER CUBIC YARD OF
CONTROL AND REMOVAL OF INVASIVE VEGETATION
BITUMINOUS CONCRETE DRIVEWAY
STEEL-BACKED TIMBER GUIDERAIL - TYPE A
THE PRICE PER LINEAR FOOT OF
DOLLARS AND
THE PRICE PER SQUARE YARD OF
DOLLARS AND
CONSTRUCTION FIELD OFFICE (SMALL)
4' CHAIN LINK FENCE
THE PRICE PER LINEAR FOOT OF
DOLLARS AND
BITUMINOUS CONCRETE DRIVEWAY (COMMERCIAL)
THE PRICE PER MONTH OF
DOLLARS AND
MAINTENANCE AND PROTECTION OF TRAFFIC (SITE NO. 1)
CULVERTS OVER TUMBLE BROOK
ORANGE, CONNECTICUT
Brief Description: Unit or Lump Sum Est Ext. Total Bid (in both words and figures) Quantity in FiguresITEM No
61 0975004
CENTS
($ ) LS $
62 0976002
CENTS
($ ) 2400 $
63 0978002
CENTS
($ ) 24 $
64 0979003
CENTS
($ ) 24 $
65 0980020
CENTS
($ ) LS $
66 0980021
CENTS
($ ) LS $
67 0981100
CENTS
($ ) 38 $
68 1204210 A
CENTS
($ ) 4 $
69 1209007
CENTS
($ ) 382 $
70 1220027
CENTS
($ ) 460 $
71 1300005 A
CENTS
($ ) LS $
72 1300006 A
CENTS
($ ) LS $
CONSTRUCTION BARRICADE - TYPE III
TRAFFIC DRUM
CONSTRUCTION SIGNS
DOLLARS AND
THE LUMP SUM PRICE OF
DOLLARS AND
THE PRICE PER EACH OF
THE LUMP SUM PRICE OF
THE PRICE PER DAY OF
DOLLARS AND
THE PRICE PER EACH OF
MOBILIZATION AND PROJECT CLOSEOUT
42" TRAFFIC CONE
THE PRICE PER EACH OF
DOLLARS AND
BARRICADE WARNING LIGHTS-HIGH INTENSITY
DOLLARS AND
DOLLARS AND
CONSTRUCTION SURVEYING (SITE NO. 1)
DOLLARS AND
FURNISH AND INSTALL PROJECT SIGN
CONSTRUCTION SURVEYING (SITE NO. 2)
DOLLARS AND
RELOCATION OF WATER MAIN (SITE NO. 1)
THE LUMP SUM PRICE OF
DOLLARS AND
THE PRICE PER SQUARE FOOT OF
RELOCATION OF WATER MAIN (SITE NO. 2)
THE LUMP SUM PRICE OF
DOLLARS AND
THE PRICE PER EACH OF
DOLLARS AND
PAINTED PACEMENT MARKING 4" YELLOW
THE PRICE PER LINEAR FOOT OF
DOLLARS AND
THE LUMP SUM PRICE OF
CULVERTS OVER TUMBLE BROOK
ORANGE, CONNECTICUT
Brief Description: Unit or Lump Sum Est Ext. Total Bid (in both words and figures) Quantity in FiguresITEM No
73 1300007 A
CENTS
($ ) 20 $
74 1304111 A
CENTS
($ ) 24 $
75 1304123 A
CENTS
($ ) 40 $
TOTAL BID:
DOLLARS
AND CENTS
SUBMITTED BY:
(PRINTED NAME)
(TITLE)
(SIGNATURE) (DATE)
COMPACTED GRANULAR FILL (WATER MAIN)
THE PRICE PER CUBIC YARD OF
DOLLARS AND
PCC3340 CONCRETE (WATER MAIN)
THE PRICE PER CUBIC YARD OF
DOLLARS AND
EXCAVATION AND DISPOSAL OF UNSUITABLE MATERIAL (WATER MAIN)
THE PRICE PER CUBIC YARD OF
DOLLARS AND
It is understood and agreed that the written Unit Prices bid for the quantities of work in the various items of work shall control the Contract award and that the quantities noted are approximate
(estimated only for use in comparing bids); and that the sum obtained by multiplying the Unit Prices by the estimated quantities and, also, the total of these sums are inserted for the purpose of checking this Bid and for the convenience of the Bidder.
The Unit Prices are to be paid for the actual quantities of the several classes of work in the completed work or structures.
Notice to Bidders:
The Bidder’s attention is called to Section 3.5 of the “Instructions to Bidders” regarding the significance of the as-bid unit prices for this Project.
The Bidder understands, by signing this Bid, that the Town of Orange shall REJECT any bid that has unit prices, which are, in the opinion of the Town, obviously unbalanced. The Bidder is required to calculate the value of the various bid items on the basis of reasonable labor, material, equipment, pro rata profit and pro rata overhead costs to perform the work described in the Contract Documents.
In submitting this Bid, the Bidder understands that the Town of Orange reserves the right to reject any and all bids, or to waive any informality in the submitted bid documents. The Bidder also understands that the Town of Orange reserves the right to accept any, all, or none of the Alternates, which may be listed above and may accept Alternates in any order at the Town’s sole discretion. The
Bidder agrees to perform the work of each accepted Alternate for the sum quoted for each and to include such accepted Alternates in the Contract for construction.
If written notice of the acceptance of this Bid and any or all of the Alternates is mailed or otherwise delivered to the undersigned within ninety (90) days after the opening of the Bid, or at any time thereafter before the Bid is withdrawn, the undersigned agrees to execute and deliver any Contract in the prescribed form and furnish the required bonds within ten (10) days after the Contract is presented to them for signature.
Bid Bond:
The undersigned herewith submits security equal to five percent (5%) of the Base Bid, the sum of:
Dollars and No Cents
This security shall be the sole and exclusive property of the Town of Orange as liquidated damages to the Town, if the undersigned fails to execute a Contract in conformity with the accompanying forms, after due date notification therefore in the Contract Documents.
Other Conditions:
Attached hereto is an affidavit in proof that the undersigned has not colluded with any person with respect to this Bid, or any other bid, or in the submitting of this Bid.
The Bidder is enclosing a statement of their qualifications and is prepared to submit a financial statement upon request.
The acceptance of subcontractors shall rest with the Town and their decision shall be final.
Addenda:
The bidder hereby acknowledges receipt of the following Addenda. (Include signed copies of addenda with bid submittal)
Addendum Number
Date Received
Signature
Bidder’s Official Name and Address:
Company Name: ____________________________________________________________
Street Address______________________________________________________________
City, State and Zip Code: _____________________________________________________
Contact: ___________________________________________________________________
Signature_______________________________Title__________________Date__________
BID BOND
KNOW ALL MEN BY THESE PRESENTS, THAT, we the undersigned, (Name of Principal) as PRINCIPAL, and as SURETY are held and firmly bound unto the Town of Orange hereinafter called the “Town,” in the penal sum of Dollars ($ ) lawful money of the Untied States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents.
THE CONDITIONS OF THE OBLIGATIONS IS SUCH THAT whereas the Principal has submitted the accompanying bid dated , 20___ for REPLACEMENT OF PINE TREE
DRIVE AND PECK LANE CULVERTS OVER TUMBLE BROOK
NOW THEREFORE, if the Principal shall not withdraw said bid within the period specified therein after the opening of same or if no period be specified within 180 days after the said opening and shall within the period specified therefore, or, if no period be specified within 10 days after the prescribed forms are presented to him for signature, enter into a written Contract with the Town of
Orange in accordance with the bid as accepted and give bond with good and sufficient surety or sureties, as may be required for the faithful performance and proper fulfillment of such contract, or in the event of the withdrawal of said bid within the period specified, or the failure to enter into such
Contract and give such bond within the time specified, if the Principal shall pay the Town of Orange the difference between the amount specified in said Bid and the amount for which the Town of
Orange may procure the required work or supplies or both, if the latter amount be in excess of the former, than the above obligations shall be void and of no effect, otherwise to remain in full force and effect.
IN WITNESS WHEREOF, the above bounded parties have executed this instrument under their several seals this day of , 20 , the name and Corporate Seal of each corporate party being hereto affixed and these presents duly signed by the undersigned representative pursuant to authority of the governing body.
For Sole Proprietor
(Seal)
In Presence of:
(Witness Signature) (Individual Principal)
(Witness Signature) (Business Address)
For Partnership:
In Presence of: (Seal)
(Witness Signature) (Partnership)
By: _
(Witness Signature)
(Business Address)
For Corporation:
Attest:
(Corporate Principal)
(Affix
Corporate
Seal)
By: _____________________________________
(Corporate Surety)
(Affix
Corporate
Countersigned:
By: By: _________________________________
Attorney-in-Fact, State of _________________________________________________________
CERTIFICATE AS TO CORPORATE PRINCIPAL
I, , certify that I am the Secretary of the
Corporation named as Principal in the within bond, that _________________________________ who signed the said bond on behalf of the Principal was then ___________________________ of said Corporation; that I know the signature and the signature thereto is genuine and that said bond was duly signed, sealed and attested to for and in behalf of said Corporation by authority of the governing body.
(Title)
(Corporate
(The Surety Company must append statement of their financial condition and a copy of the resolution authorizing the execution of bonds by officers of the company and the power-of-attorney of the surety company’s attorney-in-fact, authorized to act within the State of Connecticut).
FORM OF SURETY GUARANTY
(To accompany Bid)
KNOW ALL MEN BY THESE PRESENTS, that for and in consideration of the sum of
$1.00, lawful money of the United States, the receipt whereof is hereby acknowledged, paid the undersigned corporation and for other valuable consideration, the
(Name of Surety Company) a corporation organized and existing under the laws of the State of __________________________ and licensed to do business in the State of Connecticut, certified and agrees, that if Contract
REPLACEMENT OF PINE TREE DRIVE AND PECK LANE CULVERTS OVER TUMBLE
BROOK, is awarded to
, the undersigned Corporation will execute the
(Name of Bidder) bond or bonds as required by the Contract Documents and will become Surety in the full amount of the Contract Price for the faithful performance of the Contract and for payment of all persons supplying labor or furnishing materials in connection thencewith.
(Surety)
(To be accompanied by the usual proof of authority of officers of surety company to execute the same).
NON-COLLUSIVE AFFIDAVIT OF PRIME BIDDER
State of ________________________________
County of ______________________________
________________________________________________ being first duly sworn, deposes that:
1. (He, She) is (Owner, Partner, Officer Representative or Agent) of __________________
______________________________________________, the bidder that has submitted the attached
Bid;
2. (He, She) is fully informed respecting the preparation and contents of the attached bid and all pertinent circumstances respecting such Bid;
3. Such Bid is genuine and is not collusive or a sham Bid;
4. Neither the said Bidder nor any of its officers, partners, owners, agents, representatives, employees or parties in interest, including this affiant, has in any way colluded, conspired, connived or agreed, directly or indirectly, with any other Bidder, firm or person to submit a collusive or sham bid in connection with the Contract for which the attached Bid is submitted or to refrain from bidding in connection with such Contract, or has in any manner, directly or indirectly, sought by agreement, collusion, communication or conference with any other Bidder, firm or person to fix the price or prices in the attached Bid or the Bid price of any other Bidder, or to secure through any collusion, conspiracy, connivance or unlawful agreement, any advantage against the Town or any person interested in the proposed Contract;
5. The price, or prices, quoted in the attached Bid are fair and proper and are not tainted by any collusion, conspiracy, connivance, or unlawful agreement on the part of the Bidder or any of its agents, representatives, owners, employees, or parties in interest, including this affiant; and
6. That no employee or person whose salary is payable in part by the Treasury of the Town in which the Project is located, is directly or indirectly interested in the Bid, or its supplies, materials, equipment, work, or labor to which it relates, or in any profits thereof.
(Signed) ________________________________________
(Title) ________________________________________
Subscribed and sworn to before me this _____ day of __________________________________
(Signed) ________________________________________
(Title) ________________________________________
My Commission Expires: ________________________________________________________
PROJECT REFERENCES
Provide references for similar projects your firm recently completed:
1. Project Name & Location:____________________________________________
Project Description: _________________________________________________
Contract Amount:___________________________________________________
Owner:___________________________________________________________
Contact Person:_____________________________________________________
Tel. #:____________________________________________________________
Email:____________________________________________________________
Date of Completion:_________________________________________________
2. Project Name & Location:____________________________________________
Contract Amount:___________________________________________________
Owner:___________________________________________________________
Contact…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .