Renovation of a Historic Structure into a Community Civic Center
Closed State & local contract opportunity Posted
- Solicitation number
- IFB-4-2026
- State
- New Jersey
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Melissa Unrath purchasing@denvillenj.org (973) 625-8300
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The Township of Denville, Morris County, New Jersey is requesting sealed bids for renovation of a historic structure into a community civic center, with bids due September 2, 2026 at 11:00 a.m. and a mandatory pre-bid conference at the project site on August 5, 2026 at 9:00 a.m.
The scope encompasses complete renovation of an abandoned 2-room schoolhouse located at 501 Openaki Road (Block 20203, Lot 13) into a functional civic center. Work includes modernizing utilities, improving energy efficiency, strengthening structural framework, implementing safety improvements, and ensuring full ADA compliance. The design will attempt to maintain a historic aesthetic and preserve original features where feasible, though the building is not listed on any State or Federal historic registry. The contract encompasses site work, general construction, plumbing, heating and ventilating, electrical work, and structural improvements as a single overall lump-sum contract.
The project is funded in part by the U.S. Department of Housing and Urban Development, requiring compliance with 2 CFR 200.327 and all applicable Federal provisions. Contractors and subcontractors must comply with the Public Works Contractor Registration Act and the New Jersey Prevailing Wage Act, and be registered with the New Jersey Department of Treasury, Division of Revenue. The prime contractor must perform on-site work equivalent to at least 51% of the total contract value with its own organization.
Bid security must accompany proposals in the form of a bid bond, cashier's check, or certified check equal to 10% of the total bid but not exceeding $20,000. The successful contractor shall execute a Performance Bond and Maintenance Bond each equal to 100% of the accepted bid and complete all work within 270 calendar days of receiving written Notice to Proceed. The Owner reserves the right to reject all bids and will make an award or reject bids within 60 days of opening.
Opportunity text
The work includes the furnishing of all labor, materials and equipment necessary to complete the work as shown on the Drawings and as described in the Specifications. The work consists of modernizing utilities, making the structure energy efficient, improving the structure framework, numerous safety improvements and making the facility fully ADA compliant. The work is located at the abandoned building at 501 Openaki Road (Block 20203, Lot 13) in the Township of Denville. Despite the age, the building is not listed in any State or Federal historic registries although the proposed design will attempt to maintain a historic feel and some original features. For the unit/lump sum prices bid on this Contract, the Contractor shall furnish all labor, materials and equipment required for the renovation of a historic structure into a community civic center and miscellaneous site work and all else required to meet the intent of this project. The work is located in an abandoned building at 501 Openaki Road in the Township of Denville, that was originally constructed as a 2-room school house. The building has been vacant since the early 2000s. The proposed improvements will include modernizing utilities, making the structure energy efficient, improving the structural framework, numerous safety improvements, and making the facility fully ADA compliant. Despite its age, the building is not listed on any State or Federal historic registries although the proposed design will attempt to maintain a historic feel and some original features. The intent of this project is to renovate the historic structure into a Community Civic Center. During the course of construction, all subcontractors shall cooperate regarding the use of available facilities and undertake the work within their contract areas of responsibility so as to facilitate the work of other subcontracts. The scheduling of work shall be coordinated by the General Contractor with the review of the Engineer. Time scheduling shall be arranged to enable all subcontractors to work at the same time so far as may be practical. The Contractor shall be responsible for overall construction operations at the site and other subcontractors shall work through him and the Engineer in all matters involving the coordination of the various items of work. Regularly scheduled job meetings shall be held at least twice per month to resolve differences relating to coordination of the various phases of the work. Site cleanup shall be the responsibility of the Contractor and he shall have the cooperation of all subcontractors on the site in this regard. The Contractor shall, at their own expense, obtain all necessary UCC (Uniform Construction Code) permits, licenses, and approvals required by the Township of Denville. The Contractor shall execute all work in strict compliance with the adopted UCC (e.g., building, electrical, plumbing, fire subcodes) and all applicable local, state, and federal laws. No work shall commence prior to the issuance of the required permits. The Contractor is solely responsible for notifying the local enforcing agency and scheduling all required interim and final inspections at designated project milestones. The Contractor must ensure all work passes final inspection and coordinate with the Owner to obtain the necessary Certificate of Occupancy (CO) or Certificate of Approval prior to final project sign-off. Any fines, reinspection fees, or project delays resulting from the Contractor's failure to adhere to the UCC inspection schedule shall be borne entirely by the Contractor. Should any work fail to comply with the UCC, the Contractor shall bear all costs associated with correcting, remedying, or replacing the nonconforming work. The Contractor guarantees that all materials and labor provided under this Contract will conform to the highest applicable code standards All existing electrical, heat, gas, water, telephone, or other utility services to the existing facilities shall be kept in operation at all times during the construction period. Brief general descriptions of the various components of the work are set forth in the sections which follow. All work included on the Drawings and in the Specifications shall be completed in full without further compensation than is provided for in the Unit/Lump Sum Prices regardless of whether or not such work is specifically mentioned in the Scope of Contract Items following. Although the contract is a single overall construction contract, the Specifications describe construction operations in various standard broad work categories. The general construction work shall include in general,
Files
| File | Type | Posted |
|---|---|---|
| denville Denville_Civic Center_FINAL BID SPEC_7.21.26 (1).pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity