Red Oak Road Bridge Over Mill Creek

Closed State & local contract opportunity Posted

Solicitation number
PE-77648-NONST-2025-000000016
State
Georgia
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from ssl.doas.state.ga.us. Updated .

About this opportunity

Tift County, Georgia is soliciting bids for the Red Oak Road Bridge Over Mill Creek construction project, with sealed bids due on January 29, 2025, at 11:00 AM in the Charles Kent Administration Building. The project involves constructing a 32-foot wide, 80-foot-long bridge structure utilizing pre-stressed concrete slabs, PSC pilings, and approach slabs, which includes removing existing drainage structures. Bidders must be pre-qualified Georgia Department of Transportation contractors and must participate in the E-Verify program. A mandatory pre-bid conference was held on January 8, 2025, at the Watkins & Associates Office in Tifton. Bidding documents are available for a non-refundable fee of $300, and contractors must submit a bid bond or certified cashier's check for 10% of the bid amount. The project timeline requires substantial completion within 45 consecutive calendar days and final contract closeout within 60 consecutive calendar days. All work must be completed in accordance with the provided plans and specifications.

The procurement is funded through Local Special Purpose Local Option Sales Tax (SPLOST) and does not appear to have specific set-aside designations for disadvantaged enterprises. Contractors must submit a Bidder's Affidavit of Compliance with O.C.G.A. 13-10-91 and be prepared to furnish 100% performance and payment bonds if awarded the contract. The owner reserves the right to reject any or all bids and waive informalities. While a specific budget range is not explicitly stated, contractors should be prepared to submit competitive bids for a bridge replacement project. The contract will be awarded as a single comprehensive construction contract to the most qualified bidder meeting all specified requirements. No incumbent vendor information was provided in the available documentation.

Opportunity text

The work to be done shall consist of furnishing all labor, materials and equipment necessary to construct the proposed Red Oak Road Bridge Over Mill Creek as shown on the construction drawings. In general, construction consists of removal existing drainage structures; and installation of a 32' wide, 80¿-foot-long bridge structure utilizing pre-stressed concrete slabs, PSC pilings, approach slabs, and all associated measures for the complete project. Time allotted for completion of work is 45 consecutive calendar days to substantial completion. Work shall be complete and ready for contract closeout with 60 consecutive calendar days. All work shall be completed in accordance with the plans and specifications. The work will be awarded in one (1) Contract.

Files

File Type Posted
_Addendum No_ 1_Tift Co_ Red Oak Road.pdf PDF
Addendum No_ 2.pdf PDF
00111 _ Advertisement for Bids.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity