Reconstruction of Anacostia Ave Bridge 78

Closed State & local contract opportunity Posted

Solicitation number
DCKA2026B0027
State
District of Columbia
Responses due

Opportunity facts

Jurisdiction
NIGP code
UNSPSC codes
Point of contact

Opportunity details come from contracts.ocp.dc.gov. Updated .

About this opportunity

The District of Columbia is seeking a contractor for the reconstruction of the Anacostia Avenue Bridge over Anacostia River Outlet (Bridge 78), a comprehensive infrastructure project located in Washington, DC. The procurement requires a qualified contractor to provide complete construction services, including all necessary labor, materials, equipment, tools, and incidentals required to execute the project according to specified contract documents. The project scope mandates adherence to contract plans, standard specifications, and supplementary specifications that outline minimum requirements for material quality, quality control, and construction methodologies. The solicitation was posted on January 6, 2026, with proposals due by February 20, 2026, providing potential bidders approximately six weeks to prepare and submit comprehensive project proposals. The contract demands precise technical expertise in bridge reconstruction, with contractors expected to demonstrate capability to execute complex infrastructure rehabilitation work that meets municipal engineering standards.

While specific set-aside designations are not explicitly detailed in the provided documentation, contractors should anticipate potential local or small business preferences typical in municipal infrastructure projects. The project's technical complexity suggests that prime contractors will likely need significant infrastructure construction experience, particularly in bridge rehabilitation and river outlet construction. No incumbent vendor information or specific budget range was provided in the original solicitation. Potential bidders should carefully review the complete contract documents to understand the full technical specifications, performance requirements, and potential integration challenges associated with reconstructing Bridge 78. Interested contractors will need to demonstrate robust technical capabilities, proven infrastructure construction experience, and the ability to meet the District of Columbia's rigorous engineering and project management standards.

Opportunity text

Work under this contract consists of the reconstruction of the Anacostia Avenue Bridge over Anacostia River Outlet (Bridge 78) project in Washington DC (Project). The Contractor shall provide all labor, materials, equipment, tools and incidentals necessary for the construction of the Project in accordance with the Contract Documents (the Work), which includes providing all materials, equipment, labor, tools, and incidentals necessary to complete the work as shown on the contract plans, standard specifications and the supplementary specifications (also referred to as special provision). The specifications and special provisions describe the minimum requirements for the material, quality control, and construction that shall govern the Work to be performed.

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity