Reconstructing the I-57 and IL 16 interchange located east of Mattoon from a cloverleaf to a raindrop diamond configuration

Closed State & local contract opportunity Posted

Solicitation number
74435
State
Illinois
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The Illinois Department of Transportation (IDOT) is soliciting bids for reconstruction of the I-57 and IL 16 interchange east of Mattoon in Coles County under Contract No. 74435, with electronic bids due June 12, 2026 at 12:00 p.m. to the iCX system. This is a Federal-aid NHPP (National Highway Performance Program) construction project subject to prevailing wage standards, EEO compliance, and a Project Labor Agreement.

The scope converts the existing cloverleaf interchange to a raindrop diamond configuration. Work includes removal and replacement of I-57 structures over IL 16; removal of I-57 structures over the Lincoln Prairie Grass Trail with replacement by cast-in-place box culvert; and comprehensive ancillary construction: pavement patching, milling, HMA resurfacing, full-depth HMA and PCC pavement, shoulders, curb and gutter, PCC sidewalk, medians, storm sewer, pipe and precast box culverts, guardrail, pavement markings, sign installation, fiber optic cable, CCTV dome camera systems, communications vault, ADA-compliant pedestrian facilities, earth excavation, and seeding. Geographic limits are I-57 from 0.5 miles south to 1 mile north of IL 16, and IL 16 from just east of Swords Drive to just west of Lerna Road.

The project is staged with intermediate completion dates of November 15, 2026 (pre-stage), November 15, 2027 (Stage 1), and November 15, 2028 (Stage 2), with overall completion November 15, 2029. Contractors receive 15 guaranteed working days post-completion for cleanup and punch list. Specific ramp and roadway closures are restricted to defined calendar day limits with liquidated damages assessed under Article 108.09 for reopening-date failures. The contractor must coordinate with concurrent Contract 74650 for bridge superstructure work within overlapping project limits. Awards go to the lowest responsive and responsible bidder; IDOT reserves the right to reject any or all proposals.

Opportunity text

2 versions

Update #2 · Latest ·

This project consists of reconstructing the interchange configuration from a cloverleaf to a raindrop diamond. The reconstruction includes the removal and replacement of the I-57 structures over IL 16, removal of the I-57 structures over the Lincoln Prairie Grass Trail, and replacement of those structures with a cast-in-place box culvert. Additional work includes pavement patching, milling, HMA resurfacing, HMA pavement (full-depth), PCC pavement, shoulders, curb and gutter, PCC sidewalk, medians, storm sewer, pipe culverts, precast box culverts, guardrail, guardrail shoulder stabilization, pavement marking, signs, pavement removal, paved shoulder removal, drainage structure removals, earth excavation, seeding, and any other work necessary to complete this section. Location: This project is located on I-57 at the I-57 interchange with IL 16, east of Mattoon in Coles County. Work on I-57 begins 0.5 miles south of IL 16 and continues to 1 mile north of IL 16. Work on IL 16 begins just east of Swords Dr. and ends just west of Lerna Road.

Update #1 ·

This project consists of reconstructing the interchange configuration from a cloverleaf to a raindrop diamond. The reconstruction includes the removal and replacement of the I-57 structures over IL 16, removal of the I-57 structures over the Lincoln Prairie Grass Trail, and replacement of those structures with a cast-in-place box culvert. Additional work includes pavement patching, milling, HMA resurfacing, HMA pavement (full-depth), PCC pavement, shoulders, curb and gutter, PCC sidewalk, medians, storm sewer, pipe culverts, precast box culverts, guardrail, guardrail shoulder stabilization, pavement marking, signs, pavement removal, paved shoulder removal, drainage structure removals, earth excavation, seeding, and any other work necessary to complete this section. This project is located on I-57 at the I-57 interchange with IL 16, east of Mattoon in Coles County. Work on I-57 begins 0.5 miles south of IL 16 and continues to 1 mile north of IL 16. Work on IL 16 begins just east of Swords Dr. and ends just west of Lerna Road.

Files

File Type Posted
ILDOT 74435-067.pdf PDF
Reconstructing the I-57 and IL 16 Interchange.pdf PDF