The City of Long Beach Department of Public Works is requesting bids for installation of five dual-port Direct Current Fast Chargers and a Battery Energy Storage System at a Fleet Services EV Charging Depot, with bids due November 20, 2026 at 11:00 a.m. and a mandatory pre-bid conference and jobsite walk-through on October 27, 2026.

The project is subject to a Small Business Enterprise (SBE) Program combined goal requirement, a Citywide Project Labor Agreement establishing prevailing wage requirements and a 40 percent local hiring goal, and California prevailing wage rates. Contractors must be signatories to the International Brotherhood of Electric Workers (IBEW), hold a valid California Class B Contractor license and C-10 electrical contractor's license, and be Electric Vehicle Infrastructure Training Program (EVITP) certified. Bidders must demonstrate minimum qualifications by documenting completion of at least three similar projects valued at $2 million or more within the past five years for public agencies.

The scope includes installation of electrical equipment, new switchgear, conduit, copper wiring (approximately 21,880 linear feet), electrical panels, transformers, and switchboards; concrete foundations; hardscape and site improvements including asphalt restoration and ADA compliance features; and complete commissioning and testing. The design incorporates advanced microgrid control technology, fire safety features meeting NFPA 855 and UL 9540, and seismic loading design per ASCE 7-16.

The contract term is 180 calendar days from the Notice to Proceed. Bid security of 10 percent is required. The City will award the contract to the lowest responsible bidder and reserves the right to reject any or all bids. The pre-bid conference convenes at 10:00 a.m. via Microsoft Teams; the site walk occurs at 1:00 p.m.

Opportunity text

The work to be done consists primarily of installation of 5 dual-port Direct Current Fast Chargers (DCFC) for Electric Vehicle (EV) charging as well as a Battery Energy Storage System (BESS) connected to the charging equipment. Work will include installation of electrical equipment, new switchgear, conduit, wiring, and all hardscape and site improvements necessary to facilitate component installation. Bids are required for the entire Work.