This document is a pre-bid conference presentation for the Fleet Services EV Charging Depot Project (R-7282) conducted by the City of Long Beach Public Works Department. The project involves the installation of five dual-port Direct Current Fast Chargers (DCFC) for electric vehicle charging, a Battery Energy Storage System (BESS), and associated electrical infrastructure including switchgear, conduit, wiring, and site improvements. The mandatory pre-bid conference was held on October 27, 2026, at 10:00 A.M., with a mandatory site walk scheduled for the same day at 1:00 P.M. at the Fleet Services Department located at 2600 Temple Avenue, Long Beach. Requests for Information (RFI) were due by November 10, 2026, at close of business, with responses posted by November 13, 2026. Bids must be submitted electronically through Long Beach Buys by November 20, 2026, at 11:00 A.M., with contract award and notice to procure estimated for early 2027. The project has an engineer's estimate of $2.5 million and a construction duration of 180 calendar days, not inclusive of long lead items. Attendance at the pre-bid conference was mandatory, with contractors required to email confirmation to Justin.Beck@longbeach.gov by 5:00 P.M. on October 27, 2026.

Contractors must hold both Class B and Class C-10 licenses and provide 10 percent bid security. A 15 percent self-performance requirement applies to the contract. The Long Beach Small Business Enterprise (LBSBE) Program has assigned a combined goal of 10 percent, requiring bidders to either meet the goal or submit documented Good Faith Efforts with a minimum score of 70 percent. All contractors and subcontractors must be registered with the California Department of Industrial Relations (DIR) and comply with prevailing wage requirements for 2026-2. The project is subject to a Project Labor Agreement (PLA) allowing both union and non-union contractors to bid, with non-union contractors required to follow a 1:1 alternating referral procedure between core employees and union referrals. PLA requirements include a 40 percent local resident hiring goal, 10 percent transitional worker and veteran participation, and a 30 percent apprentice goal per craft. The site is an active operations facility that will remain open during construction, requiring contractors to coordinate any closures and restore parking and drive aisles daily. Bidders must acknowledge all issued addenda, submit complete Division C documents online (except notarized bonds to the City Clerk), and avoid common submission errors including blank LBSBE forms, $0.00 bid items, incomplete subcontractor information, and mobilization costs exceeding 5 percent of the total bid.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pre-Bid Meeting October 27, 2026 10:00 A.M.

Fleet Services EV Charging Depot Project R-7282

Fleet Services EV Charging Depot R-7282 Agenda

1. Project Team

2. Location

3. Project Overview & Scope of Work

4. Bid Requirements

5. Project Requirements

a. Construction & Demolition Program

b. Labor Compliance

c. PLA

6. Long Beach Buys

7. Bid Schedule

8. RFI & Item Equivalency Request

9. Pre-Bid Conference Sign In [MANDATORY]

10. Common Reasons A Bidder May Be Deemed Non-

Responsive

** IMPORTANT **

Email Justin.Beck@longbeach.gov to Sign In and confirm attendance at today’s Mandatory Pre-Bid Conference. Instructions to follow.

Please remember to use the mute button whether joining from a computer or phone to avoid disruption during the meeting mailto:Justin.Beck@longbeach.gov

R-7282

Introductions

Public Works Justin Beck, Capital Projects Coordinator

Fleet Services Hannah Abdoo, Fleet Compliance Officer

Buro Happold Architect

JOA

Construction Management

Financial Management Labor Compliance

• James Vazquez, Labor Compliance Analyst

• LaborCompliance@longbeach.gov Project Labor Agreement (PLA)

• Nicholle Moore, PLA Administrator

• Sokko Kong, PLA Coordinator

• Nicholle.Moore@longbeach.gov

• Sokko.Kong@longbeach.gov Long Beach Buys LBPurchasing@longbeach.gov mailto:LaborCompliance@longbeach.gov mailto:LaborCompliance@longbeach.gov mailto:Nicholle.Moore@longbeach.gov mailto:Nicholle.Moore@longbeach.gov mailto:Sokko.Kong@longbeach.gov mailto:Sokko.Kong@longbeach.gov mailto:LBPurchasing@longbeach.gov

R-7282

Project Location:

Fleet Services Department 2600 Temple Ave, Long Beach

Site is shared with:

• City Refuse Operations

• Transportation and Parking

Enforcement

• Towing Operations

R-7282

Project Overview and Scope of Work

DESCRIPTION OF WORK: The work to be done consists primarily of installation of 5 dual-port Direct Current Fast Chargers (DCFC) for Electric Vehicle (EV) charging as well as a Battery Energy Storage System (BESS) connected to the charging equipment. Work will include installation of electrical equipment, new switchgear, conduit, wiring, and all hardscape and site improvements necessary to facilitate component installation.

Bids are required for the entire Work.

*Chargers and related equipment are provided by Owner for Contractor to install. All other electrical materials and equipment, including BESS, are Contractor provided.

Division A, Description of Work, Page A-1

R-7282

Project Overview and Scope of Work (continued)

ENGINEER’S ESTIMATE: $2.5M

DURATION OF WORK: 180 calendar days (not inclusive of all long lead items)

R-7282

Staging and Phasing Plan

• Site is an active operations site and will remain open during construction

• Contractor will be expected to coordinate in advance any closure to drive aisle or parking spaces outside of identified laydown areas

• Expectation to restore parking and drive aisle by the end of each day

R-7282

Bid Requirements

• Required License: Class B and Class C-10 – see Division A, Contractor’s License, Page A-2

• Bid Security: 10% - see Division A, Bid Security, Page A-2

• Self Performance: 15% - see Division H, Section 2-3.2, Page H-5

• Contractor Minimum Qualifications: see Division C

• Contractor to review all issued addenda and provide signature acknowledgment as required – see Division B, Addenda Acknowledgment, Page B-4

• Submission of Bids

• Electronic submittal through Long Beach Buys ONLY – see Division B, Delivery of Bids, Page B-4

• Note: Allow enough time for bid submittal as the system will close at the bid opening time

• Bid Opening: Electronic submittal through Long Beach Buys through November 20, 2026 at 11:00 A.M – see Division A, Receipt of Bids, Page A-1

• We will NOT accept any bids through email.

R-7282

Bid Requirements (continued)

R-7282

Construction and Demolition Plan

• Contractor is responsible for C&D deposit and plan management. The City no longer accepts a surety bond in lieu of the C&D deposit fees

• City will pay for administrative fee

• Refer to Division E for full copy of bulletin

State Labor Compliance Requirements (State of California) This project will be subject to State of California Prevailing Wage regulations (Labor Code § 1720). All workers employed on this public works project must be paid the prevailing wage determined by the Director of the Department of Industrial Relations (DIR).

The prevailing wage rage for this project is 2026-2. Please refer to sections:

• Division A (Notice Inviting Bids), A3-A4

• Division D (Sample Contract), Sections 11 thru 13

Contractor Registration • All contractors and subcontractors listed in a bid and working on this project must be registered with the DIR, pursuant to Labor Code §1725.5.

• Bids from unregistered contractors will be deemed non-responsive. Contractors who are required to register but fail to do so are ineligible to bid or work on a public works contract and can be removed from any public works project on which they currently are working. Prime contractors are responsible for ensuring all tiers of subcontractors are registered.

Prime Contractor Responsibilities The awarded Prime Contractor is responsible for subcontractor compliance to applicable prevailing wage laws.

Apprenticeship Compliance Apprenticeship requirements apply to contracts $30,000 or more, per Labor Code § 1777.5. Requirements include:

• Submittal of Division of Apprentice Standards - DAS 140 and 142 forms.

• Minimum of 1 hour of apprentice work for every 5 hours of journeyman work (per craft).

• Training Fund Contributions (CAC-2) must be paid for every hour worked.

Certified Payroll Records (CPRs) CPRs must be uploaded weekly in LCPtracker and DIR on-line CPR portal. Only Project Labor Agreement covered contracts are exempt from uploading CPRs to DIR.

Pre-Construction Meeting Meeting will be held to review all prevailing wage requirements prior to work commencing.

Labor Compliance Consultant • The City will assign a labor compliance consultant who will monitor the project and support the contactor/vendor with prevailing wage requirements.

• Consultant will request ancillary payroll documents on a monthly basis via “Discrepancy Notice”. It is the prime contractor's reasonability to provide requested documents within the time frame specified in the notice.

• On-site interviews of workers will be performed, at random and without advance notice to the prime contractor.

Labor Compliance Withhold Labor Compliance withholds will be held on progress payments when contractors are noncompliant with requested payroll documents.

For additional resources please see: https://www.dir.ca.gov/Public-Works/PublicWorks.html

Long Beach Small Business Program (LBSBE) This project is subject to the Long Beach Small Business Enterprise Program (“LBSBE Program”). A LBSBE combined goal of 10% has been assigned to this project.

Proposers must either 1) meet the goal OR 2) provide Good Faith Efforts (GFE) documentation to meet the goal. Failure to meet the goal (or submit documented good faith efforts) may disqualify bidding/proposing firms from being considered for award of the contract.

The City has 3 forms of small business categories:

The SBE Participation goal can be achieved in the following manner(s):

Category Qualification

Small Business Enterprise (SBE) Qualifies per SBA standards- Annual Gross Revenue or Total Number of Employees.

Very Small Business or Microbusiness (VSBE) Gross annual receipts are $5 million or less.

Local Small Business Enterprise (LBSE) The business must have a current, valid business license from the City of Long Beach showing a place of business within City limits.

Business Type How to Qualify

Non-SBE Prime Contractors/Consultants Shall meet combined SBE/VSBE/LSBE participation goal by subcontracting work to at least 2 of the following certification types: SBE, VSBE, LSBE; or document and submit an acceptable good faith effort for their bid or proposal to be deemed responsive.

SBE Prime Contractors/Consultants If your firm has a valid SBE status in Long Beach Buys, you must subcontract out to a VSBE or LSBE businesses in order to achieve the combined goal, or document and submit an acceptable good faith effort, for their bid or proposal to be deemed responsive.

VSBE or LSBE Prime Contractors/Consultants Deemed to have met the components of the combined SBE/VSBE/LSBE participation goal if the percentage of work the Prime participates in is equal to or greater than the project specific goal.

If Requirement is Met: No GFE forms required.

If Requirement is Not Met: Bidder must submit:

• Completed GFE form

• All supporting documentation listed in the GFE checklist

If you cannot demonstrate the 10% goal commitment, then you MUST demonstrate GFE with a minimum score of 70%. Each GFE is weighted by 10%.

Examples of good faith efforts can include, but are not limited to:

• Attend the Pre-bid/Pre-Proposal Meeting

• Subdivide the Work

• Advertise

• Use Public Databases (use various public databases to search for SBE/VSBE/LSBEs)

• Directly Solicit Small Businesses

• Provide Relevant Information to Interested Small Businesses

• Conduct Follow-Up

• Offer Assistance (assist small businesses in obtaining bonding, insurance or equipment)

• Negotiate (submit written evidence that he/she has negotiated in good faith with interested small businesses)

• Document Bid and Negotiation Results

The key is to document all efforts made to locate small businesses. See details and forms on the City’s LBSBE program refer to sections:

o Division A (Notice Inviting Bids), Page XXX o Division C (Bid Documents), LBSBE Forms o Division E (Federal, State and Local Requirements), LBSBE Guidelines

Contractor/Consultant will be required to submit monthly utilization reports to the assigned labor compliance consultant in order to track goal attainment, details of these requirements will be provided in the City’s Labor Compliance Pre-Construction Meeting.

Required LBSBE Forms:

• Attachment A - LBSBE Program Acknowledgement - Required with ALL Bid/Proposal Submissions.

• Attachment B - LBSBE Program Commitment Plan - Required with ALL Bid/Proposal Submissions.

• Attachment C- Good Faith Effort/Statement of GFE Compliance – Required only if you have not demonstrated goal attainment on

Attachment B. Highly recommend to always submit!

http://lbnet/globalassets/department/fm/documents/purchasing/labor-compliance/lbsbe-attachment-a_acknowledgement.pdf http://lbnet/globalassets/department/fm/documents/purchasing/labor-compliance/lbsbe-attachment-a_acknowledgement.pdf http://lbnet/globalassets/department/fm/documents/purchasing/labor-compliance/lbsbe-attachment-b_awardee-committment.pdf http://lbnet/globalassets/department/fm/documents/purchasing/labor-compliance/lbsbe-attachment-b_awardee-committment.pdf http://lbnet/globalassets/department/fm/documents/purchasing/labor-compliance/lbsbe-attachment-c_good-faith-effort.pdf

Attachment A - LBSBE Program Acknowledgement Attachment B - LBSBE Program Commitment Plan

Attachments A & B are required at Bid Submittal http://lbnet/globalassets/department/fm/documents/purchasing/labor-compliance/lbsbe-attachment-a_acknowledgement.pdf http://lbnet/globalassets/department/fm/documents/purchasing/labor-compliance/lbsbe-attachment-b_awardee-committment.pdf

Attachment C- Good Faith Effort/Statement of GFE Compliance Required only if you have not demonstrated goal attainment on Attachment

Highly recommend to always submit and include back up documentation!

http://lbnet/globalassets/department/fm/documents/purchasing/labor-compliance/lbsbe-attachment-c_good-faith-effort.pdf

• Contractors MUST have a valid LBSBE certification in Long Beach Buys to count towards goal attainment.

• Refer to the LBSBE Program Guidelines included in the bid.

• Any subcontractors listed in the commitment goal must have a valid a LBSBE certification within Long Beach Buys.

• To register as a SBE in Long Beach, please see Long Beach Buys:

• Helpful Resources for Vendors - Resource Guide: City of Long Beach Small Business Enterprise Certification

• To locate certified LBSBE businesses, please see Long Beach Buys:

• Helpful Resources for Vendors - Resource Guide: LBSBE Vendor Search

• Ensure you are filling out your LBSBE Program Commitment Plan (Attachment B) accurately. When in doubt, list all your subcontractors.

• Please email or call us for additional questions: sbe@longbeach.gov or

(562) 570-WAGE .

• For more information see: https://www.longbeach.gov/finance/business-info/compliance/small-business-enterprises https://www.longbeach.gov/globalassets/finance/business-info/compliance/2022-lbsbe-program-bidder-instructions https://www.longbeach.gov/globalassets/finance/media-library/documents/long-beach-buys/how-to-change-roles--lbsbe-program-qualifications https://www.longbeach.gov/globalassets/finance/media-library/documents/long-beach-buys/how-to-change-roles--lbsbe-program-qualifications https://longbeachbuys.buyspeed.com/bso/view/login/login.xhtml https://www.longbeach.gov/globalassets/finance/business-info/doing-business-with-us/long-beach-buys---lbsbe-vendor-search-steps https://www.longbeach.gov/globalassets/finance/business-info/doing-business-with-us/long-beach-buys---lbsbe-vendor-search-steps mailto:sbe@longbeach.gov https://www.longbeach.gov/finance/business-info/compliance/small-business-enterprises https://www.longbeach.gov/finance/business-info/compliance/small-business-enterprises https://www.longbeach.gov/finance/business-info/compliance/small-business-enterprises https://www.longbeach.gov/finance/business-info/compliance/small-business-enterprises https://www.longbeach.gov/finance/business-info/compliance/small-business-enterprises https://www.longbeach.gov/finance/business-info/compliance/small-business-enterprises https://www.longbeach.gov/finance/business-info/compliance/small-business-enterprises

R-7282

Project Requirements – Project Labor Agreement

Union vs Non-Union Contractors: Both Union and Non-Union Contractors are eligible to bid and win the award of Public Works Contracts that are subject to the PLA. Non-Union Contractor Core workforce may still be used on a 1:1 ratio per craft.

Letter of Assent: By accepting the award of a construction contract for the project as a contractor or subcontractor, the contractor/employer agrees to sign the Letter of Assent and be bound by each and every provision of the PLA.

Union Trust Fund Subscription Agreements: Shall be signed by non-union contractors with the appropriate union trust fund(s) to cooperate for this project without becoming signatory to the union.

PLA Pre-Con/Pre-Job Conference: A PLA Administrator will be assigned to the project after award which will review the PLA in detail to assist with compliance. Each prime contractor will conduct a pre-job conference with the unions prior to commencing work.

Certified Payroll Reports: All contractors will use LCPTracker to submit certified payroll reports and other Labor Compliance and PLA documentation. Proper prevailing wage payments and documentation are required for invoice payment.

R-7282

Project Requirements – Project Labor Agreement (continued)

Fringe Benefit Contributions to be made on behalf of craft workers to union trust fund(s).

Craft Worker Hiring Procedure requires non-union contractors to follow an alternating referral procedure between core employees and union referrals:

Contractor’s Core Workforce Union Referral 1st employee (core) 2nd employee (union) 3rd employee (core) 4th employee (union) 5th employee (core) 6th employee (union) 7th employee (core) 8th employee (union) 9th employee (core) 10th employee (union)

R-7282

Project Requirements – Project Labor Agreement (continued)

• 40% of all hours of Project Work shall be performed by Local Residents within zip codes specified within Attachment B.

• 10% of total hours worked shall be performed by Transitional Workers and/or veterans and requires completion of a form to determine qualification for each worker.

• Apprentices – There is a 30% Apprentice goal for each craft/workforce

• Contractors must document all good faith efforts made to locate and hire Local Residents including copies of facsimile transmittals to the Jobs Coordinator.

• Jobs Coordinator – Required for all PLA projects. The Jobs Coordinator will work closely with staff, the trades and contractors to meet all hiring goals.

• Outreach to Helmets to Hardhats and partnerships with local pre-apprenticeship programs and union apprenticeship programs.

R-7282

Long Beach Buys https://longbeachbuys.buyspeed.com/bso/

* Search Keyword: R-7282

Resources can be found on the Homepage

Seller Guidance document can be found on the Bid Solicitation

Please email LBPurchasing@longbeach.gov or call 562-570-6200 if you need assistance with Long Beach Buys https://longbeachbuys.buyspeed.com/bso/

R-7282

Bid Schedule – Important Dates

Bid Advertisement Date Wednesday, October 14, 2026 Mandatory Pre-Bid Conference Tuesday, October 27, 2026, at 10:00 A.M.

Mandatory Site Walk* Tuesday, October 27, 2026, at 1:00 P.M.

Request for Information (RFI) due Tuesday, November 10, 2026, close of business Bid Opening (Bid Due Date) Friday, November 20, 2026, at 11:00 A.M.

Contract Award and Notice to Procure

Estimated Early 2027

*Site is 24/7 restricted access. Bidders will not be able to tour and inspect location outside of scheduled site-walk

R-7282

Site Walk Parking Info

Fleet Services Entrance

Additional Parking

Parking

• Entrance is on Temple Ave.

• Proceed through the gate, which will be open.

• Park in the yellow parking areas.

• Site walk will begin promptly at 1pm at the green meeting area across from the car wash.

Meeting Area

Fire and Heavy Line

Car Wash

R-7282

Request for Information (RFI) & Item Equivalency Request Deadline

Please send any Request for Information (RFI) or questions to Justin Beck, Capital Projects Coordinator, at Justin.Beck@longbeach.gov by Tuesday, November 10, 2026 close of business.

Responses will be posted to Long Beach Buys by close of business Friday, November 13, 2026.

Note: The City will NOT respond to RFIs or questions after Tuesday, November 10, 2026.

R-7282

Pre-Bid Conference Sign In [MANDATORY]

IMPORTANT: The Contractor attending today’s Virtual Pre-Bid Conference Meeting is responsible for signing in by sending an e-mail to Justin Beck, Capital Projects Coordinator, at Justin.Beck@longbeach.gov by today, October 27, 2026 before 5:00 P.M (Pacific Time)

Include in the e-mail:

• Company, Address, City, State, Zip Code and Phone Number

• Company Representative who attended the Pre-Bid Meeting

• Indicate if Prime or Subcontractor

FAILURE TO SEND THE PRE-BID SIGN-IN E-MAIL WILL RESULT IN YOUR BID BEING

REJECTED AS ATTENDANCE AT THE PRE-BID CONFERENCE IS MANDATORY. See Notice Inviting Bids – Division A.

R-7282

Common Reasons A Bidder May Be Deemed Non-Responsive

• LBSBE Program Requirements:

• LBSBE Certifications expire; Subcontractors must provide a valid LBSBE certificate to the Prime, or the Prime can email sbe@longbeach.gov to confirm Prime/Subcontractor has a valid LBSBE certificate.

Please email in advance of bid closing.

• Good Faith Effort (GFE) not submitted; recommend submitting even if you believe you’ve met the goal just in case.

• GFE needs to clearly document outreach efforts such as time-stamped emails, methods of outreach to subs, names of subs contracted, etc.

• Do not submit blank or incomplete LBSBE forms. Blank forms will deem the bid non-responsive.

• Not Completing All Bid Items:

• Each bid item must have a value other than $0.00. If $0.00 is submitted for a bid item, the bid will be nonresponsive. All bid items should reflect the true value of the work being performed for that bid item.

• Leaving “No bid” box checked will return “No bid” for that line item which will make a bid non-responsive.

mailto:sbe@longbeach.gov

R-7282

Common Reasons A Bidder May Be Deemed Non-Responsive (cont.)

• Not acknowledging all addenda:

• Issued addenda will have an acknowledgment signature as a backup in case bidders cannot acknowledge online

• Not submitting bond documents:

• Submitting copies of bond documents in LB Buys but failing to submit physical copies of notarized bond documents to the City Clerk prior to the bid deadline.

• Original bonds must be mailed or hand delivered before the bid deadline.

Subcontractor listing:

• Failing to submit complete subcontractor information may result in GC responsible for self-performing work intended for subcontract.

• Subcontractors must be DIR registered at bid deadline.

R-7282

Common Reasons A Bidder May Be Deemed Non-Responsive (cont.)

• Division C Documents:

• Failing to upload/submit Division C documents on LB Buys

• All Division C documents must be submitted online except for bid bonds – notarized original copy must be submitted to the City Clerk.

• Not signing in at the Mandatory Pre-Bid Conference

• Mobilization cannot exceed 5% of bid, refer to Div. C mobilization cap

• Bid submission issues with LB Buys:

• Bidders are urged to familiarize themselves with the LB Buys system ahead of time and reach out to Purchasing with questions.

• Avoid submitting the bid at the very last minute as there may be errors with submission.

• Purchasing contact information: LBPurchasing@longbeach.gov , 562-570-6200.

R-7282

Final Reminders

• Email Justin.Beck@longbeach.gov to Sign In

• Include in the e-mail:

• Company, Address, City, State, Zip Code and Phone Number

• Company Representative who attended the Pre-Bid Meeting

• Indicate if Prime or Subcontractor

• Bids are due on Long Beach Buys by November 20, 2026 at 11:00 A.M.

• Mandatory site walk is today, 10/27, at 1:00 P.M.

PLEASE GET YOUR BIDS AND BONDS IN EARLY!

longbeach.gov/pw

Labor Compliance Help:

LaborCompliance@longbeach.gov

SBE Help:

SBE@longbeach.gov

562-570-WAGE

Long Beach Buys Help:

LBPurchasing@longbeach.gov

562-570-6200

Thank You!

PLA Help:

Nicholle Moore, PLA Administrator

Nicholle.Moore@longbeach.gov 562-570-7158

Sokko Kong, PLA Coordinator Sokko.Kong@longbeach.gov

562-570-3728

Justin Beck, Capital Projects Coordinator Justin.Beck@longbeach.gov mailto:LaborCompliance@longbeach.gov mailto:SBE@longbeach.gov mailto:LBPurchasing@longbeach.gov mailto:Nicholle.Moore@longbeach.gov mailto:Sokko.Kong@longbeach.gov mailto:Justin.Beck@longbeach.gov

Slide Number 1
Slide Number 2
Slide Number 3
Slide Number 4
Slide Number 5
Slide Number 6
Slide Number 7
Slide Number 8
Slide Number 9
Slide Number 10
Slide Number 11
Slide Number 12
Slide Number 13
Slide Number 14
Slide Number 15
Slide Number 16
Slide Number 17
Slide Number 18
Slide Number 19
Slide Number 20
Slide Number 21
Slide Number 22
Slide Number 23
Slide Number 24
Slide Number 25
Slide Number 26
Slide Number 27
Slide Number 28
Slide Number 29

File details come from the government source that posted it. Updated .