About this opportunity
The Ohio Department of Natural Resources (ODNR), Division of Parks and Watercraft, is soliciting bids for an underground electrical replacement and directional bore installation project at Cowan Lake State Park Campground in Clermont County. The procurement seeks a contractor to replace the underground electrical service between Pedestal 20 and the distribution panel, spanning approximately 150 feet and supplied by a 150-amp breaker. Specific project requirements include performing a directional bore beneath the roadway, installing a new underground conduit pathway, excavating bore pits, integrating the new conduit with the existing electrical system, and installing new electrical conductors. The contractor must coordinate with the Ohio Utilities Protection Service (OUPS) to locate all utilities, make necessary electrical connections, conduct functionality testing, and ensure code compliance. The project also mandates backfilling bore pits and completing final site restoration, including seeding and straw. The bid is due on July 17, 2025, and bidders are encouraged to visit the site prior to submission. Contract award will be based on the lowest responsive and responsible bidder, determined by calculating the low lot total through multiplying unit costs by estimated usage.
No specific set-aside designations or restrictions for disadvantaged enterprises were explicitly outlined in the procurement documents. The project will be located at Cowan Lake State Park Campground at 1750 Osborn Road in Wilmington, Ohio, with Stephanie Oberlin serving as the point of contact. While no incumbent vendor was mentioned, the project involves integrating with existing electrical infrastructure at the campground. The procurement documents do not specify a precise budget range or award value for the electrical service restoration project. Contractors must be prepared to provide all necessary labor, equipment, and materials, and will be responsible for all risks of loss until the deliverable is accepted by the state. Additionally, the successful bidder must complete an Affirmation and Disclosure Form, which requires detailed information about service locations and data management practices, and affirm compliance with executive orders regarding offshore services and data storage.
Opportunity text
PWC SW L Cowan Lake Electrical Service Restoration For Campsite 13-20 MAC042 The Ohio Department of Natural Resources is requesting bids for: Division of Parks and Watercraft Cowan Lake State Park Name or Title of the Service or Supply: Underground Electrical Replacement and Directional Bore Installation for Power Refeed to Pedestals 13-20 Ordering Division and address: Division of Parks and Watercraft Cowan Lake State Park 1750 Osborn Road, Wilmington, OH 45177 Specifications : Underground Electrical Replacement and Directional Bore Installation The supplier shall provide all necessary labor, equipment, and materials to replace the underground electrical service between Pedestal 20 and the distribution panel, a distance of approximately 150 feet. This electrical line is supplied by a 150-amp breaker. This includes locating all utilities within the designated work area, in coordination with the Ohio Utilities Protection Service (OUPS). The contractor shall perform a directional bore beneath the roadway to install a new underground conduit pathway between the distribution panel and Pedestal 20. This will involve excavation of bore pits at both connection points, integration of the new conduit with the existing system, and installation of new electrical conductors through the completed duct. All required electrical connections shall be made, and testing shall be performed to ensure proper functionality and compliance with applicable codes. Upon completion, all bore pits are to be backfilled with the original excavated material. Final site restoration, including seeding and straw, is to be included in this scope of work. Delivery Cowan Lake State Park Campground 1750 Osborn Road Wilmington, OH 45177 Stephanie Oberlin 937-499-4834 Stephanie.Oberlin@dnr.ohio.gov F.O.B. DESTINATION/PRE-PAID/ALLOWED. The Contractor must provide Deliverables under this Contract F.O.B. Destination/Pre-Paid/Allowed. The place of destination will be specified by the Ordering Agency on the agency's purchase order or other ordering document. Cost of the freight must be borne and paid by the Contractor unless otherwise stated. All risk of loss, regardless of the cause, will remain with the Contractor until title to the Deliverable passes to the State. Unless otherwise provided in this Contract, the State will determine whether the Contractor provided each Deliverable required in this Contract and has fully met all work requirements of this Contract. Title to any Deliverables will pass to the State on Acceptance of the Deliverable. Evaluation. The contract will be awarded to the lowest responsive and responsible bidder as determined by the State. Contract Award. The contract will be awarded to the lowest responsive and responsible bidder by low lot total. Low lot total will be determined by multiplying the unit cost by the estimated usage listed in the bid and then adding each of the totals together to arrive at a total for all items. Failure to bid all items may result in the bidder being deemed not responsive Site Visit & Point of Contact If bidders do not need to schedule an appointment, use the following: Prior to submitting a bid response, offerors are encouraged to visit the Cowan Lake State Park Campgroud Sites 13-20. Cowan Lake State Park Campground, 1750 Osborn Road, Wilmington, OH 45177 Stephanie Oberlin 937-499-4834 Once a contract is awarded, failure of the bidder to have requested a site visit to become familiar with the facility and requirements of the bid will be insufficient reason to support any request to be released from the contract.
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity