PWC Burr Oak Hammock Shelters

Solicitation # SRC0000034090
Posted 9/19/25, 12:00 AM
No Updates
Due 10/17/25, 10:00 AM
State
Ohio
Source
View
Similar Opportunities
The Ohio Department of Natural Resources (ODNR) is seeking competitive bids for the installation of new doors at Rocky Fork State Park's campground shower houses. The procurement involves replacing doors at multiple locations, specifically Shower House #1 and #2, with a total of five 18-gauge hollow steel doors. Required specifications include installing steel frames without glass, stainless steel hinges with heavy-duty closers, pull handles, push plates, kick plates, aluminum thresholds, and...
The Ohio Department of Natural Resources (ODNR) is seeking a contractor to replace epoxy flooring in two shower houses and one bathroom at Salt Fork State Park, located in Geauga County. The project involves installing decorative epoxy flake coating across 36 shower stalls (approximately 144 square feet per shower house) and a restroom building (106 square feet per side). Contractors are required to perform complete floor preparation, including tile removal, surface grinding, moisture barrier...
The Ohio Department of Natural Resources (ODNR), Division of Oil & Gas Resources Management, is soliciting bids for a construction project at the Salt Fork Office located in Kimbolton, Ohio. The procurement involves a comprehensive interior renovation requiring a contractor to provide all labor and materials for installing new wall partitions, owner-provided carpet panels, removing and replacing rubber cove base, installing a new door with frame and hardware, and painting walls and door...
The Ohio Department of Natural Resources (ODNR), Division of Oil & Gas Resources Management, is seeking a contractor to complete partition installation and renovation work at the Salt Fork Office located in Kimbolton, Guernsey County, Ohio. The project requires comprehensive interior renovation, including installing new wall partitions, owner-provided carpet panels, removing and replacing existing rubber cove base, installing a new door with frame and hardware, and painting walls and door...
The Ohio Department of Natural Resources (ODNR) is seeking a contractor for the Portage Lakes North Reservoir Turf Improvement project, which involves re-establishing vegetation across four distinct treatment areas totaling approximately 113,430 square feet. The project scope requires comprehensive soil amendment through cultivation, raking, aeration, topsoil spreading, and seeding with specific grass mixtures in locations including Iola Drive Lawn, Dollar Drive Lawn, Rhundles Portage Drive...
The Ohio Department of Natural Resources (ODNR) is seeking to procure playground equipment clevises for Beaver Creek State Park through a Request for Quotation (RFQ) issued on September 19, 2025. The specific procurement involves acquiring 6 double toddler swing clevises and 4 regular swing clevises that must meet ASTM and CPSC commercial playground equipment guidelines. The goods are to be delivered to Guilford Lake State Park in Lisbon, Ohio by October 10, 2025, with the contract term...
The Ohio Department of Natural Resources (ODNR), specifically the Division of Forestry, is seeking bids for a JLG 450AJ Articulating Boom Lift to be delivered to the Buckeye State Tree Nursery in Zanesville, Ohio. The procurement targets a new boom lift with precise technical specifications, including a 45-foot platform height, 25-foot horizontal outreach, and a 550-pound platform capacity. Bids are due by October 3, 2025, with a desired delivery date of December 5, 2025, and the contract will...

The Ohio Department of Natural Resources (ODNR) is seeking bids for the design and construction of two hammock shelters at Burr Oak State Park, located in Glouster, Ohio. The project requires constructing two open shelters, each with 12' x 12' exterior dimensions, featuring treated 6x6 post construction and a hip roof with a minimum 3-foot overhang on all sides. Specific deliverables include a 14' x 14' treated lumber wood deck, a dark brown metal roof using 26-gauge minimum material, and exterior lumber stained with a Sherwin Williams semi-transparent stain. The successful contractor must obtain applicable building permits, coordinate inspections with the Ohio Department of Commerce, and provide stamped plans with engineer-certified as-built drawings. The project is partially funded by federal funds from the United States Department of Commerce, Economic Development Administration, which triggers compliance with Davis-Bacon Act requirements. The bid is due on October 17, 2025, with all work to be completed by April 30, 2026, and contractors are encouraged to visit the site prior to bidding by contacting Jerry Pollock or Phil Melillo.

The contract opportunity emphasizes the participation of minority and diverse businesses, with the Ohio Department of Natural Resources encouraging the use of Minority Business Enterprises (MBE) and Executive Diversity, Growth and Equity (EDGE) vendors. Contractors must comply with various state and federal requirements, including maintaining a drug-free workplace, adhering to ethics laws, and providing workers' compensation. The contract will be awarded to the lowest responsive and responsible bidder, determined by calculating the low lot total. While a specific budget range is not explicitly stated, the contract is valid through June 30, 2027, with invoices requiring detailed documentation. Contractors must also affirm compliance with Executive Orders regarding offshore services, ensuring all contract services and data handling occur within the United States. The project requires comprehensive insurance coverage, including commercial general liability, automobile liability, workers' compensation, and cyber liability, with specific minimum coverage limits to be maintained throughout the contract period.

Generated 9/20/25, 6:35 PM