- 91063 Public Utilities: Water, Sewer And Gas Maintenance And Repair
- 91360 Construction, Water System/Plants, Main And Service Line
- 91392 Maintenance And Repair, Water System, Main And Service Line
- 92597 Water Supply, Treatment, And Distribution/Engineering
- 96185 Utility Services, Water
- 96191 Water And Petroleum Pipeline Services
- UNSPSC codes
- 72121505 Waste water and sewage treatment plant construction service
- 81101501 Well engineering
- 83100000 Utilities
- 71131417 Organic fouling control services
- 78102103 Pipeline inline inspection service
- 95121810 Irrigation and flood control waterworks
- 83101601 Supply of natural gas
- 83101603 Oil pipeline services
- 83101802 Supply of two phase electricity
- 83101803 Supply of three phase electricity
Show all 47
- 71131406 Iron sulfide deposit removal services
- 71131410 Pipeline cleaning services
- 71131416 Impurity removal services
- 71131418 Bacterial and fungus control services
- 95121811 Aquaduct or other water supply conduit, except pipeline
- 81102400 Electrical power transmission engineering
- 83101800 Electric utilities
- 70171607 Water pricing services
- 83101604 Gas pipeline services
- 83101801 Supply of single phase electricity
- 71131409 Chemical treatment monitoring services
- 71131413 Corrosion inhibiting services
- 78102101 Petroleum products transport
- 72121504 Waste disposal plant construction service
- 72141121 Water main construction service
- 72141125 Pumping station construction service
- 95121805 Well
- 95121804 Water tower
- 81101527 Wastewater engineering
- 81101528 Stormwater engineering
- 83101500 Water and sewer utilities
- 83101600 Oil and gas utilities
- 83101510 Chilled water
- 83101602 Supply of fuel oil
- 83101605 Gas facility charge
- 83101804 Electric power transmission services
- 83101805 Industrial electric power distribution
- 83101806 Rural electrical power distribution
- 83101807 Municipal electric power distribution
- 71131404 Sulfide scavenging services
- 71131405 Flow line hydrate formation control services
- 71131407 Squeeze modeling services
- 71131408 Hydrate formation modeling services
- 71131411 Pipeline flow enhancement services
- 71131414 Scale inhibiting services
- 71131415 Pipeline flow assurance services
- 78102102 Water transport
Opportunity details come from fortworthtexas.bonfirehub.com. Updated .
About this opportunity
The City of Fort Worth is requesting bids for the installation of approximately 1,530 linear feet of 24-inch PVC water line on Comancheria Way (City Project Number 106854), with electronic bids due August 13, 2026 at 2:00 p.m. CST and a non-mandatory pre-bid conference on August 7, 2026 at 10:00 a.m.
Bidders must be prequalified by the City at the time of bid opening for water distribution work involving 24-inch diameter pipe; prequalification applications are due seven calendar days prior to bid opening. The project is a Developer Awarded Project with GBTM Sendera LLC as the developer.
The scope comprises two units. Unit I includes approximately 1,530 linear feet of 24-inch PVC water line installed via open-cut method with one 20-linear-foot crossing encased in CSS backfill, two 24-inch gate valves with vaults, one 8-inch blow-off valve with a 6-foot manhole, one 4-inch combination air release valve with a 6-foot manhole, one connection to an existing 30-inch water main, and one 24-inch pressure plug. Unit II covers erosion control improvements: construction entrance, 1,548 linear feet of silt fence, and a washdown area. Bidders must be prequalified for water distribution and 24-inch water line work types as well as erosion control measures. The contractor must perform at least 35 percent of the work with its own organization unless approved otherwise by the City.
A bid bond equal to 5 percent of the maximum bid price, payable to the City and issued by an approved surety, is required. Upon award, the contractor must execute a contract within 14 days and provide performance, payment, and maintenance bonds. Liquidated damages are $500 per day for delays beyond the contract completion date. Award will be made to the lowest responsible and responsive bidder, pending City Council authorization within 90 days of bid opening.
Compliance requirements include worker's compensation certification under Texas Labor Code Section 406.096, conflict of interest certification or disclosure, and MBE/SBE participation goals per City of Fort Worth standard specifications. All contract documents are available through the City's Procurement Portal at fortworthtexas.bonfirehub.com/portal.
Opportunity text
The major work will consist of the (approximate) following: Approximately 1,530 linear feet of 24-inch PVC water line installed using open-cut method, with one crossing encased in approximately 20 linear feet of CSS backfill. This project includes two gate valves with vaults, one blow-off valve, and one 4-inch combination air release valve.