St. Mary Levee District is soliciting bids for Pump Station No. 9 Phase 2 pump equipment installation and construction in St. Landry Parish, Louisiana, with proposals due July 23, 2026.
The scope encompasses a limestone access road, electrical equipment yard and utility deck with steel H-piles and concrete pile caps, demolition and modifications to an existing pump station building to house variable frequency drives and controls, and full installation of four complete pumping systems (pumps five through eight). The installation includes pumps, discharge piping, dresser couplings, siphon breakers, motors, formed suction intake, level transducers, variable frequency drives, pump controllers, automatic transfer switches, switchboards, HVAC systems, electrical gear, generators, transformers, cables, conduits, and all appurtenances and connections required to deliver fully operational systems as detailed in the technical specifications.
The short timeframe between posting (July 17) and bid due date (July 23) affords six calendar days for proposal preparation.
Opportunity text
2 versions
Update #2 · Latest ·
The Contractor shall furnish all labor, materials, equipment, tools, supervision, and incidentals necessary to complete the work in accordance with the Contract Documents. The general scope of work includes mobilization, facility cleanup and preparation, surface cleaning (pressure washing) and preparation, removal and proper material disposal, metal building improvements, painting and protective coatings, electrical and lighting systems, removal and handling of existing pumping equipment and delivery to Owners designated location, procurement and installation of pumping equipment.
Update #1 ·
The scope of work for this Pump Equipment Installation and Construction Project for the St. Mary Levee District includes but is not limited to installation of a limestone access road, electrical equipment yard and electrical utility deck including installing steel H-piles and concrete pile caps, installing concrete pile caps under the discharge piping, performing demolition and modifications within an existing pump station building to house the variable frequency drives and controls, installation of pumps, discharge piping, dresser couplings and siphon breakers, motors, formed suction intake, level transducers, variable frequency drives, pump controllers, automatic transfer switches, switch boards, HVAC systems, electrical gear, generators, transformers, cables and conduits and all appurtenances and performing all connections and hookups necessary for providing fully operational pumping systems for pumps number five, six, seven and eight as further detailed in the enclosed technical specifications.