Gwinnett County, Georgia is soliciting bids for the Middle Yellow River Interceptor Sewer project, a comprehensive infrastructure installation along the Yellow River and Riverside Drive with bids due February 10, 2022 and a pre-bid meeting scheduled for February 1, 2022 at 2:00 p.m. via WebEx (telephone dial-in: 1-408-418-9388, access code 2345 806 4746).

The scope encompasses approximately 2,400 feet of 24-inch ductile iron pipe (DIP) and 100 feet of 8-inch DIP gravity sewer installation; approximately 8 sanitary sewer manholes; approximately 75 feet of 6-inch and 1,100 feet of 8-inch DIP water mains; three fire hydrant assemblies; connections to two existing water mains; a Yellow River crossing; a temporary access driveway; sewer service connections; concrete flume restoration; sidewalk, curb, and gutter replacement; roadway reconstruction; driveway cut repair; replacement of existing corrugated metal pipe storm drains with reinforced concrete pipe; traffic control; bypass pumping; site restoration and cleanup; and preparation of record drawings. All work delivers a complete and functioning system per project specifications.

Three bidders submitted proposals. Site Engineering, Inc. (out-of-county) was the lowest bid at $4,498,200; JDS, Inc. (local) bid $4,184,600; GS Construction, Inc. (local) bid $7,017,042.28. Site Engineering, Inc. is identified as the recommended award. The bid tabulation itemizes approximately 60 line items covering earthwork, utility piping, precast concrete structures, paving, erosion control, landscaping, water distribution components, river crossing installation, and bypass pumping operations with unit pricing for each bidder.

Acknowledgment of Addendum 2 is required on the Bid Form, page 16, and failure to acknowledge may render a proposal non-responsive.

Opportunity text

The work for the Middle Yellow River Interceptor project includes the installation of approximately 2,400 feet of 24-inch DIP and 100 feet of 8-inch DIP gravity sewer along the Yellow River and Riverside Drive, installation of approximately 8 manholes, installation of approximately 75 feet of 6-inch and 1,100 feet of 8-inch DIP water mains, three fire hydrant assemblies, connection to two existing water mains, a river crossing of the Yellow River, installation of a temporary access driveway, installation of sewer service connections, restoration of concrete flumes, sidewalk replacement, curb and gutter replacement, roadway reconstruction, driveway cut repair, replacement of existing CMP storm drains with RCP piping, traffic control, bypass pumping, site restoration and clean-up, preparation of record drawings, and all related appurtenances for a complete and functioning system as shown on the Drawings or specified.

Files

File Type Posted
ADD2 —
Award Information —
Notice of Bid —
ADD 1 —

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity