Gravity Sewer Replacement South ZONE 1

Open State & local contract opportunity Posted

Solicitation number
2026-114
State
Georgia
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

Chatham County, Georgia is soliciting bids under Invitation to Bid ITB2026-114 for gravity sewer replacement in its South Zone 1 area, with bids due December 2, 2026. The solicitation was posted November 5, 2026.

The project replaces damaged and deteriorated gravity sewer mains along Miller Avenue, 9th Street, and 2nd Avenue to restore the structural integrity, reliability, and functionality of the wastewater collection system. Scope includes approximately 2,000 linear feet of new 8-inch PVC gravity sewer piping at varying depths, new sanitary sewer manholes, saddle manhole connections, flexible boot connections, and connections to existing mains and manholes. The contractor also abandons existing 4-inch and 8-inch sewer mains and manholes where indicated, using flowable fill, and performs asphalt removal and replacement, stone bedding, sand backfill, erosion and sediment control, and other incidental construction.

The contractor maintains existing sanitary sewer service throughout construction and provides temporary wastewater bypass pumping or other approved means of flow management to prevent service interruptions and sanitary sewer overflows. Emergency-service access remains open throughout construction, and resident access is restored at the end of each construction day unless the owner approves otherwise. Construction activities are coordinated to minimize disruption to surrounding properties, residents, and vehicular traffic.

Opportunity text

The project generally includes the following: The construction of sanitary sewer system improvements consisting of the replacement of existing damaged and deteriorated gravity sewer mains along Miller Avenue, 9th Street, and 2nd Avenue. The primary objective of the project is to replace broken and deteriorated sanitary sewer infrastructure to restore the structural integrity, reliability, and functionality of the existing wastewater collection system.

Improvements generally consist of the installation of approximately 2,000 linear feet of new 8-inch PVC gravity sewer piping at varying depths, installation of new sanitary sewer manholes, connections to existing sewer mains and manholes, and the abandonment of existing sewer mains and manholes where indicated. Additional components include saddle manhole connections, flexible boot connections, abandonment of existing 4-inch and 8-inch sewer mains utilizing flowable fill, removal and replacement of existing asphalt pavement, stone bedding, sand backfill, erosion and sediment control measures, and other incidental construction necessary to complete the sanitary sewer improvements. CONTRACTOR shall be responsible for maintaining existing sanitary sewer service and providing temporary wastewater bypass pumping or other approved means of flow management as necessary throughout construction to prevent interruptions in service and sanitary sewer overflows. Construction activities shall be coordinated to minimize disruptions to surrounding properties, residents, and vehicular traffic. Access shall be maintained for emergency services throughout construction and restored for residents at the conclusion of each day of construction, unless otherwise approved by the OWNER.