“PROPOSAL: 2025 Cortez Natatorium Rehabilitation Project Design”
Closed State & local contract opportunity Posted
- Solicitation number
- RFP #GS-25-RC/ND
- State
- Colorado
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- UNSPSC codes
- 83000000 Public Utilities and Public Sector Related Services
- 73130000 Food and beverage industries
- 78140000 Transport services
- 90120000 Travel facilitation
- 72121602 Offshore wind farm environmental survey
- 80150000 Trade policy and services
- 82110000 Writing and translations
- 72154063 Stopple or line stopping service
- 78120000 Material packing and handling
- 81120000 Economics
Show all 23
- 90140000 Commercial sports
- 93170000 Trade policy and regulation
- 72121600 Offshore wind farm service
- 72121601 Offshore wind farm development and project management
- 72121605 Offshore wind farm operation, maintenance and service
- 72121606 Offshore wind farm decommissioning
- 90000000 Travel and Food and Lodging and Entertainment Services
- 73140000 Fibers and textiles and fabric industries
- 71100000 Mining services
- 93150000 Public administration and finance services
- 72121603 Offshore wind farm geotechnical survey
- 72121604 Offshore wind farm installation and commissioning
- 72154062 Hot tapping service
- Points of contact
-
- Vickie Haddix vhaddix@cortezco.gov (970) 565-7320
- Casey Simpson csimpson@cortezco.gov (970) 565-7320
Opportunity details come from bidnetdirect.com. Updated .
About this opportunity
The City of Cortez, Colorado is seeking proposals for the 2025 Cortez Natatorium Rehabilitation Project Design, a comprehensive design contract for renovating the existing Natatorium at the Cortez Recreation Center. The project requires an integrated design addressing multiple deferred maintenance items, including resurfacing approximately 11,000 square feet of pool facilities, modifying pool grate infrastructure, replacing pool tiles, removing and replacing ceiling-affixed acoustic baffles, reconstructing the leisure pool play structure, and installing permanent steps in the competition lap pool. Mandatory site visits are scheduled for September 5, 2025, at 9:00 AM and September 9, 2025, at 10:30 AM, with proposals due on October 2, 2025, at 3:00 PM. Vendor evaluation criteria will include technical approach, past performance, project management capabilities, staffing plan, safety record, and local presence. Proposing firms must demonstrate experience in design contracting services and provide a detailed project approach, with a projected Notice of Award on October 15, 2025. The contract term is anticipated to be 90 calendar days from the Notice to Proceed, with construction expected to commence on June 1, 2026.
Vendors must carry comprehensive insurance coverage, including general liability, automobile liability, and professional liability, with minimum combined single limits of $1,000,000 per occurrence. The City of Cortez has implemented a local vendor preference policy, offering a 2.5% preference for businesses within city limits and a 2.0% preference for businesses in Montezuma County, with a maximum preference amount of $25,000. While no specific set-aside designations for disadvantaged enterprises are mentioned, the procurement appears open to qualified design firms with relevant experience in municipal recreation facility rehabilitation. The project aims to revitalize a facility that has received minimal updates since its initial construction in 2003, with the primary goal of reducing pool closure time and improving overall facility condition. Though a specific budget range is not explicitly stated, the comprehensive nature of the rehabilitation design suggests a significant investment in modernizing and maintaining the Cortez Recreation Center's Natatorium.
Opportunity text
Proposal of an integrated design that will be used to rehabilitate existing Natatorium, addressing deferred maintenance items at the Cortez Recreation Center, 425 Roger Smith Avenue, Cortez, Colorado. Scope of work to include: resurface existing pool facilities; modify pool grate infrastructure; remove and replace pool tile; replace ceiling-affixed acoustic baffles; remove and replace play structure within leisure pool; and construct permanent steps into the competition lap pool. The Cortez Parks and Recreation Department hopes the results of this design will include a firm understanding of the work that needs to be done, project sequencing, the scope of work, and feasibility of proposed work. Following acceptance of the design, the City will then bid out the project for repairs.
Files
| File | Type | Posted |
|---|---|---|
| RFP Natatorium DESIGN -cw.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity