Pre-Advertisement Notice for Grove Park Recreation Center Design Build
Open State & local contract opportunity Posted
- Solicitation number
- PE-66062-NONST-2027-000000492
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 90607 Architect Services, Professional
- 90610 Buildings - Architectural Design
- 90638 General Construction - Architectural
- 90924 Building Construction, Commercial And Institutional
- 91240 Demolition Services
- 91244 Excavation Services
- 92536 Engineering Services (Not Otherwise Classified)
- 92544 General Construction: Management, Scheduling, Cost Estimation - Engineering
- UNSPSC codes
- 95121500 Commercial and entertainment buildings and structures
- 95121704 Prison building
- 95121503 Cafeteria
- 95121703 Court building
- 95121606 Railway station
- 95121701 Post office
- 72141504 Timber removal service
- 72121105 Shopping center and mall construction service
- 72141401 Detention facility construction service
- 95121604 Bus garage
Show all 50
- 95121607 Railway depot
- 95121605 Automotive repair or servicing building
- 95121711 Civic center
- 72141503 Rock removal service
- 73151801 Sheeting services
- 81102501 Mine permitting service
- 72121100 Commercial and office building construction services
- 95121700 Public buildings and structures
- 72111104 New dormitory construction service
- 72111105 New hotel or motel construction service
- 72121101 Commercial and office building new construction service
- 72141128 Public square construction and or remodelling service
- 95121702 Police station
- 95121603 Bus station
- 95122106 Hostel
- 95121505 Shopping center
- 95121504 Shop building
- 95121714 Public changing room and shower facility
- 95121507 Market
- 95121706 Ambulance station
- 72141508 Blasting service except building demolition
- 72141510 Demolition services
- 72141505 Earthmoving service
- 73151802 Slitting services
- 81101607 Textile engineering service
- 81103406 Conceptual Studies and Pre-Front-end engineering design services
- 72141400 Detention facility construction and repair services
- 72121104 Restaurant construction service
- 95121712 Art gallery
- 95121608 Underground railway station
- 95121501 Shopping mall
- 95121715 Public toilet facility
- 95121506 Theater
- 95121705 Fire station
- 81000000 Engineering and Research and Technology Based Services
- 81100000 Professional engineering services
- 81101529 Acoustic engineering
- 81101531 Sanitation engineering service
- 81101606 Marine engineering
- 81102702 Process control system design and engineering service
- Point of contact
-
- Mark Coleman-Mabry mscoleman-mabry@atlantaga.gov (404) 782-3397
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The City of Atlanta, through the Department of Procurement on behalf of the Department of Parks and Recreation, is seeking proposals from qualified Design Build firms for the Grove Park Recreation Center Replacement Project under RFP-DPR-26XX-XXXXXXX, with a pre-solicitation conference to be announced and proposals due November 10, 2026. Joint venture participation is required, with M/FBE participation goals of 25 percent MBE and 10 percent FBE; all M/FBE subcontractors and joint venture members must be certified by the City of Atlanta's Office of Contract Compliance prior to bid submission.
The scope encompasses comprehensive design-build delivery: design, permitting, engineering, demolition, site preparation, construction, quality assurance, and facility turnover. The contractor must deliver a new recreation center on the deconstructed footprint of the existing facility with architectural, structural, mechanical, plumbing, and electrical design; erosion and sediment control; landscape plans; and operations and maintenance documentation. The facility design must comply with the 2018 International Building Code with Georgia Amendments, 2015 International Energy Conservation Code, 2018 International Mechanical, Plumbing, Fuel Gas, and Fire Codes, and the 2020 National Electrical Code. The recreation center shall include six telescoping basketball goals, a gymnasium with elevated running track, passenger elevator, public access and video surveillance systems, and fixture, furnishings, and equipment with a 1.5 percent allowance of total construction cost. The contractor assumes all risk related to existing site conditions, including field surveys, geotechnical investigations, and utility location.
Substantial completion is required within 540 calendar days and final completion within 570 calendar days from Notice to Proceed. Liquidated damages are assessed at $500 per working day for failure to meet Substantial Completion and $1,000 per working day for failure to achieve Financial Completion. Design submittals must be provided in ten hard copies plus PDF format, with drawings prepared in AutoCAD Release 2024 on 22-inch by 34-inch paper using the City's standard title block. The cost proposal requires itemized allowances: Owner's Allowance of $500,000, Partnering Allowance of $2,000, and LEED Certification Process Allowance of $150,000.
Evaluation criteria total 100 points: Executive Summary/Organizational Structure (10), Key Personnel and Experience (15), Management Plan (10), Conceptual Submittal (35), Sustainability Elements (10), and Cost Proposal (20). Insurance requirements include Commercial General Liability of $2 million per occurrence / $4 million aggregate, Professional Liability of $1 million per occurrence, and Performance and Payment Bonds each equal to 100 percent of contract value. All insurance carriers must maintain Best's rating of A- or higher.
Opportunity text
The City of Atlanta, through the Department of Procurement on behalf of the Department of Parks and Recreation, will soon advertise a Request for Proposals (RFP) for qualified Design Build firms to deliver the Grove Park Recreation Center Replacement Project. Interested firms will be evaluated based on demonstrated experience, technical capability, ability to meet schedule requirements, and capacity to manage multidisciplinary design¿build delivery. The City¿s expectation is that the selected Design¿Build team will be responsible for comprehensive project execution encompassing design, permitting, engineering, construction, quality assurance, and facility turnover. A Pre¿Solicitation Conference will be announced to provide additional project clarity and address vendor questions regarding criteria, deliverables, and expectations.
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity