Planned Residential Fill Removal & Replacement Group 8. 28. 2026 ( 6002 Belvidere)
Closed State & local contract opportunity Posted
- Solicitation number
- 300000151806518
- State
- Michigan
- Responses due
Opportunity facts
- Point of contact
-
- Elisha Wright wrightel@detroitmi.gov (313) 224-4737
Updated .
About this opportunity
The City of Detroit Office of Contracting & Procurement is requesting quotes for planned residential fill removal and replacement at 6002 Belvidere under the Detroit Demolition Program, with quotes due September 1, 2026. Vendors must be pre-qualified suppliers for Planned Residential and/or Emergency Residential demolition work under Detroit Demolition Program RFQQ #1 and remain subject to the terms and discipline requirements of their pre-qualification status.
The scope encompasses excavation and loadout of non-hazardous fill material and debris (estimated 605 tons), disposal of foundations and footings, backfill installation with Category 2–approved materials below 12 inches (estimated 425 tons), topfill for the top 12 inches (estimated 180 tons), sidewalk replacement for five flags, and site cleanup. All estimated quantities are subject to variation; the City reserves the right to assign work in whole or in part to different vendors. Compensation is based solely on actual quantities removed and replaced using submitted unit rates, not estimated quantities. Backfill materials must comply with Michigan Part 201 Residential Cleanup Criteria. An Owner's representative must be present on-site during excavation and backfill operations.
The property is 3,615 square feet at Parcel ID 19007688.001, Detroit, Michigan 48213. Work must commence within seven calendar days of Notice to Proceed, with fill removal and inspection requests completed within one calendar day of excavation start, backfill and grading completed within fourteen calendar days, and sidewalk replacement within forty-five calendar days. Pricing shall be submitted using the provided Excel Price Sheet and Professional Rate Schedule with unit rates for mobilization, disposal, backfill, topfill, sidewalk replacement, and site cleanup. Hazardous material disposal is subject to a percentage markup on costs. Quotes remain binding for 365 calendar days. Successful vendors must provide 100% performance and payment bonds within five business days of award and maintain Certificates of Insurance naming the City as additional insured. The City reserves the right to consider local preferences and equalization factors in award decisions.
Opportunity text
Planned Residential Fill Removal & Replacement Group 8.28.2026 ( 6002 Belvidere)
Files
| File | Type | Posted |
|---|---|---|
| Scope of Services_Fill Removal and Replacement_1.14.2026 (9) (2).pdf | ||
| Fill Removal and Replacement RFQ Notes To Include_1.14.2026_6002 Belvi (1).docx | DOCX document | |
| 6002 Belvidere_Fee Schedule_Fill Removal Replacement_8.28.2026 (1).xlsx | XLSX spreadsheet | |
| Signature_Page 2 25 2020.rtf | RTF text file | |
| RFQ Planned Residential Backfill.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity