About this file
This is a contractor rate schedule submitted by Doe Demolition, Inc. for the City of Detroit Demolition Program project at 6002 Belvidere in Michigan, involving the removal and replacement of fill material at a residential property. The scope of work includes two primary phases: excavation and load out of non-hazardous fill material and debris, and backfill, grading, and site finalization. The excavation phase encompasses mobilization, disposal of fill material and other debris at an estimated 605 tons, and potential disposal of foundations and footings. The backfill phase includes mobilization, installation of backfill material below 12 inches at an estimated 425 tons, topfill material for the top 12 inches at an estimated 180 tons, sidewalk replacement for 5 flags, and site cleanup including seed and straw application. All estimated unit quantities are subject to variation based on actual site conditions, and the City reserves the right to assign work in whole or in part to different vendors.
Doe Demolition, Inc., with principal contact Jane Doe serving as President, submitted this fee schedule with all unit rates listed at $0.00, resulting in a grand total cost of $0.00 for evaluation purposes. The rate schedule indicates that unit rates include all personnel, materials, transportation to and from the site, administrative costs, overhead, and profit. The contractor is eligible for only one mobilization occurrence per property unless otherwise directed by the City. Compensation will be based solely on actual quantities of material removed and replaced using the submitted unit rates, not on the estimated quantities provided in the fee schedule. Hazardous material disposal is subject to a percentage markup on costs.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Scope of Services_Fill Removal and Replacement_1.14.2026 (9) (2).pdf | ||
| Fill Removal and Replacement RFQ Notes To Include_1.14.2026_6002 Belvi (1).docx | DOCX document | |
| Signature_Page 2 25 2020.rtf | RTF text file | |
| RFQ Planned Residential Backfill.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor Rate Schedule
| Organization Name: | Doe Demolition, Inc. |
| Business Address: | 1234 Fifth Street |
| Point(s)-of-Contact: | Jane Doe, President |
| E-mail Address(es): | jane.doe@doedemolition.com |
| Phone #(s): | 313.313.3113 |
| Service Type | Unit Type | Unit Rate | Estimated Units4 | Total Cost |
| EXCAVATION AND LOAD OUT | ||||
| Mobilization | Per Occurrence1 | $0.00 | 1 | $0.00 |
| Non-Haz Disposal: Fill Material & Other Debris | Per Ton2 | $0.00 | 605 | $0.00 |
| Non-Haz Disposal: Foundations & Footings (if applicable) | Per Ton2 | $0.00 | 0 | $0.00 |
| Hazardous Disposal: Fill Material & Other Debris | % Markup (Cost +) | 0.00% | ||
| BACKFILL, GRADE, & SITE FINALIZATION | ||||
| Mobilization | Per Occurrence1 | $0.00 | 1 | $0.00 |
| Backfill Material (Below 12 inches) | Per Ton2 | $0.00 | 425 | $0.00 |
| Topfill Material (Top 12 inches) | Per Ton2 | $0.00 | 180 | $0.00 |
| Sidewalk Replacement | Per Flag3 | $0.00 | 5 | $0.00 |
| Seed & Straw/Site Clean-up | Per Site3 | $0.00 | 1 | $0.00 |
| Grand Total 5 | $0.00 |
1-Per occurence defined as when heavy equipment is mobilized only. Contractors are only eligible for one occurrence per property, unless otherwise directed by the City.
2-Unit rate includes all personnel, material, transportation to/from the assigned site(s), adminstrative costs and overhead and profit.
3-City reserves to right to assign this work in whole, or in part, and the City reserves the right to assign different aspects of the scope of services to another vendor(s).
4-All units provided in Column D of the Fee Schedule are estimates, the actual quantity of material that needs to be removed and replaced may vary.
5- The total amounts in Column E, including the Grand Total, will be used for evaluation purpose only. The successful vendor will only be compensated for actual amounts of material removed and/or replaced using the unit rates in Column C.
&"-,Bold"CITY OF DETROIT DEMOLITION PROGRAM 6002 Belvidere REMOVAL AND REPLACEMENT OF FILL MATERIAL mailto:jane.doe@doedemolition.com