Pipe repair-edisto

Awarded State & local contract opportunity

Solicitation number
5400019710
State
South Carolina
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from apps.sceis.sc.gov. Updated .

About this opportunity

The South Carolina Department of Transportation (SCDOT) has issued an Invitation for Bid (IFB) for a pipe repair project located in Edisto Beach, specifically targeting a 150-foot 48-inch reinforced concrete pipe (RCP) at Whaley Street and Jungle Shores Drive. The procurement seeks a contractor to perform comprehensive pipe repair services, including damming, dewatering, injection grouting, and spin casting to seal joints and stop infiltration. Contractors have the option to provide a structurally independent new Spincast CCCP for the existing substandard pipe. The project requires video documentation of pipe conditions before and after work, with remote video recording available as an optional contractor method. Key project dates include a mandatory pre-bid conference and site visit on April 29, 2020, a deadline for questions on April 30, 2020 at 2:00 p.m., and sealed bid submissions due on May 7, 2020 at 2:30 p.m. Award notification is scheduled for May 14, 2020, with an initial contract term estimated from May 22, 2020 to July 31, 2020. Contractors must submit unit prices for two line items: a base 48" Pipe Repair for 150 feet and an optional Spincast CCCP, with the low bid determined by summing extended prices.

The solicitation does not specify any specific set-aside designations or restrictions for disadvantaged enterprises. Contractors must be registered with the State of South Carolina as a vendor and maintain specific insurance requirements, including commercial general liability insurance with minimum limits of $1,000,000 per occurrence, auto liability insurance at $1,000,000 per accident, and workers' compensation insurance as required by state law. The contractor will be responsible for a ten-year warranty on injection grouting and a twenty-five-year warranty for combined injection grouting and spincasting. While no specific budget range is explicitly stated, the project involves precise technical specifications and requires contractors to verify constructability and provide alternative methods such as 42-inch Snap-Tite liner pipe using slip-lining methodology. The award will be made to the lowest responsible and responsive bidder, subject to Transportation Secretary approval, which may require an additional ten days for review. Bidders must submit a signed cover page and Page Two, and must hold their offers open for a minimum of 30 calendar days following the opening date.

Opportunity text

*PIPE REPAIR-EDISTO

Files

File Type Posted
Attachment B.jpg JPG image
Solicitation.pdf PDF
Attachment C.jpg JPG image
Amendment 1.pdf PDF
Attachment D.pdf PDF
Attachment A.jpg JPG image

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors