Philip Street Bridge Replacement

Closed State & local contract opportunity Posted

Solicitation number
BD-17-1806-MED01-MED01-24312
State
Massachusetts
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from commbuys.com. Updated .

About this opportunity

The Town of Medfield, Massachusetts is seeking bids for the Philip Street Bridge Superstructure Replacement project in Norfolk County. The scope of work includes the removal of the existing timber bridge structure and installation of a prefabricated timber bridge, as well as cleaning the existing bridge seat, completing localized concrete repairs to the existing substructure, cutting and installing new anchor bolts, and repairing loose and displaced stones and voids in the existing masonry walls. General bidders must be pre-qualified by the Massachusetts Department of Transportation in the Bridge Construction or Bridge Culverts categories, and bids will be accepted until 10 AM on March 22, 2018. The contract will be awarded to the lowest responsible and eligible bidder based on qualifications and bid price, and the successful bidder will be required to provide 100% performance and payment bonds. The project is subject to applicable Massachusetts General Laws, including minimum wage requirements and weekly payroll record submittal provisions.

This procurement does not appear to have any set-aside designations or restrictions on the types of organizations that can respond. The Invitation for Bids does not indicate any incumbent vendors or current contractors, nor does it provide any information on existing infrastructure or technology that requires integration. The contract award may be subject to an appropriation, but no specific award value or budget range is provided in the available documentation.

Opportunity text

Superstructure replacement of the timber bridge carrying Philip St. over Mine Brook, cleaning the existing bridge seat and completing localized concrete repairs to the existing substructure, cutting the existing anchor bolts flush and installing new anchor bolts, and repairing loose and displaced stones and voids in the existing masonry walls. The bridge superstructure replacement is comprised of removal of the existing timber bridge structure and installation ofa prefabricated timber bridg

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity