PCCP Patching I-135 Harvey County
Solicitation # 526086565
Posted 8/17/26, 1:00 AM
No Updates
Due 8/19/26, 1:00 AM
Similar Opportunities
- The Kansas Department of Transportation is seeking sealed bids for Portland Cement Concrete Pavement (PCCP) patching on Interstate 135 in Sedgwick County, with bids due August 19, 2026 at 1:00 p.m. local time through the Bid Express electronic bidding system. The scope covers 3.760 miles of mainline, acceleration/deceleration lanes, and ramps from the HMA/PCCP joint south of 47th Street north to the bridge over Pawnee. Work includes 4,710 square yards of full-depth PCCP patching (11-inch), 335...
- The Kansas Department of Transportation (KDOT) is soliciting bids for Portland Cement Concrete Pavement (PCCP) patching on K-96 highway across Reno and Sedgwick Counties, with bids due August 19, 2026. The project comprises two segments totaling 29.19 miles: KA 8029-01 from the Reno/Sedgwick County line east to North 119th Street in Sedgwick County, and KA 8028-01 from the K-14/K-96 Junction east to the Reno/Sedgwick County line in Reno County. Contractors must comply with state prevailing...
- The Kansas Department of Transportation is requesting sealed bids for milling and hot mix asphalt overlay work on US-59 in Labette County, extending 0.155 miles north from the Concrete/Asphalt Joint just north of North Parsons centerline, with bids due August 19, 2026. The project scope consists of milling and HMA overlay construction on the specified segment. Contract award will be made to the lowest responsive and responsible bidder meeting all qualification requirements and technical...
- The Kansas Department of Transportation is requesting bids for pedestrian and bicycle paths construction in the City of Sedgwick in Harvey County, with electronic proposals due August 19, 2026 at 1:00 PM Local Time via Bid Express, and bids opening and reading at 3:00 PM the same day at the Eisenhower State Office Building in Topeka. The scope encompasses 0.08 miles of pedestrian and bicycle paths west of North Commercial Avenue from 5th Street to 6th Street, including site clearing and...
- The Kansas Department of Transportation (KDOT) Bureau of Construction and Materials is soliciting electronic bids for chip seal construction on K-27 highway in Cheyenne County, with proposals due August 19, 2026 at 1:00 p.m. local time and opening at 3:00 p.m. the same day. The project covers 21.106 miles of K-27 from the West US36/K-27 junction north to the Kansas/Nebraska state line. Work includes mobilization, flagger services, traffic control, chip seal application, cover material (CM-L-2)...
- The Kansas Department of Transportation (KDOT) is soliciting electronic bids for chip seal surface treatment on a 9.369-mile section of US Route 36 in Norton County, with proposals due August 19, 2026 at 1:00 p.m. local time and opening at 3:00 p.m. the same day at the Eisenhower State Office Building in Topeka. Contractors must be prequalified and registered as bid holders on KDOT's website no later than 5:00 p.m. on the Monday preceding the letting date (August 18, 2026). All contractors and...
- The Kansas Department of Transportation is soliciting bids on milling and hot mix asphalt overlay work on K-61 in Reno County, spanning 17.664 miles from the Pratt/Reno County Line to the South EWS Bridge (043), with bids due August 19, 2026. The project is tied to KA 8036-01. The scope encompasses pavement milling and asphalt overlay construction on the specified highway segment. Bidders must comply with Kansas Department of Transportation standards, specifications, and contract documents...
- The Kansas Department of Transportation (KDOT) is requesting bids for grading, bridge, and surfacing work on I-70 Bridge 017 over Franks Creek and B Road (3.13 miles east of I-70/US-40B West Junction) and Bridge 019 over US-40B/K-57 at the K-57/I-70 Junction in Geary County, with proposals due August 19, 2026 at 1:00 p.m. Local Time. The scope encompasses excavation, concrete work, structural steel fabrication, bridge construction and repair, asphalt and concrete surfacing, rumble strips,...
- The Kansas Department of Transportation is requesting bids for milling and hot mix asphalt overlay work on K-61 in Pratt County, with bids due August 19, 2026 at 1:00 p.m. Local Time and opening at 3:00 p.m. the same day. Contractors must be prequalified with KDOT and submit electronic proposals exclusively through Bid Express using AASHTO's Project Bids software; contractors must also register as bid holders by 5:00 p.m. on the Monday preceding the letting date. The project covers 16.812...
- The Kansas Department of Transportation is soliciting sealed bids for chip seal application on US-77 in Cowley County from the north city limit of Winfield to the junction of K-15, a total net length of 9.821 miles, with bids due August 19, 2026. The scope includes surface preparation, application of asphalt emulsion, and placement of aggregate chips on the designated highway section. Pricing is submitted on a unit-price basis. The contract will be awarded to the lowest qualified bidder...
The Kansas Department of Transportation is requesting sealed bids for Portland Cement Concrete Pavement (PCCP) patching on Interstate 135 in Harvey County, with bids due August 19, 2026. The work covers a 5.985-mile segment of I-135 extending from 0.3 miles north of Southeast 54th Street North to the K-151-135 Junction. The scope includes all materials, labor, and equipment necessary to complete pavement patching in accordance with Kansas Department of Transportation specifications and standards. Bidding is on a unit-price basis. The contract will be awarded to the lowest responsive and responsible bidder. Contractors must review all bid documents, including scope of work and technical specifications, to ensure accurate cost estimation.
Generated 8/18/26, 9:34 AM
Name | Description | Size | Type | Posted |
|---|---|---|---|---|
Bid Notice-PCCP Patching I-135 Harvey County.pdf | 3MB | 8/17/26 |