Passenger Rail Serv Development Plan-Atl. to Sav.

Cancelled State & local contract opportunity Posted

Solicitation number
PNA-484-021023
State
Georgia
Responses due

Opportunity facts

Point of contact

Opportunity details come from ssl.doas.state.ga.us. Updated .

About this opportunity

The Georgia Department of Transportation is issuing an RFQ to develop a Passenger Rail Service Development Plan for the Atlanta to Savannah corridor, with the prior PNA 484-021023 now cancelled and all submittals directed to replacement RFQ 484-020623. Statements of Qualifications are due February 6, 2023.

The Prime Consultant must hold Georgia DOT prequalification in either Statewide Systems Planning or Urban Area and Regional Transportation Planning. The broader team must include prequalified subconsultants across Mass and Rapid Transportation Planning, Alternate System Planning, and NEPA Documentation specialties (history, air studies, noise studies, ecology, and archaeology). Key anticipated team roles span Data Collection, Modeling, Outreach, Passenger Rail Finance, Environmental Screening and NEPA, Passenger Rail Operations, and Passenger Rail Design.

The scope includes a comprehensive Passenger Rail Feasibility Study and initiation of an Environmental Impact Statement for the approximately 250- to 270-mile corridor between Atlanta and Savannah, with a study area spanning approximately 11,300 square miles. Work requires identification of service needs for the proposed passenger rail route. Additional required prequalification areas include attitude and opinion studies related to public involvement, location studies, major investment studies, mass transit feasibility and technical studies, land surveying (engineering, geodetic), aerial photography and photogrammetry, and topographic remote sensing capabilities including LIDAR, SONAR, thermal, and infrared imaging.

Prospective consultants should contact the Georgia Department of Transportation Office of Procurement Engineering and Design Services for submittal instructions and full scope details in RFQ 484-020623.

Opportunity text

**PNA 484-021023 has been cancelled, refer to RFQ 484-020623 for submittal instructions and evaluation requirements. ** The purpose of the PNA is to inform the Consultant community of the upcoming RFQ opportunity to conduct a Passenger Rail Service Development Plan-Atlanta to Savannah. Full scope of work, instructions and requirements for the upcoming RFQ-484-020623 are to be posted as indicated in the anticipated schedule in PNA document. No questions or submittals are due during the PNA.

Files

File Type Posted
PNA-484-021023 Passenger Rail —

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity